Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Physical Sciences and Mathematics

Illinois River 1998 Nutrient And Suspended Sediment Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, Thomas S. Soerens Sep 1999

Illinois River 1998 Nutrient And Suspended Sediment Loads At Arkansas Highway 59 Bridge, Marc A. Nelson, Thomas S. Soerens

Technical Reports

Automatic water samplers and a U.S. Geological Survey (USGS) gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling for January 1, 1998 to December 31, 1998.


Tmdl Implementation Under The Clean Water Act, Bruce Zander Jun 1999

Tmdl Implementation Under The Clean Water Act, Bruce Zander

Strategies in Western Water Law and Policy: Courts, Coercion and Collaboration (Summer Conference, June 8-11)

17 pages (includes illustrations and maps).

Contains references.