Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 29 of 29

Full-Text Articles in Other Operations Research, Systems Engineering and Industrial Engineering

An Improved Ant Colony System For A Real Time Routing Strategy, Hannaneh Rashidi-Bajgan, Taravatsadat Nehzati, Napsiah Ismail Dec 2010

An Improved Ant Colony System For A Real Time Routing Strategy, Hannaneh Rashidi-Bajgan, Taravatsadat Nehzati, Napsiah Ismail

Hannaneh Rashidi-Bajgan

There is a large number of literatures about routing and dispatching plans for automated guided vehicle system (AGVS), however a small fraction of these works dealt with dynamic characteristic of this kind of scheduling problems. Current paper surveys a real time strategy to responding requests for supposed material handling system in the plant. We arranged this designing on a preplanned system where all data are known before the constructing routes. An improved ant colony optimization (ACO) is applied in order to find the shortest route path as new solicitations happened. We explore ACO initially for static version of the problem, …


Pull Production System Training Guide, Adem Bilgutay Dec 2010

Pull Production System Training Guide, Adem Bilgutay

Industrial and Manufacturing Engineering

This book is a series of lessons designed to train operators and managers in pull manufacturing. It begins with a description of the different forms of waste that a system can help to identify and eliminate. The second section details the kanban as a system for controlling flow and as a powerful tool for identifying problems. It will describe the many different variations of kanban that exist to control flow in different production environments and the calculations that allow them to be used effectively. The final section will detail the activities that an operator should engage in when there is …


Expansion In Existing And Future Franchises, Shane Hart, Daniel Jeng Dec 2010

Expansion In Existing And Future Franchises, Shane Hart, Daniel Jeng

Industrial and Manufacturing Engineering

Zensho Group has recently acquired the restaurant US based chains CoCo’s and Carrows but has not been able to affirm the same growth as the company has established in its home country of Japan. In order to fulfill their need to grow, extensive market analysis and research needs to be done. An expansion eastward and the introduction of their flagship restaurant chain, Sukiya, would offer growth potential. Determining the best locations for these new stores is the goal of this project. Low cost and high market penetration potential will be used to recommend the ideal locations that will benefit the …


Cable Time Estimation Database, Joshua L. Okerman Jun 2010

Cable Time Estimation Database, Joshua L. Okerman

Industrial and Manufacturing Engineering

The use of time standards are the basis for a high efficiency system in the manufacturing environment. This project will investigate the process followed to design and develop a database used to calculate accurate cable assembly time standards used for scheduling at General Atomics. This project will then justify the use of the Cable Time Estimation Database, through an economic analysis compared to the current methods applied.


Increasing Production Capacity At A Start Up Biomedical Company, Traci J. Otsuji Jun 2010

Increasing Production Capacity At A Start Up Biomedical Company, Traci J. Otsuji

Industrial and Manufacturing Engineering

The following senior project was first introduced during a summer internship at a biomedical company called Asthmatx Inc. Asthmatx is responsible for the development and manufacturing of a catheter‐based device for moderate to severe cases of asthma. Upon the approval of FDA, Asthmatx had planned to ramp up their production capacity significantly in order to accommodate the potential growth.

The first step in the process improvement was a facility reconfiguration that involved the adjustment of process sequencing and the implementation of ergonomic catheter channels. Next, time studies were conducted to gain more accurate time standards of the production process. After …


Lean Inventory Management System For Boeing Missile Defense, Danielle Partridge Jun 2010

Lean Inventory Management System For Boeing Missile Defense, Danielle Partridge

Industrial and Manufacturing Engineering

Lean inventory management is influential for business. One of the wastes businesses aim to reduce, using lean principles, is inventory. Inventory management provides the essential tools for eliminating extra inventory and cost that is tied up in capital.

Boeing’s Ground Based Missile Defense inventory area was failing at meeting their proprietary lean manufacturing goals. There was a need for an inventory system that included: lean principles, inventory management and user-friendly capability. The goal of this project’s inventory management database process was to minimize inventory investment while still meeting functional requirements. The deliverables for this project met the needs of Boeing’s …


Preference Driven University Course Scheduling System, Heather A. Bellardo Jun 2010

Preference Driven University Course Scheduling System, Heather A. Bellardo

Master's Theses

University course planning and scheduling is the process of determining what courses to offer, how many sections are needed, determining the best term to offer each section, assigning a faculty member to instruct each section, and scheduling each section to a timeslot to avoid conflicts. The result of this task has an impact on every student and faculty member in the department. The process is typically broken down into three major phases: course offering planning, faculty assignment to planned course sections, and course scheduling into timeslots.

