Open Access. Powered by Scholars. Published by Universities.®

Life Sciences Commons

Open Access. Powered by Scholars. Published by Universities.®

Series

Hydrology

Hydrology

Department of Primary Industries and Regional Development, Western Australia

Articles 1 - 17 of 17

Full-Text Articles in Life Sciences

The Initial Hydrological Effect Of Deep Drains At Wallatin Creek : (2006-2008), Richard J. George Dr, Grant Stainer Jan 2009

The Initial Hydrological Effect Of Deep Drains At Wallatin Creek : (2006-2008), Richard J. George Dr, Grant Stainer

Resource management technical reports

No abstract provided.


Wilson Inlet Catchment Appraisal 2007, Ron Master Jan 2009

Wilson Inlet Catchment Appraisal 2007, Ron Master

Resource management technical reports

No abstract provided.


Oyster Harbour Catchment Appraisal 2007, Ron Master, South Coast Agricultural Rca Team Mar 2008

Oyster Harbour Catchment Appraisal 2007, Ron Master, South Coast Agricultural Rca Team

Resource management technical reports

No abstract provided.


Boyup Brook - Upper Warren Area : Catchment Appraisal 2007/ Prepared By The South West Arm Region Appraisal Team., Henry Brockman Jan 2007

Boyup Brook - Upper Warren Area : Catchment Appraisal 2007/ Prepared By The South West Arm Region Appraisal Team., Henry Brockman

Resource management technical reports

The aim of this Resource Management Technical Report is to assess the current extent of salinity and other natural resource degradation issues in the Boyup Brook - Upper Warren area and provide landholders with the best current management options to address natural resource management issues and enhance sustainable agricultural production.


Ravensthorpe Area Catchment Appraisal 2006, A Massenbauer Jan 2006

Ravensthorpe Area Catchment Appraisal 2006, A Massenbauer

Resource management technical reports

The Ravensthorpe area covers 861, 000 hectares. Ninety percent of the study area covered in this report falls within the Ravensthorpe Shire, Western Australia. This document aims to give the reader a starting point from which to further assess larger scale areas of the catchment for the purpose of planning to reverse and improve land degradation and sustainable farming in Western Australia.


Groundwater Study Of The Mukinbudin Townsite, F Lewis Dec 2001

Groundwater Study Of The Mukinbudin Townsite, F Lewis

Resource management technical reports

A groundwater study was carried out in the townsite of Mukinbudin, Western Australia. The town does not currently have a salinity problem, but the future risk is not known. It aimed to accelerate the implementation of effective salinity management options. The study consisted of a drilling investigation, installation of a piezometer network, groundwater flow modelling and a flood risk analysis.


Groundwater Study Of The Mullewa Townsite, Russell John Speed Dec 2001

Groundwater Study Of The Mullewa Townsite, Russell John Speed

Resource management technical reports

A groundwater study was carried out in the townsite of Mullewa, Western Australia. It aimed to accelerate the implementation of effective salinity management options. The study consisted of a drilling investigation, installation of a piezometer network, groundwater flow modelling and a flood risk analysis.


Groundwater Study Of The Perenjori Townsite, Russell John Speed Nov 2001

Groundwater Study Of The Perenjori Townsite, Russell John Speed

Resource management technical reports

A groundwater study of the townsite of Perenjori. It aimed to accelerate the implementation of effective salinity management options. The study consisted of drilling investation and installation of a piezometer network, a pumping test, groundwater flow modelling and a flood risk analysis.


Groundwater Study Of The Kellerberrin Townsite, T Cattlin Oct 2001

Groundwater Study Of The Kellerberrin Townsite, T Cattlin

Resource management technical reports

A groundwater study of the townsite of Kellerberrin. It aimed to accelerate the implementation of effective salinity management options. The study consisted of drilling investation and installation of a piezometer network, a pumping test, groundwater flow modelling and a flood risk analysis.


Groundwater Study Of The Narembeen Townsite, Rosemary Knot Aug 2001

Groundwater Study Of The Narembeen Townsite, Rosemary Knot

Resource management technical reports

A groundwater study was carried out for the townsite of Narembeen with the aim of accelerating the implementation of effective salinity management options.


