Open Access. Powered by Scholars. Published by Universities.®
Physical Sciences and Mathematics Commons™
Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 8 of 8
Full-Text Articles in Physical Sciences and Mathematics
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project
The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.
Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy
Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Source data for base map taken from US Geological Survey Topographic Maps. 1:250.000 scale series. Horizontal and vertical control depicted herein is relative to the U S.G S source maps.
Geotechnical Impact Study. Map Volume, United States Department Of Energy
Geotechnical Impact Study. Map Volume, United States Department Of Energy
Dickey-Lincoln School Lakes Project
Surficial Deposits Legend Maps of Dickey/Lincoln School lakes Transmission - E.I.S.Project, Environmental Assessment of Alternative Routs, Geotechnical Study, United States Department of the Interior.
Ecological Resources Impact Study. Map Volume, United States. Department Of Energy
Ecological Resources Impact Study. Map Volume, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Environmental Assessment of Alternative Routes, Ecological Resources Impact Study, Maps and Legend land cover types
Land Use Impact Study. Map Volume, United States. Department Of Energy
Land Use Impact Study. Map Volume, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Environmental Assessment of Alternative Routes, Land Use Study, Maps, Existing land use
Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy
Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Environmental Assessment of Alternative Routes, Visual/Recreational Resources Impact Studies, Maps of Recreational Resources
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy
Dickey-Lincoln School Lakes Project
The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project
Dickey-Lincoln School Lakes Project
The responsibility for marketing federally generated power (under provisions of the Flood Control Act of 1944) was transferred from the Department of the Interior to the newly formed Department of Energy. The power transmission portions of the Dickey- Lincoln School Lakes Project were included in that transfer. The U.S. Department of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route and an environmental impact statement, as required by the National …