Open Access. Powered by Scholars. Published by Universities.®
Physical Sciences and Mathematics Commons™
Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 2 of 2
Full-Text Articles in Physical Sciences and Mathematics
Narrogin Townsite Test Pumping Results 2003, Louise Hopgood
Narrogin Townsite Test Pumping Results 2003, Louise Hopgood
Resource management technical reports
Test pumping of a production bore in Narrogin took place for 24 hours in August 2003. Data generated by the test pumping was analysed along with groundwater monitoring, climate and geological data. Laboratory analyses of water samples from the production bore indicate very high levels of salinity and hardness which may lead to severe scaling and corrosion of pumps, pipes and pipe fittings.
Kellerberrin Townsite Test Pumping Results 2003, Louise Hopgood
Kellerberrin Townsite Test Pumping Results 2003, Louise Hopgood
Resource management technical reports
A production bore in Kellerberrin, Western Australia, was test pumped for 24 hours in August 2003. Data generated by the pumping were analysed with groundwater monitoring, climate and geological data. Laboratory analyses of water samples from the production bore indicate a low pH and very high levels of salinity, hardness, sodium, chloride, iron, sulphate, aluminium and manganese. This is likely to lead to scaling, blockages, staining and/or corrosion of pumps, pipes and pipe fittings.