Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc. Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc.

Dickey-Lincoln School Lakes Project

The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west. Major tributaries of the St. John affected by …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

A review of available literature on rural communities which have been affected by construction projects of a similar scale has been completed. This review will aid in the development of a scenario of the construction labor peak and decline effects on the Dickey-Lincoln area.


Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the results of Task 2 of this study, the overall purpose of which is the evaluation of alternative methods of providing electrical energy in New England in lieu of the Dickey-Lincoln hydroelectric project. The final Task 1 report was presented in July 1976 and will, in conjunction with this Task 2 and subsequent Tasks 3 and 4 reports, ultimately become part of the "Environmental Impact Statement" for the Dickey-Lincoln Project.


Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the detailed findings of Tasks 1 through 4 of the Dickey-Lincoln School Lakes Project Power Alternatives Study undertaken for the New England Division of the Corps of Engineers, by Acres American Incorporated, Consulting Engineers of Buffalo, New York under the terms of Contract Number DACW33-76-C-0047. Earlier reports on Task 1 dated July 1976, on Task 2 dated January 1977 and on Task 3 dated March 1977 have been incorporated virtually unchanged into this Task 4 report.


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine: Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine: Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical supplement will be of particular interest to …