Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 30 of 84

Full-Text Articles in Physical Sciences and Mathematics

Constituent Loads And Trends In The Upper Illinois River Watershed: A Nonpoint Source Management Program Priority Watershed, Erin M. Grantz, Brian E. Haggard Feb 2023

Constituent Loads And Trends In The Upper Illinois River Watershed: A Nonpoint Source Management Program Priority Watershed, Erin M. Grantz, Brian E. Haggard

Technical Reports

The Arkansas Department of Agriculture - Natural Resources Division (ANRD) has identified the Upper Illinois River Watershed (UIRW; 11110103), a hydrologic unit code (HUC) 8 watershed, located in Northwest Arkansas for prioritization by the Nonpoint Source (NPS) Management Program. URIW encompasses the Illinois River from its headwaters to the state line with Oklahoma and has been the subject of interstate disputes over water quality for decades. Nonpoint source pollution concerns in UIRW are excess nutrients from agriculture and sediment from changes in land use/land cover (LULC).

Local, state, and national groups, including the NPS Source Management Program, have invested in …


Constituent Loads And Trends In The Upper White River Basin: A Nonpoint Source Management Program Priority Watersheds, Erin M. Grantz, Brian E. Haggard Feb 2023

Constituent Loads And Trends In The Upper White River Basin: A Nonpoint Source Management Program Priority Watersheds, Erin M. Grantz, Brian E. Haggard

Technical Reports

The Arkansas Department of Agriculture – Natural Resources Division (ANRD) has identified the Upper White River Basin (UWRB; HUC 11010001) a hydrologic unit code (HUC) 8 watersheds, located in Northwest Arkansas, for prioritization by the Nonpoint Source (NPS) Management Program. UWRB includes Beaver Lake in its borders, the drinking water source for 1 in 6 Arkansans. Nonpoint source pollution concerns in these watersheds are excess nutrients from agriculture and sediment from changes in land use/land cover (LULC).

Local, state, and national groups, including the NPS Source Management Program, have invested in education, best management practices, and streambank restoration in the …


Defining Critical Or Hydrologic Conditions As Sampled During The Joint Study, Brian E. Haggard, Erin Grantz, J. T. Scott Jul 2022

Defining Critical Or Hydrologic Conditions As Sampled During The Joint Study, Brian E. Haggard, Erin Grantz, J. T. Scott

Technical Reports

The “Joint Study” was conducted to fulfill the obligations of the second “Statement of Joint Principles and Actions” agreed to by the states of Arkansas and Oklahoma. The “Joint Study” affirmed the magnitude of Oklahoma’s Scenic River total phosphorus (TP) criteria (i.e., 0.037 mg/L), but it added the new caveat of applying the criteria to “critical conditions.” The primary purpose of this paper was to define “critical conditions” based on the range in base flow proportions (BFP) of total streamflow on days that were sampled in the “Joint Study,” where BFP is base flow discharge divided by total stream flow …


Water Quality Monitoring In The Upper Poteau River Watershed, Abbie Lasater, Brian E. Haggard Jan 2021

Water Quality Monitoring In The Upper Poteau River Watershed, Abbie Lasater, Brian E. Haggard

Technical Reports

The Upper Poteau River Watershed (UPRW) has been listed as a priority watershed in Arkansas since 1998 due to nutrient and sediment enrichment from point and nonpoint sources (NPS). According to the Arkansas NPS pollution management plan, the goals for the UPRW are to reduce pollutant levels that will restore all designates uses and target subwatersheds where implementation of management practices can have the greatest impact. Over the last several years, many 319(h) projects have been implemented and point sources have been reduced in order to improve water quality in the UPRW. The purpose of this study was to monitor …


Constituent Loads And Trends In The Upper Illinois River Watershed And Upper White River Basin: 2015 October Through 2018 September, Erin E. Scott, Brian E. Haggard Feb 2019

Constituent Loads And Trends In The Upper Illinois River Watershed And Upper White River Basin: 2015 October Through 2018 September, Erin E. Scott, Brian E. Haggard

Technical Reports

The Arkansas Natural Resources Commission (ANRC) identified two priority hydrologic unit code (HUC) 8 watersheds, the Upper White River Basin (UWRB; HUC 11010001) and the Upper Illinois River Watershed (UIRW; 11110103), in northwest Arkansas. Nonpoint source (NPS) pollution is a concern in these watersheds, such as excess nutrients from agriculture and sediment from changes in land uses. Several NPS pollution projects have been funded by ANRC, including streambank restoration on Sager Creek and best management practices (BMP) to control urban sediment in Fayetteville. The purpose of this project was to collect water samples at 15 sites in the UWRB and …