Groundwater Study Of The Pingelly Townsite, Edward K. Crossley May 2001

Groundwater Study Of The Pingelly Townsite, Edward K. Crossley

Resource management technical reports

A groundwater study was carried out in the townsite of Pingelly, Western Australia. It aimed to accelerate the implementation of effective salinity management options. The study consisted of a drilling investigation, expansion of a piezometer network, groundwater flow modelling and a flood risk analysis.


Groundwater Study Of The Piawaning Townsite, Russell John Speed, Ali S. Mahtab May 2001

Groundwater Study Of The Piawaning Townsite, Russell John Speed, Ali S. Mahtab

Resource management technical reports

A groundwater study was carried out in and around the townsite of Piawaning. It aimed to accelerate the implementation of effective salinity management options. The study consisted of a drilling investigation, expansion of a piezometer network, a pumping test and a flood risk analysis.


Groundwater Study Of The Pingrup Townsite, D Pollock, Department Of Agriculture, Western Australia, Louise Hopgood, F Lewis, Ali S. Mahtab, Anthony D. Barr, Muhammad J. Siddiqi, Ron Colman Jan 2001

Groundwater Study Of The Pingrup Townsite, D Pollock, Department Of Agriculture, Western Australia, Louise Hopgood, F Lewis, Ali S. Mahtab, Anthony D. Barr, Muhammad J. Siddiqi, Ron Colman

Resource management technical reports

A groundwater study was carried out in the townsite of Pingrup. It aimed to accelerate the implementation of effective salinity risk management. The study consisted of a drilling investigation and expansion of a piezometer network, a pumping test, groundwater flow modelling and a flood risk analysis.


Groundwater Study Of The Bencubbin Townsite, Cahit Yesertener, P Lacey, Shawan Dogramaci, F Lewis, Department Of Agriculture, Western Australia. Rural Towns Program, Ali S. Mahtab, S Sharafi Jan 2001

Groundwater Study Of The Bencubbin Townsite, Cahit Yesertener, P Lacey, Shawan Dogramaci, F Lewis, Department Of Agriculture, Western Australia. Rural Towns Program, Ali S. Mahtab, S Sharafi

Resource management technical reports

A groundwater study of the townsite of Bencubbin. It aimed to accelerate the implementation of effective salinity management options. The study consisted of drilling investation and installation of a piezometer network, groundwater flow modelling and a flood risk analysis.


The Physical And Hydrological Characteristics Of A South Coast Sandplain Site : East Howick Site Survey, Robert Anthony Sudmeyer Jan 1998

The Physical And Hydrological Characteristics Of A South Coast Sandplain Site : East Howick Site Survey, Robert Anthony Sudmeyer

Resource management technical reports

This Technical Report documents the physical and hydrological characteristics of a farmland site on the Esperance Sandplain. The site was located on 'Belalie Farm East' 110 km east of the town of Esperance in the locality of Howick (AMG 488900, 6277500) The site was typical of the sandplain landsystem which covers 35% (0.72 million ha) of the Esperance Agricultural Region. The farm was cleared over a number of years beginning in the 1970's and an extensive network of windbreaks established.


The Mobrup Catchment Working Plan - A Resource Inventory And Strategies, Steven Garrad Jun 1993

The Mobrup Catchment Working Plan - A Resource Inventory And Strategies, Steven Garrad

Soil conservation survey collection

The Mobrup LCDC has persevered for three years with its efforts to produce a catchment plan. They readily acknowledge that their work is just beginning as they now wrestle with this working plan to form something which will have application on each individual's enterprise to ensure a sustainable future for this catchment.This report is a collation of their ideas, an inventory of works done in the catchment and the best advice which research and local knowledge can provide.


Winchester Sub-Catchment Management Plan, Vivian T. Read Aug 1989

Winchester Sub-Catchment Management Plan, Vivian T. Read

Soil conservation survey collection

The 590 Ha Winchester sub-catchment has no apparent external drainage. Groundwater levels are rising causing site specific problems. Wind erosion has severely affected some areas.The objective of this report is to provide a sub-catchment management plan that is based on sustainable agricultural systems and a hydrological equilibrium. The recommendations aim to meet this objective in the long term. Recommendations to achieve short term results are considered separately. These measures have relatively high installation and maintenance costs. They should be considered as interim management methods until the recommendations for long-term control become effective (perhaps 3 - 5 years after implementation).