Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 30 of 416

Full-Text Articles in Environmental Health and Protection

Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc. Oct 2026

Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Molly Roby Oct 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon, Molly Roby Oct 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling And Investigation Plan: Ur 54 – East Of Main And Gagnon, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 135 – Washoe Sampling Works, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 135 – Washoe Sampling Works, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 75 – National Dump, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 75 – National Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 160s – Syndicate Pit Dumps, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 160s – Syndicate Pit Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 68 – Little Mina-2, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 68 – Little Mina-2, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 171 – Blaine Center, Pioneer Technical Services, Inc. Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 171 – Blaine Center, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) 2025 Surface Water Compliance Evaluation Technical Memorandum (Dated June 29, 2026), Emma Rott Sep 2026

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) 2025 Surface Water Compliance Evaluation Technical Memorandum (Dated June 29, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report January – December 2025 (Dated May 29, 2026), Emma Rott Sep 2026

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report January – December 2025 (Dated May 29, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 68 – Little Mina-2, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 68 – Little Mina-2, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 57 – Little Mina-1, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 57 – Little Mina-1, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 171 – Blaine Center, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 171 – Blaine Center, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 75 – National Dump, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 75 – National Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 160s – Syndicate Pit Dumps, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 160s – Syndicate Pit Dumps, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty Sep 2026

Re: Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Final Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated September 8, 2026) And The 2026 Final Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated September 8, 2026), Emma Rott Sep 2026

Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Final Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated September 8, 2026) And The 2026 Final Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated September 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-42 Site Evaluation Summary Report (Sesr) (Dated July 22, 2026), Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-42 Site Evaluation Summary Report (Sesr) (Dated July 22, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit, Draft Final Unreclaimed Sites: Ur-31 Site Evaluation Summary Report, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit, Draft Final Unreclaimed Sites: Ur-31 Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.