Watershed Investigative Support To The Poteau Valley Improvement Authority: Stream Water Quality To Support Huc 12 Prioritization In The Lake Wister Watershed, Oklahoma, Bradley J. Austin, Brina A. Smith, Brian E. Haggard Feb 2018

Watershed Investigative Support To The Poteau Valley Improvement Authority: Stream Water Quality To Support Huc 12 Prioritization In The Lake Wister Watershed, Oklahoma, Bradley J. Austin, Brina A. Smith, Brian E. Haggard

Technical Reports

Nonpoint source pollution associated with human land use (agriculture and urbanization) is one of the leading causes of impairment to waterways in the United States (EPA, 2000). The primary pollutants associated with agricultural and urban land use are sediment and nutrients which enter nearby streams during rain events and are then carried downstream. These sediments and nutrients may result in water quality issues in the downstream water bodies like increased algal growth or decreased water clarity (e.g. Smith et al., 1999).


Database Analysis To Support Nutrient Criteria Development (Phase Ii), B. E. Haggard, M.A. Evans-White, L.B. Massey, E.M. Grantz Oct 2016

Database Analysis To Support Nutrient Criteria Development (Phase Ii), B. E. Haggard, M.A. Evans-White, L.B. Massey, E.M. Grantz

Technical Reports

The intent of this publication of the Arkansas Water Resources Center is to provide a location whereby a final report on water research to a funding agency can be archived. The Texas Commission on Environmental Quality (TCEQ) contracted with University of Arkansas researchers for a multiple year project titled “Database Analysis to Support Nutrient Criteria Development”. This publication covers the second of three phases of that project and has maintained the original format of the report as submitted to TCEQ. This report can be cited either as an AWRC publication (see below) or directly as the final report to TCEQ.


Database Analysis To Support Nutrient Criteria Development (Phase I), B. E. Haggard, J.T. Scott, M.A. Evans-White Oct 2016

Database Analysis To Support Nutrient Criteria Development (Phase I), B. E. Haggard, J.T. Scott, M.A. Evans-White

Technical Reports

The intent of this publication of the Arkansas Water Resources Center is to provide a location whereby a final report on water research to a funding agency can be archived. The Texas Commission on Environmental Quality (TCEQ) contracted with University of Arkansas researchers for a multiple year project titled “Database Analysis to Support Nutrient Criteria Development”. This publication covers the first of three phases of that project and has maintained the original format of the report as submitted to TCEQ. This report can be cited either as an AWRC publication (see below) or directly as the final report to TCEQ.


Bella Vista Lakes Project: Fertility Management, J. Thad Scott Jun 2016

Bella Vista Lakes Project: Fertility Management, J. Thad Scott

Technical Reports

No abstract provided.


White River Forum Ii: Second Annual Meeting Of The White River Forum, John Havel, Kenneth Steele Nov 2009

White River Forum Ii: Second Annual Meeting Of The White River Forum, John Havel, Kenneth Steele

Technical Reports

This second annual meeting of the White River Forum is proof of widespread interest in the water quality of the Upper White River watershed. The participation of numerous elected officials, state and federal agencies, universities, businesses, and local citizens indicates that interest in understanding policy issues crosses political boundaries and occupations.


Water Quality Sampling, Analysis And Annual Load Determinations For Nutrients And Solids On The Ballard Creek, 2008, L.B. Massey, L.W. Cash, B.E. Haggard Jul 2009

Water Quality Sampling, Analysis And Annual Load Determinations For Nutrients And Solids On The Ballard Creek, 2008, L.B. Massey, L.W. Cash, B.E. Haggard

Technical Reports

The Arkansas Water Resources Center monitored water quality at Ballard Creek at the Washington County Road 76 Bridge in northwest Arkansas during base flow and storm events from July 1, 2008 through June 30, 2009. Water samples were collected manually or with an auto-sampler and analyzed for nitrate-nitrogen, ammonia-nitrogen, total nitrogen, total phosphorus, soluble reactive phosphorus, sulfate, chloride and total suspended solids. Instantaneous stage and discharge were recorded at the site; total annual discharge was 55,800,000 m³ , with 27% attributed to base flow and 73% attributed to storm flow. Loads were estimated using the mid-interval integration approach using continuous …


