Articles 1 - 3 of 3

Full-Text Articles in Physical Sciences and Mathematics

Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc Jan 1977

Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc

Dickey-Lincoln School Lakes Project

The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. This study develops and evaluates a concept plan for the recreation potential of the Dickey-Lincoln School project and assesses the recreational impact of this recommended concept plan.


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …