Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Marine Biology

PDF

William & Mary

Physical Sciences Reports

Publication Year

Articles 1 - 2 of 2

Full-Text Articles in Physical Sciences and Mathematics

Vertical One-Dimensional (1-D) Simulations Of Horizontal Velocity Profiles, Jerome P.Y. Maa, Jian Shen, Xiaoteng Shen, Shao Yuyang Jan 2016

Vertical One-Dimensional (1-D) Simulations Of Horizontal Velocity Profiles, Jerome P.Y. Maa, Jian Shen, Xiaoteng Shen, Shao Yuyang

Reports

Details of a vertical 1-D hydrodynamic model to simulate the horizontal velocity profiles for tidal estuarial flows with possible stratifications caused by salinity or Suspended Sediment Concentration (SSC) are presented. The standard 2nd order k-ε model was implemented to address the turbulent flow with possible stratification effects. Simulation results are verified with two field measurements for steady nonstratified flows and a field measurement for tidal estuary non-stratified flow. The stratification effect of salinity and suspended sediment concentration are also checked with the following descriptions: “Salinity stratification will change the typical logarithmic velocity profile to a linear profile for most of …


Cross-Shoreface Suspended Sediment Transport : A Response To The Interaction Of Nearshore And Shelf Processes, Fall 1994 Duck, Nc Field Experiment, D. A. Hepworth, Carl T. Friedrichs, John Brubaker Oct 1988

Cross-Shoreface Suspended Sediment Transport : A Response To The Interaction Of Nearshore And Shelf Processes, Fall 1994 Duck, Nc Field Experiment, D. A. Hepworth, Carl T. Friedrichs, John Brubaker

Reports

Deployment : The tripods were assembled, tested and secured onboard the RIV Sea Diver, which left the Little Creek Amphibious Base in Norfolk, Virginia early on 26 September. While underway to the deployment site, the continuous surface water conductivity and temperature survey was run and several CTD casts were made. The tripods were deployed on 26 September and secured to the sea floor with sand anchors by VIMS divers. The R/V Sea Diver then began the series of on/off shore transects at the tripod deployment site for approximately 12 hours. The vessel returned to port on 27 September .

Recovery: …