Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 5 of 5

Full-Text Articles in Physical Sciences and Mathematics

2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc. Dec 2022

2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Carbon Cycling And Critical Zone Dynamics In An Urbanized Karst Groundwater System, Amy Hourigan Dec 2022

Carbon Cycling And Critical Zone Dynamics In An Urbanized Karst Groundwater System, Amy Hourigan

Masters Theses & Specialist Projects

Increasing atmospheric CO2 concentrations are correlated to rising global temperatures. Investigating the cumulative global carbon cycling processes is important to understand and quantify the global carbon cycle. By investigating basic geochemical parameters, EpCO2, DIC, and δ13CDIC, at four sites along Lost River Cave (LRC), in Bowling Green, Kentucky, concentrations, fluxes and sources of C dissolved in groundwater were determined. Urban karst groundwater systems, compared to more natural karst landscapes, typically exhibit widespread impervious, heat-absorbing surfaces, urban heat island effects, and increased anthropogenic groundwater inputs and localized CO2 emissions. Carbonate hydrogeochemical …


Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2022

Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2022

2022 Final Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. May 2022

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.