Water Quality Sampling, Analysis And Annual Load Determinations For The Illinois River At Arkansas Highway 59 Bridge, 2008, L.B. Massey, L.W. Cash, B.E. Haggard Jul 2009

Water Quality Sampling, Analysis And Annual Load Determinations For The Illinois River At Arkansas Highway 59 Bridge, 2008, L.B. Massey, L.W. Cash, B.E. Haggard

Technical Reports

The Arkansas Water Resources Center monitored water quality at the Illinois River at the Arkansas Highway 59 Bridge, just upstream from the Arkansas-Oklahoma state border during base flow and storm events from July 1, 2008 through June 30, 2009. Water samples were collected manually or with an auto-sampler and analyzed for nitrate-nitrogen, ammonia-nitrogen, total nitrogen, total phosphorus, soluble reactive phosphorus, sulfate, chloride and total suspended solids. The U.S. Geological Survey recorded instantaneous stage and discharge at the site, total annual discharge was 1,010,000,000 m³ , with 37% attributed to base flow and 63% attributed to storm flow. Loads were estimated …


Frequency Distributions Of Median Nutrient And Chlorophyll Concentrations Across The Red River Basin, 1996-2006, S.D. Longing, B.E. Haggard Jul 2009

Frequency Distributions Of Median Nutrient And Chlorophyll Concentrations Across The Red River Basin, 1996-2006, S.D. Longing, B.E. Haggard

Technical Reports

Acquisition and compilation of water quality data for a ten year time period (1996 – 2006) from 589 stream and river stations was conducted to support nutrient criteria development for the multi–state Red River Basin shared by Arkansas, Louisiana, New Mexico, Oklahoma and Texas, USA. Twenty–three water quality parameters were collected from five data sources (USGS, ADEQ, LDEQ, OCC, OWRB, and TCEQ) and an additional 13 parameters were acquired from at least one source. Data for the primary biological parameter of interest, chlorophyll a, was sparse and available from only two sources. Following compilation of data, medians were calculated for …


Illinois River 2005 Pollutant Loads At Arkansas Highway 59 Bridge, Marc Nelson, Wade Cash, Keith Trost, Jennifer Purtle Jun 2006

Illinois River 2005 Pollutant Loads At Arkansas Highway 59 Bridge, Marc Nelson, Wade Cash, Keith Trost, Jennifer Purtle

Technical Reports

Automatic water sampler and a U. S. Geological Survey gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling by the Arkansas Water Resources Center -Water Quality Lab for January 1, 2005 to December 31, 2005.


2005 Nutrient And Sediment Monitoring Report Ballard Creek Near Arkansas/Oklahoma Line, Marc Nelson, L. Wade Cash, Keith Trost, Jennifer Purtle, Marty Matlock Jun 2006

2005 Nutrient And Sediment Monitoring Report Ballard Creek Near Arkansas/Oklahoma Line, Marc Nelson, L. Wade Cash, Keith Trost, Jennifer Purtle, Marty Matlock

Technical Reports

The Illinois River Basin has experienced water quality impairment from non-point source pollution for many years. This fact was well documented in the State of Arkansas' Water Quality Assessment report, the Soil Conservation Service River Basin Study, and several University of Arkansas studies. Thirty-seven sub-watersheds have been identified by the SCS in the Arkansas portion of the Illinois River basin. In the Arkansas portion of the Basin, the Illinois River, Evansville Creek, Baron Fork, Cincinnati Creek, Muddy Fork, Moores Creek, Clear Creek, Osage Creek and Flint Creek were all classified as not supporting their designated use as primary contact recreation …


Water Quality Sampling, Analysis And Annual Load Determinations For Tss, Nitrogen And Phosphorus At The Washington County Road 76 Bridge On Ballard Creek, Marc A. Nelson, L. Wade Cash, G. Keith Trost, Jennifer Purtle Jun 2005

Water Quality Sampling, Analysis And Annual Load Determinations For Tss, Nitrogen And Phosphorus At The Washington County Road 76 Bridge On Ballard Creek, Marc A. Nelson, L. Wade Cash, G. Keith Trost, Jennifer Purtle

Technical Reports

The Illinois River Basin has experienced water quality impairment from non-point source pollution for many years. This fact was well documented in the State of Arkansas' Water Quality Assessment report, the Soil Conservation Service River Basin Study, and several University of Arkansas studies. Thirty-seven sub-watersheds have been identified by the SCS in the Arkansas portion of the Illinois River basin. In the Arkansas portion of the Basin, the Illinois River, Evansville Creek, Baron Fork, Cincinnati Creek, Muddy Fork, Moores Creek, Clear Creek, Osage Creek and Flint Creek were all classified as not supporting their designated use as primary contact recreation …


