Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Physical Sciences and Mathematics

The Effects Of Constructed Wetlands On Metal Solubilization And Bioavailability In Passive Mine Remediation, Elizabeth Cochran May 2019

The Effects Of Constructed Wetlands On Metal Solubilization And Bioavailability In Passive Mine Remediation, Elizabeth Cochran

Electronic Theses and Dissertations

The legacy of coal mining in Appalachia has left many watersheds impacted by abandoned mine drainage. The drainage degrades streams, groundwater and habitats with acidity and toxic heavy metals. The Lowber Passive Remediation System has been in operation since 2004 to remediate high amounts of dissolved Fe, SO4, Al, and Mn. The site consists of six settling ponds and an extensive wetlands at the finish. This study investigated the resolubilization of Fe and Mn in the wetlands and the role of bacteria in resolubilization. During three seasons, field measurements of water quality and lab analysis of Fe, Mn, …


Water Quality Assessment Of Deer Lakes County Park Before, During And After Unconventional Shale Gas Drilling, Daniel Robinson May 2019

Water Quality Assessment Of Deer Lakes County Park Before, During And After Unconventional Shale Gas Drilling, Daniel Robinson

Electronic Theses and Dissertations

Allegheny County, Pennsylvania, signed a lease to allow unconventional natural gas extraction from Marcellus Shale beneath Deer Lakes County Park in 2014. The park has three man-made lakes and four waterways that eventually flow into the Allegheny River. Drilling commenced in early 2016, and there are now five producing wells. The park has an extensive abandoned coal mine network and several abandoned oil and gas wells. Thus, an independent water quality study was undertaken beginning in July 2015. Samples from seven different sites in the park were used to establish a water quality baseline prior to the drilling. Monthly sampling …