Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Soil Science

PDF

University of Arkansas, Fayetteville

Hydrology

Articles 1 - 2 of 2

Full-Text Articles in Physical Sciences and Mathematics

Characterization Of Problematic Red Clay Soils In Arkansas For The Purpose Of Onsite Wastewater System Placement, Bailey Darnell May 2021

Characterization Of Problematic Red Clay Soils In Arkansas For The Purpose Of Onsite Wastewater System Placement, Bailey Darnell

Graduate Theses and Dissertations

Distinguishing between red-clay soils that are non-expansive and can reduce and red-clay soils developing in problematic red parent material, which are expansive, but also non-reducing, is key for proper on-site wastewater system placement. The Arkansas Department of Health allows for the placement of on-site wastewater systems in certain red-clay soils that have the potential to reduce, but only in the Ozark Highlands [Major Land Resource Area (MLRA) 116A], which is referred to as the red-soil exception. There is currently little scientific data to support the geographic restriction of the red-soil exception. The objectives of this study were to: i) confirm …


Investigation Of Optimum Sample Number And Timing For Determining Pollution Loads, T. S. Soerens, Marc A. Nelson Oct 2000

Investigation Of Optimum Sample Number And Timing For Determining Pollution Loads, T. S. Soerens, Marc A. Nelson

Technical Reports

In order to determine the impacts of non point source (NPS) pollution and to develop Total Maximum Daily Loads (Tr\tfDLs), accurate measurements of pollution loads in streams are critical. The objectives of this study were to accurately detemline pollutant loads at two sites by intensive storm sampling, to develop sub-sampling and other data analysis techniques, to detemline the effect of sample interval on load calculation accuracy, and to find the minimum sample interval required to determine storm loads at a required accuracy. The two stream sites used were a 1st order and a 3rd order stream in the Illinois River …