Full-Text Articles in Water Resource Management

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The Final Impact Statement is supported by all appendices from all drafts as well as supplementary information provided in Supplements to those Appendices. It comprises three volumes. Volume I is the statement volume. Volume II consists of two parts. Part I contains the comment and response portion of Section 9 for the 1977 Draft EIS. Part II contains comments and responses on the 1978 Revised Draft EIS, in addition to reproductions of the original comment letters received on the Draft Fish and Wildlife Mitigation Report and responses to these comments. Volume III, Part I contains reproductions of the original comment …


Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division Jan 1980

Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division

Dickey-Lincoln School Lakes Project

The Dickey Lincoln School Lakes Project is a proposed multipurpose project located on the upper reaches of the St. John River in Aroostook County, Maine. Development would consist of two dams with associated reservoirs and hydroelectric generating facilities, five dikes and transmission lines. A more detailed description of the proposed project and its associated impacts is contained within the Revised Draft Environmental Impact Statement for the proposed project.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division Jan 1980

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division

Dickey-Lincoln School Lakes Project

The purpose of this Draft Supplement (SDEIS) to the Revised Draft Environmental Impact Statement (RDEIS) is to evaluate the environmental impacts of the Fish and Wildlife Mitigation Plan proposed for Implementation in conjunction with development of the Dickey-Lincoln School Lakes Project, Maine (Appendix K, RDEIS and Attachment 1 of the Report). Although the mitigation plan is intended to mitigate rather than impose adverse environmental impacts, the mitigation measures proposed do constitute a major Federal action requiring the development of a supplemental environmental impact statement pursuant to the National Environmental Policy Act of 1969.


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies (Supplement), Christoipher J. Schmitt, Dennis R. Sasseville, Normandeau Associates, Inc., New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies (Supplement), Christoipher J. Schmitt, Dennis R. Sasseville, Normandeau Associates, Inc., New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

Sediment mercury concentrations higher than levels normall y considered trace or background were encountered up to 80 cm belo w the sediment-water interface in samples obtained from four oligotrophi c lakes in northern Maine . These lakes are in three different watershed s and are as far as 65 km apart . The values reported are far lower than levels reported elsewhere from contaminated sites . The distributio n and magnitude of the sediment concentrations encountered suggest long-ter m diffuse mercury inputs to the lakes from the watersheds . In addition , concentrations up to twice as high in near-surface …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

A review of available literature on rural communities which have been affected by construction projects of a similar scale has been completed. This review will aid in the development of a scenario of the construction labor peak and decline effects on the Dickey-Lincoln area.


Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc Jan 1977

Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc

Dickey-Lincoln School Lakes Project

The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. This study develops and evaluates a concept plan for the recreation potential of the Dickey-Lincoln School project and assesses the recreational impact of this recommended concept plan.


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources Jan 1975

Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources

Dickey-Lincoln School Lakes Project

This report completes phase one of the study. It is intended to fill the need, recognized at the outset, for a broad framework within which subsequent more detailed study at the project level might take place. It is an overview of physical hydropower potential in the context of energy and water resources and demands, energy economics, and federal policy, organization, and practices pertaining to hydropower development and marketing.