Open Access. Powered by Scholars. Published by Universities.®
Social and Behavioral Sciences Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Animal Sciences (1)
- Aquaculture and Fisheries (1)
- Architectural Engineering (1)
- Business (1)
- Climate (1)
-
- Cultural Resource Management and Policy Analysis (1)
- Electrical and Computer Engineering (1)
- Engineering (1)
- Environmental Sciences (1)
- Forest Sciences (1)
- Fresh Water Studies (1)
- Life Sciences (1)
- Natural Resources Management and Policy (1)
- Oceanography and Atmospheric Sciences and Meteorology (1)
- Operations Research, Systems Engineering and Industrial Engineering (1)
- Other Business (1)
- Other Forestry and Forest Sciences (1)
- Other Geography (1)
- Physical Sciences and Mathematics (1)
- Physical and Environmental Geography (1)
- Policy Design, Analysis, and Evaluation (1)
- Power and Energy (1)
- Public Affairs, Public Policy and Public Administration (1)
- Recreation Business (1)
- Recreation, Parks and Tourism Administration (1)
- Risk Analysis (1)
Articles 1 - 2 of 2
Full-Text Articles in Social and Behavioral Sciences
An Overview Of The Proposed Dickey-Lincoln School Lakes Hydro-Electric Project : Aroostook County, Maine, New England Division, Department Of The Army, Corps. Of Engineers, Department Of Energy
An Overview Of The Proposed Dickey-Lincoln School Lakes Hydro-Electric Project : Aroostook County, Maine, New England Division, Department Of The Army, Corps. Of Engineers, Department Of Energy
Dickey-Lincoln School Lakes Project
An overview of The Dickey-Lincoln Project in northern Aroostook County, Maine is a proposed Federally financed hydro-electric power generating facility. Electric energy generated by the facility would be introduced into the New England Power Pool system through construction of new transmission lines across northern Maine, New Hampshire, and Vermont.
Responsibility for investigation and construction rests in the two Federal agencies, i.e. dams and reservoirs in the U.S. Army Corps of Engineers and transmission lines in the U.S. Department of Energy (DOE). The two actions are part of the same proposal, although they are in essence separate and distinct. The dams …
Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy
Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy
Dickey-Lincoln School Lakes Project
This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.