This thesis looks at each of these phases for the Industrial and Manufacturing department …


Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu Jun 2010

Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu

Industrial and Manufacturing Engineering

Alcon’s Laser Clean Room fosters inefficient production practices, is outdated for its current process, and lacking in clear process/product flow. A facility re-design is applied to bring order, efficiency, and optimize flow in the laser production lines.

Deliverables include a new layout that decreases product travel distances and increases productivity as well as an implementation plan and cost/savings analysis. Major design decisions include downsizing the clean room, sorting to find waste and establishing clear process/product flows. The design was implemented within three weeks and results yield 29% reduction of product travel distance, 10.4 hrs/day saved from eliminated gowning time and …


Process Improvement For The Department Of Surgery Sierra Vista Medical Center, Jessica Paz Jun 2010

Process Improvement For The Department Of Surgery Sierra Vista Medical Center, Jessica Paz

Industrial and Manufacturing Engineering

This report proposes and analyzes process improvement methods for the Surgical Services Department at Sierra Vista Regional Medical Center. The department currently operates with an average of 25% of elective cases starting on time. This can be attributed to a number of inefficiencies that occur throughout the hospital.

The following Industrial Engineering methods were utilized to improve patient flow:  creation of a data collection system to quantify delays  use of simulation and facility redesign techniques to determine feasibility and benefits of moving towards a surgical center model  development of a user interfaced database to record and analyze …


Police Operations Simulation, Robert Mcgee Jun 2010

Police Operations Simulation, Robert Mcgee

Industrial and Manufacturing Engineering

In this report, the author explains the process of creating the Police Operations Simulation, shows step-by-step how it works, and statistically analyzes the results from SLOPD’s own proposed and current schedules. The data-gathering from the department and the simulation itself will receive the bulk of the coverage in this report, followed by sample results from SLOPD and a business plan for future sale to other departments.

Using the given numbers, it appears that the proposed schedule will result in significantly improved coverage for the city of San Luis Obispo. While any increase in the number officers on patrol tends to …


Axle Assembly Takt Time Change, Punit Shivji Mar 2010

Axle Assembly Takt Time Change, Punit Shivji

Industrial and Manufacturing Engineering

The Toyota managed New United Motor Manufacturing Inc. automotive plant is currently going through difficult economic times. To prepare for future production demands, the plant will need to decrease production output and maintain a lower volume of vehicles produced with a high level of quality and efficiency. This project will take on the reorganization of the rear axle assembly lines and the departments that are involved to ensure a cost effective, efficient, and safe approach in manufacturing Toyota's Tacomas. Toyota recommends the Toyota production system as well as any knowledge and experience obtained from previous jobs and coursework to be …


From Automatic Identification And Data Capture (Aidc) To “Smart Business Process”: Preparing For A Pilot Integrating Rfid, S. F. Wamba, E. Lefebvre, Y. Bendavid, L.. A. Lefebvre Jan 2010

From Automatic Identification And Data Capture (Aidc) To “Smart Business Process”: Preparing For A Pilot Integrating Rfid, S. F. Wamba, E. Lefebvre, Y. Bendavid, L.. A. Lefebvre

Dr Samuel Fosso Wamba

This paper examines the underlying logic behind the rules configured in a RFID middleware to support “smart business processes” in one retail supply chain. Through a detailed investigation of the underlying business processes, we will demonstrate how businesses rules can be defined, configured and refined in a RFID middleware. The results confirm that RFID technology is not a “Plug and Play” solution. RFID middleware configuration will require a high level of customization. Finally, this study allows the improvement of our understanding of the real potential of RFID technology in the supply chain context.


Implementing Rfid To Improve Animal Shelter Inventory And Allocation, Adam Mach Jan 2010

Implementing Rfid To Improve Animal Shelter Inventory And Allocation, Adam Mach

Industrial and Manufacturing Engineering

The purpose of this project is to observe the best way to incorporate Radio Frequency Identification (RFID) technology into the animal inventory system present in animal shelters, while also observing the benefits of implementing this system. The Woods Humane Society was used in this project as a sample animal care facility that could benefit from this application.

Many RFID systems can be observed in other industries, but very few examples this technology exist in animal shelters or smaller animal care facilities. Part of the reason for that is because funds are scarce at most animal care facilities, like the Woods …


Funeral Services Marketing Interface To Enhance Customer Service And Overall Productivity, Alyssa R. Habing Jan 2010

Funeral Services Marketing Interface To Enhance Customer Service And Overall Productivity, Alyssa R. Habing

Industrial and Manufacturing Engineering

Customer satisfaction is the ultimate goal of any business regardless of the industry it resides in; it’s the sole driver of a company’s productivity levels and overall success within the market. Although numb to most market fluctuations, the funeral industry needs to reinvent their business strategies continuously in order to increase their market share. It’s especially important for smaller funeral homes across the world to take this idea to another level in order to stay competitive with the larger, corporate establishments. In the past twenty years, the industry has grown exponentially due to more interest and popularity. The increase in …