Water Quality Sampling, Analysis And Annual Load Determinations For Tss, Nitrogen And Phosphorus At The Washington County Road 195 Bridge On The West Fork Of The White River, 2004 Annual Report, Marc A. Nelson, L. Wade Cash, G. Keith Trost, Jennifer Purtle Jun 2005

Water Quality Sampling, Analysis And Annual Load Determinations For Tss, Nitrogen And Phosphorus At The Washington County Road 195 Bridge On The West Fork Of The White River, 2004 Annual Report, Marc A. Nelson, L. Wade Cash, G. Keith Trost, Jennifer Purtle

Technical Reports

A water quality sampling station was installed at the Washington County road 195 bridge on the West Fork of the White River just above the confluence of the three main forks of the Upper White River in December 2001. The Quality Assurance Project Plan (QAPP) was approved by EPA Region six on March 2002 and sampling was begun at that time. This station is coordinated with a USGS gauging station at the same location. This station was instrumented to collect samples at sufficient intervals across the hydrograph to accurately estimate the flux of total suspended solids, nitrogen and phosphorus into …


Illinois River 2004 Pollutant Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, L. Wade Cash, Keith Trost, Jennifer Purtle Jun 2005

Illinois River 2004 Pollutant Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, L. Wade Cash, Keith Trost, Jennifer Purtle

Technical Reports

Automatic water sampler and a U. S. Geological Survey gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling by the Arkansas Water Resources Center -Water Quality Lab for January 1, 2004 to December 31, 2004.


Illinois River 2003 Pollutant Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, L. Wade Cash Sep 2004

Illinois River 2003 Pollutant Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, L. Wade Cash

Technical Reports

Automatic water samplers and a U. S. Geological Survey gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling by the Arkansas Water Resources Center -Water Quality Lab for January 1, 2003 to December 31, 2003.


Water Quality Sampling, Analysis And Annual Load Determinations For Tss, Nitrogen And Phosphorus At The Wyman Bridge On The White River, Marc Nelson, L. Wade Cash Jul 2004

Water Quality Sampling, Analysis And Annual Load Determinations For Tss, Nitrogen And Phosphorus At The Wyman Bridge On The White River, Marc Nelson, L. Wade Cash

Technical Reports

An automatic water sampler was established in 2000 on the main stem of the White River at the Wyman Road Bridge. The Quality Assurance Project Plan (QAPP) was approved by EPA Region six on April 2000 and sampling was begun at that time. This station is coordinated with a USGS gauging station at the same location. This station was instrumented to collect samples at sufficient intervals across the hydrograph to accurately estimate the flux of total suspended solids, nitrogen and phosphorus into the upper end of Beaver Lake from the White River. The Upper White was designated as the states …


Swine Waste Demonstration And Training Project, C. V. Maxwell, K. Vandevender, K. P. Coffey, P. A. Moore, I. Chaubey, D. R. Smith Dec 2003

Swine Waste Demonstration And Training Project, C. V. Maxwell, K. Vandevender, K. P. Coffey, P. A. Moore, I. Chaubey, D. R. Smith

Technical Reports

No abstract provided.


Stormwater Pollution Prevention Bmp Workshop, Demonstration, And Evaluation, Findlay G. Edwards Jun 2003

Stormwater Pollution Prevention Bmp Workshop, Demonstration, And Evaluation, Findlay G. Edwards

Technical Reports

With the recent promulgation of Phase II of the National Pollution Discharge Elimination System (NPDES) Stormwater Pollution Control regulations, many construction companies, consulting engineers, architects, and regulating agency personnel are unaware of the new stormwater pollution reduction requirements. In addition, they are typically unaware of Best Management Practices (BMPs) that are available to mitigate stormwater discharge pollution and the proper methods of installing and maintaining BMPs. The Water Quality Goals and Objectives were to train engineers, contractors, architects, and governmental officials on the new Phase II Storm Water NPDES regulations and Best Management Practices available for construction projects. The Original …


Illinois River 2001 Pollutant Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, Thomas S. Soerens Sep 2002

Illinois River 2001 Pollutant Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, Thomas S. Soerens

Technical Reports

Automatic water samplers and a U. S. Geological Survey gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling for January 1, 2001 to December 31, 2001.


