Open Access. Powered by Scholars. Published by Universities.®

Robert Oleniacz

Municipal solid waste

Selected Works

Publication Year

Articles 1 - 3 of 3

Full-Text Articles in Environmental Health and Protection

Wpływ Zakładu Unieszkodliwiania Stałych Odpadów Komunalnych W Warszawie Na Jakość Powietrza, Robert Oleniacz, Jadwiga Antolak Nov 2010

Wpływ Zakładu Unieszkodliwiania Stałych Odpadów Komunalnych W Warszawie Na Jakość Powietrza, Robert Oleniacz, Jadwiga Antolak

Robert Oleniacz

The paper presents the results of air quality impact assessment carried out for the Municipal Solid Waste Disposal Plant in Warsaw. As part of the plant is working so far the only municipal solid waste incinerator in Poland. Following the evaluation, including data for the year 2008, it was found that it is a minor source of emissions to air and causes a slight air pollution. The highest maximum one-hour and annual average concentrations caused at ground level are many times lower than the respective reference (or permissible) values and background values for analyzed substances in the air. Increasing the …


Ocena Wpływu Planowanego Zakładu Termicznego Przekształcania Odpadów Komunalnych Na Jakość Powietrza W Krakowie, Robert Oleniacz, Maria Pilch Dec 2007

Ocena Wpływu Planowanego Zakładu Termicznego Przekształcania Odpadów Komunalnych Na Jakość Powietrza W Krakowie, Robert Oleniacz, Maria Pilch

Robert Oleniacz

Construction of the Municipal Solid Waste Incineration (MSWI) plant is considered optimal in the Programme of Management of Solid Waste in Krakow as well as in proposed scenarios of Municipal Waste Management. Evaluation of impact of the incineration plant with a capacity of 255000 tons per year on air quality in Krakow is presented in this work. The evaluation is based on assumption that air pollutant emissions from the incinerator will be at the highest allowed level resulting from emission limit values for waste incineration plants with operation time each of two planned lines 7500 hours per year. Calculation results …


Ocena Wpływu Planowanego Zakładu Termicznego Przekształcania Odpadów Komunalnych Na Jakość Powietrza W Krakowie, Robert Oleniacz, Maria Pilch Oct 2007

Ocena Wpływu Planowanego Zakładu Termicznego Przekształcania Odpadów Komunalnych Na Jakość Powietrza W Krakowie, Robert Oleniacz, Maria Pilch

Robert Oleniacz

The work presents air quality impact assessment for the planned Municipal Solid Waste Incineration (MSWI) plant in Krakow with a established capacity of 255000 tons per year. The evaluation is based on assumption that air pollutant emissions from the incinerator will be at the highest allowed level resulting from emission limit values for waste incineration plants with operation time each of two planned lines 7500 hours per year. Calculation results for the one of the considered localization of the MSWI plant in Krakow (district of Nowa Huta) support the thesis that building the incineration plant of this size will not …