Ernie Ball Guitars Woodshop Facilities Redesign, Cameron Lea Schlemer Jan 2010

Ernie Ball Guitars Woodshop Facilities Redesign, Cameron Lea Schlemer

Industrial and Manufacturing Engineering

This report details a facilities design for Ernie Ball’s guitar and bass guitar manufacturing facility in San Luis Obispo, CA. Specifically, this project will redesign the layout for the Woodshop, the largest of the 5 manufacturing cells in the facility. This project was completed using the Systematic Layout Planning procedure and focused mostly on phase II and III in which the specifics for a layout are determined, however, space requirements were not evaluated as it was not within scope.

The first step was to develop departments in the facilities; two master departments were identified for the neck manufacturing process and …


Determining A Reliability Factor For Photovoltaic's In San Luis Obispo, Ryan S. Roach Jan 2010

Determining A Reliability Factor For Photovoltaic's In San Luis Obispo, Ryan S. Roach

Industrial and Manufacturing Engineering

This project will analyze raw photovoltaic (PV) solar panel performance data in order to determine a reliability factor for solar panels in San Luis Obispo. This project is a subset of a larger project being performed by SLO RESCO, which is funded by a grant from the California Energy Commission. Their project will explore the use of solar, wind, geothermal, and biomass renewable resources. The scope of this project is limited to a small section of RESCO's analysis of solar panel technology and implementation in which a reliability factor will be generated.

The objective is to determine a reliability factor …


Recycling Made Easy: An Ergonomic Approach To Home Recycling And Trash Containers, Landon P. Boisclair Jan 2010

Recycling Made Easy: An Ergonomic Approach To Home Recycling And Trash Containers, Landon P. Boisclair

Industrial and Manufacturing Engineering

The purpose of this project is to create an ergonomically sound recycling/trash container, with the ultimate hope of making the recycling process easier and more intuitive, thereby increasing recycling rates. Currently, while there are many recycling/trash containers available for purchase, there is no product that has a design without glaring ergonomic flaws. An ergonomic design and product prototype was created as a part of this project, and was subsequently tested against a conventional prototype model. The data collected from the experiments conducted suggests that the new ergonomic model makes the waste disposal process and the container transportation process easier, while …


Digester Selection And Operation For Heybeli Island, Spencer Fackler, Joseph Violetti Jan 2010

Digester Selection And Operation For Heybeli Island, Spencer Fackler, Joseph Violetti

Industrial and Manufacturing Engineering

The Heybeli Digester project originated with Sema Alptekin in her personal research and was incorporated into a Senior Project opportunity at California Polytechnic State University, San Luis Obispo. The aim of this project was to select and design a plan for the use of a digester for the island of Heybeli, Turkey. The objective of this plan was to incorporate economic, social, and environmental justifications to evaluate if a digester would be a benefit to the community.

Systems Engineering analysis is a vital tool when working with complicated projects that include multiple systems interfacing with one another. Through the use …


Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head Jan 2010

Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head

Industrial and Manufacturing Engineering

The purpose of this project was to validate industrial designs for a product in its conceptual stage and suggest/implement design changes that suit the contracting company’s needs while assuring the product maintains its basic functional requirements. Techniques and methods used to validate the design include 3‐D solid modeling, physical product application using rapid prototyping to produce the product. Methods of design for manufacturing were analyzed in the design. Processes used in the validation and verification of the design include solid modeling design, methods of measurements, fixture design and manufacturing processes. Full design specifications and solid model files were finalized and …


Nonprofit Management Through Effective Database Utilization, Jennifer Muscat Jan 2010

Nonprofit Management Through Effective Database Utilization, Jennifer Muscat

Industrial and Manufacturing Engineering

This project addresses problems found within a specific department within Lifewater International. Lifewater faces many unique challenges operating as a nonprofit. Like most nonprofits, elaborate costly solutions are simply not an option when solving department problems. This project addresses three interrelated problems within Lifewater’s Development and Communications Department. The three issues addressed are Volunteer Management, Donor Management, and Project Management. Each problem was examined to determine the areas for improvement that this project can handle and solve. Each problem was given an improved design. A Volunteer Management System was designed to increase volunteer utilization and appropriately match volunteers with appropriate …


Non-Profit Management System For Friends Of The Elephant Seal, Matthew Justus, Robert Macasi, Jeff Zinn Jan 2010

Non-Profit Management System For Friends Of The Elephant Seal, Matthew Justus, Robert Macasi, Jeff Zinn

Industrial and Manufacturing Engineering

Friends of the Elephant Seal (FES) are a non-profit organization based in San Simeon, California. Their current method of tracking and reporting information is inefficient. A project was proposed to develop a new information management system for FES, install it at their office and provide training including a user manual. The project was divided into three parts: Database Design and Implementation; User Interface Design and Ergonomics; and User Manual & Help System.

