Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Environmental Sciences

All U.S. Government Documents (Utah Regional Depository)

Series

1993

Utah

Articles 1 - 4 of 4

Full-Text Articles in Physical Sciences and Mathematics

Record Of Decision Utah Power & Light/American Barrel Site Salt Lake City, Utah, United States Environmental Protection Agency Jul 1993

Record Of Decision Utah Power & Light/American Barrel Site Salt Lake City, Utah, United States Environmental Protection Agency

All U.S. Government Documents (Utah Regional Depository)

This decision document presents the selected remedial action for the Utah Power & Light American Barrel Site in Salt Lake City, Utah, which was chosen in accordance with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by Superfund Amendments and Reauthorization Act of 1986 (SARA), and, to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This decision is based on the administrative record for this site. The Utah Department of Environmental Quality concurs with the remedy selected by the U.S. Environmental Protection Agency (EPA).


Preliminary Public Health Assessment: Petrochem Recycling Corporation/Ekotek Salt Lake City, Salt Lake County, Utah, Agency For Toxic Substances And Disease Registry, Divisoin Of Health Assessment And Consultation Apr 1993

Preliminary Public Health Assessment: Petrochem Recycling Corporation/Ekotek Salt Lake City, Salt Lake County, Utah, Agency For Toxic Substances And Disease Registry, Divisoin Of Health Assessment And Consultation

All U.S. Government Documents (Utah Regional Depository)

The Petrochem/EkoTek site was operated by several owners as a refinery from 1953 until 1978 and as a hazardous waste storage treatment facility and a petroleum recycling facility from 1978 through 1988. Removal of essentially all petroleum products and hazardous wastes in tanks and drums was accomplished from 1988 - 1991. The process that will lead to the complete clean-up of the facility is ongoing. The site was added to the National Priorities List (NPL) in October 1992. Exposure of humans to contaminants in soil and air is thought to have occurred near Petrochem. The source(s) of those contaminants in …


Zion Canyon Headquarters, Zion National Park, Utah, Draft Development Concept Plan, Environmental Assessment, United States Department Of The Interior, National Park Service Jan 1993

Zion Canyon Headquarters, Zion National Park, Utah, Draft Development Concept Plan, Environmental Assessment, United States Department Of The Interior, National Park Service

All U.S. Government Documents (Utah Regional Depository)

The study area, referred to as the headquarters area, incorporates the area from the south entrance station north to the Zion Canyon bridge. This includes the visitor center, the Watchman and South campgrounds, the amphitheaters, the nature center, the Oak Creek, Watchman, and Pine Creek residential areas, and the Oak Creek maintenance area. The study area encompasses approximately 325 acres. It includes a development zone (107 acres) and a natural zone (218 acres), and is surrounded by a proposed wilderness subzone.


Price - San Rafael Rivers Unit, Utah, Planning Report / Final Environmental Impact Statement, Colorado River Water Quality Improvement Program / Colorado River Salinity Control Program, United States Department Of The Interior, Bureau Of Reclamation And United States Department Of Agriculture, Soil Conservation Service Jan 1993

Price - San Rafael Rivers Unit, Utah, Planning Report / Final Environmental Impact Statement, Colorado River Water Quality Improvement Program / Colorado River Salinity Control Program, United States Department Of The Interior, Bureau Of Reclamation And United States Department Of Agriculture, Soil Conservation Service

All U.S. Government Documents (Utah Regional Depository)

This integrated Planning Report/Final Environmental Impact Statement (PR/FEIS) presents an analysis of the planning process and the environmental impacts of the proposed Price-San Rafael Rivers Unit (Unit) of the Colorado River Water Quality Improvement Program (CRWQIP) and the Colorado River Salinity Control Program (CRSC). The document has been jointly prepared by the Bureau of Reclamation (Reclamation) and the Soil Conservation Service (SCS) to address the full range of potential environmental impacts, in compliance with the National Environmental Policy Act (NEPA). The CRWQIP/CRSC programs provide for projects upstream of Imperial Dam (near Yuma, Arizona, on the Arizona-California border) that are necessary …