Illinois River 2000 Pollutant Loads At Arkansas 59 Bridge, Marc A. Nelson, Thomas S. Soerens Oct 2001

Illinois River 2000 Pollutant Loads At Arkansas 59 Bridge, Marc A. Nelson, Thomas S. Soerens

Technical Reports

Automatic water samplers and a U. S. Geological Survey gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling for January 1, 2000 to December 31, 2000


Extended Water Quality Monitoring Of The Lincoln Lake Watershed, Paul F. Vendrell, K. F. Steele, M. A. Nelson, L. W. Cash, R. W. Ncnew Dec 2000

Extended Water Quality Monitoring Of The Lincoln Lake Watershed, Paul F. Vendrell, K. F. Steele, M. A. Nelson, L. W. Cash, R. W. Ncnew

Technical Reports

For seven years, the Lincoln Lake (Moores Creek and Beatty Branch) watershed was monitored for improvements in water quality resulting from agricultural best management practices (BMP) implemented to reduce nutrient transport. During the first three years of monitoring (1991 to 1994), nitrogen transport declined significantly (Edwards et al., 1994, 1996, and 1997) under both base and storm flow conditions. This decline in nitrogen transport was again observed in the three-year period following 1994 (Vendrell et al. 1998). This monitoring effort has demonstrated that water quality bas improved in the Lincoln Lake watershed. However, since the nitrogen transport continued to decline …


Illinois River 1999 Pollutant Loads At Arkansas Higway 59 Bridge, Marc A. Nelson, Thomas S. Soerens Sep 2000

Illinois River 1999 Pollutant Loads At Arkansas Higway 59 Bridge, Marc A. Nelson, Thomas S. Soerens

Technical Reports

Automatic water samplers and aU. S. Geological Survey gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling for January 1, 1999 to December 31, 1999.


Spatial And Temporal Changes In Land Use And Land Cover From 1988 To 1992 In The Upper White River Watershed, H. D. Scott, J. M. Mckimmey Sep 2000

Spatial And Temporal Changes In Land Use And Land Cover From 1988 To 1992 In The Upper White River Watershed, H. D. Scott, J. M. Mckimmey

Technical Reports

Changes in Land Use and Land Cover (LULC) in the upper White River Watershed from 1988 to 1992 were analyzed and plotted using the geographic information system known as Geographic Resources Analyses Support System (GRASS). This portion of the White River Watershed includes two sub-basins the East Fork and the Middle Fork. In addition, LULC changes were determined for two smaller sub-basins, Shumate Creek and Cannon Creek, located in the East Fork of the White River. The sources and methods of interpretation of the 1988 and 1992 of data were different. Thus, there were variations in how certain portions of …


Storm And Base Flow Water Quality For Bear, Calf, And Tomahawk Creeks, Kenneth F. Steele, David N. Mott Oct 1998

Storm And Base Flow Water Quality For Bear, Calf, And Tomahawk Creeks, Kenneth F. Steele, David N. Mott

Technical Reports

Because of the conversion of 92,780 acres of forest to pasture land in the Buffalo River watershed over a 27 year period, there is concern about the affect of agricultural activities on the water quality of the river. Three tributaries (Bear, Calf and Tomahawk creeks) located about mid-length of the Buffalo River were chosen to investigate the affect of agricultural activity on water quality because these streams provide the greatest amounts of fecal bacteria, nitrate+nitrite and phosphorus to the river, despite comprising only 13% of the watershed.


Llinois River 1997 Pollutant Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, Thomas S. Soerens Sep 1998

Llinois River 1997 Pollutant Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, Thomas S. Soerens

Technical Reports

Automatic water samplers and a USGS gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling for January 1, 1997 to December 31, 1997.


Investigation Of The Statistical And Spatial Distributions Of Mercury Contaminated Fish, Surface Waters And Soils In Arkansas, H. D. Scott, J. M. Mckimmey Jan 1997

Investigation Of The Statistical And Spatial Distributions Of Mercury Contaminated Fish, Surface Waters And Soils In Arkansas, H. D. Scott, J. M. Mckimmey

Technical Reports

Mercury (Hg) contamination of fish is a widespread problem throughout much of the United States and the world (Louisiana WWW page, 1997). Levels ofHg in fish suffic1ent to exceed the FDA action level of 1 mg kg-1 have been found in many water bodies, including some in Arkansas and Louisiana. As a result of the serious public health ramifications for developing fetuses and for people that subsist on native fish, fish consumption advisories due to Hg contamination have been issued in 29 states. Contamination of surface water bodies by Hg results from deforestation, forest fires, fossil fuels, mining, natural emissions …