Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 5 of 5

Full-Text Articles in Environmental Policy

Unconventional Energy, Fall/Winter 2015, Issue 31 Sep 2019

Unconventional Energy, Fall/Winter 2015, Issue 31

Sustain Magazine

No abstract provided.


Restructuring Of The Electric Utility Industry: Free Markets And Environmental Protection, Rick Gilliam Jun 1997

Restructuring Of The Electric Utility Industry: Free Markets And Environmental Protection, Rick Gilliam

Dams: Water and Power in the New West (Summer Conference, June 2-4)

12 pages.

Contains 1 page of references.


Agenda: Dams: Water And Power In The New West, University Of Colorado Boulder. Natural Resources Law Center Jun 1997

Agenda: Dams: Water And Power In The New West, University Of Colorado Boulder. Natural Resources Law Center

Dams: Water and Power in the New West (Summer Conference, June 2-4)

Conference organizers and/or speakers included University of Colorado School of Law professors David H. Getches, Douglas S. Kenney, Kathryn M. Mutz, Elizabeth Ann (Betsy) Rieke, Charles F. Wilkinson and Lawrence J. MacDonnell.

The keynote address by Charles F. Wilkinson is titled Coming to Grips with Growth in the West: Traditional Communities, Free Rivers and the New Megalopoli, and it will be held on Monday, June 2, at 12:30 p.m. in the Lindsley Memorial Courtroom of the law school. Wilkinson is a noted law professor, writer and authority on Western issues.

The conference will begin by providing historical context for the …


The Pacific Northwest Governors’ Comprehensive Energy Review: How Comprehensive?, Angus Duncan Jun 1997

The Pacific Northwest Governors’ Comprehensive Energy Review: How Comprehensive?, Angus Duncan

Dams: Water and Power in the New West (Summer Conference, June 2-4)

43 pages (includes illustrations).

Contains footnotes and 1 page of references.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England

Dickey-Lincoln School Lakes Project

The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …