Articles 1 - 5 of 5

Full-Text Articles in Physical Sciences and Mathematics

Physical Data, Anon. Jun 1987

Physical Data, Anon.

Publications (WR)

Data collected at various stations around the Lake Mead vicinity. Air temperature, lake elevation, weather, and wind velocity is recorded, as well as the depth, temperature, oxygen, conductivity, and pH. Standard.


Evaluation Of Impacts Associated With Reregulation Of Water Levels In Lake Mohave, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service Mar 1980

Evaluation Of Impacts Associated With Reregulation Of Water Levels In Lake Mohave, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service

Publications (WR)

The U.S. Water and Power Resources Service is considering reregulating Lake Mohave water levels to increase the net power benefit from Hoover Dam. Reregulation will not increase the generation capacity of the Hoover powerplant but it will enable the plant operation to be increased when the energy has greater monetary value. Energy generated at different times of the year has different market value, the highest being in January-March and July- September. By generating more power during these periods more net monetary benefit can be derived from Hoover Dam. The total volume of water released from Hoover Dam over an annual …


Evaluation Of Possible Temperature Fluctuations From Proposed Power Modifications At Hoover Dam, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service Mar 1980

Evaluation Of Possible Temperature Fluctuations From Proposed Power Modifications At Hoover Dam, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service

Publications (WR)

There are several planned alternatives for increasing the generation capacity of Hoover Dam to help meet peak power demands. These alternatives include: (a) uprating the existing generating units, (b) replacing or adding one or more generating units and (c) adding reversible pumped-storage hydroelectric units. Since the existing generators are at the end of their economic life and have to be replaced, their uprating has been scheduled as routine maintenance. This will increase the generating capacity of the Hoover Dam powerplant from 1240 MW to 1810 MW, but the anticipated capacity for meeting power demand is 2300 MW. Therefore, modifications (alternatives …


Influence Of Dredging And High Discharge On The Ecology Of Black Canyon, Larry J. Paulson, Theron G. Miller, John R. Baker, U.S. Water And Power Resources Service Jan 1980

Influence Of Dredging And High Discharge On The Ecology Of Black Canyon, Larry J. Paulson, Theron G. Miller, John R. Baker, U.S. Water And Power Resources Service

Publications (WR)

The Water and Power Resources Service is considering dredging in Black Canyon to create a larger forebay to accommodate higher peak discharges and reverse flows for proposed modifications to Hoover Dam.

The Black Canyon area from Hoover Dam to Willow Beach supports a heavily utilized trout fishery and is important habitat for the razorback sucker (Xyrauchen texanus) and possibly bonytail chub (Gila elegans).

The Water and Power Resources Service initiated this investigation to determine what effect dredging and higher peak-discharges would have on the ecology of Black Canyon.


The Limnological Status Of Lake Mead And Lake Mohave Under Present And Future Powerplant Operations Of Hoover Dam, Larry J. Paulson, John R. Baker, James E. Deacon, U.S. Water And Power Resources Service Jan 1980

The Limnological Status Of Lake Mead And Lake Mohave Under Present And Future Powerplant Operations Of Hoover Dam, Larry J. Paulson, John R. Baker, James E. Deacon, U.S. Water And Power Resources Service

Publications (WR)

The ever-increasing demand for energy in the southwest has led to a search for additional sources of power generation. Coal-fired powerplants currently provide most of the baseline energy in the southwest, but this must be supplemented with hydroelectric power during periods of peak demand. In order to provide additional peaking power, the U.S. Bureau of Reclamation is considering a number of projects to modify existing hydroelectric facilities, or add new facilities in the Lake Mead Recreation Area.

The Hoover Powerplant Modification Feasibility Investigation was authorized by Congress on December 16, 1975 to determine the feasibility of: (i) adding one or …