Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

Construction of the proposed Dickey-Lincoln School Lakes Project in Aroostook County, Maine will result in the isolation of an area of land due to the impoundment behind Dickey Dam. This land area is located between the United States - Canadian border, the Little Black River, the impoundment (elevation = 913 feet), the Big Black River, and the Shields Branch of the Big Black River, and comprises 183,768 acres of land. A previous report (ERT, 1977) determined the forest types within two miles of the impoundment but did not extend to the Canadian border. This report addresses the forest types


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc. Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc.

Dickey-Lincoln School Lakes Project

The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west. Major tributaries of the St. John affected by …


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.