The objective of the project was to design a user-friendly interface specifically for the FES worker that allowed for easy access to data entry functions, reporting functions and …


The Optimization Of The Threshold For The Preventive Maintenance Actions In A Condition-Based Maintenance Program Via Dynamic Programming Approach, Kamran Shahanaghi, Mehdi Jafarian, Majid Beikverdi, Zeinab Nezhadbiglari Jan 2010

The Optimization Of The Threshold For The Preventive Maintenance Actions In A Condition-Based Maintenance Program Via Dynamic Programming Approach, Kamran Shahanaghi, Mehdi Jafarian, Majid Beikverdi, Zeinab Nezhadbiglari

Mehdi Jafarian

The last step of a condition based maintenance (CBM) program is maintenance decision-making. This step is the most important and the most critical stage of maintenance for executive personnel and management whom work on taking maintenance actions. This decision making would be done according to certain criteria such as risk, cost, reliability and availability. This paper considered a dynamic programming model to optimization of the threshold for the preventive maintenance actions in a condition-based maintenance program. The basis of this modeling is the average cost of maintenance actions, failures and exchanges. In this paper, we improved the memory of the …


Alleviation Of Spindle Transfer, Blake Ochs, Whitney Bone Jan 2010

Alleviation Of Spindle Transfer, Blake Ochs, Whitney Bone

Industrial and Manufacturing Engineering

Haas Automation, Inc. is one of the largest CNC machine tool builders in the world. They produce an assortment of machines that come in many different sizes, however, all machines have in common the central tool that allows them to perform their surfacing and bore functions, the spindle. As with the machines themselves, the spindles can also range in size depending on the type of machine they are going into. These spindles are assembled step by step and as components are added to them, several models become so heavy that it is not feasible to have operators lift them by …


Layout And Procedure Re-Design Of Dcpp Receiving Warehouse, Nicole Elizabeth Riegel Jan 2010

Layout And Procedure Re-Design Of Dcpp Receiving Warehouse, Nicole Elizabeth Riegel

Industrial and Manufacturing Engineering

The receiving warehouse at Diablo Canyon Power Plant, owned by Pacific Gas and Electric, serves as a place to recognize the receiving of items into an ERP system, repackage and label items for long-term storage, and organize items for delivery inside the secured area. The warehouse managers would like to redesign the layout and procedures of the warehouse. Currently items are not received, scanned, or shipped in a timely manner. The flow of people and items in the receiving and shipping area is chaotic and space is limited especially during plant outages. The objective of this project is to: • …


Decision Analysis Tool For Appropriate Water Treatment Technologies In Improverished Villages, Conner David Johnston Jan 2010

Decision Analysis Tool For Appropriate Water Treatment Technologies In Improverished Villages, Conner David Johnston

Industrial and Manufacturing Engineering

No abstract provided.


The Optimal Warehouse Location For Cal Poly's Campus Dining, Robert Buie Jan 2010

The Optimal Warehouse Location For Cal Poly's Campus Dining, Robert Buie

Industrial and Manufacturing Engineering

The Cal Poly Corporation and Campus Dining face the challenge of meeting the growth of students and dining venues on campus with the limited space capacity of their warehouse in building 19. Given a $250,000 budget, Campus Dining has an option to keep the warehouse at the current location at building 19 or moving the warehouse to building 82 off Mt. Bishop Road. Each warehouse location has its benefits as building 19 is in the center of campus and building 82 has much more shelving space than building 19. The objective of this project was to select the better choice …


Energy Audit And Optimization For "Arches Etc.", James Ross Dixon Jan 2010

Energy Audit And Optimization For "Arches Etc.", James Ross Dixon

Industrial and Manufacturing Engineering

Arches etc. is a San Diego business, which specializes in the manufacture, distribution, and installation of custom designed doors, windows, mouldings, and hardware. Due to the recent economic downturn, which has hindered the construction industry, Arches etc. believed that an analysis and optimization of their energy usage would provide additional assistance towards their goal to lower overhead and maintain current operations.

To begin this task, a comprehensive energy audit was conducted to establish an initial state from which to base improvements. Arches etc.’s current monthly utility bill averages $996, which solidifies the accuracy of this project’s performed energy audit, estimating …


Application Of Radio Frequency Identification To An Asset Checkout System, Ma'ayan K. Bennaim Jan 2010

Application Of Radio Frequency Identification To An Asset Checkout System, Ma'ayan K. Bennaim

Industrial and Manufacturing Engineering

Radio Frequency Identification (RFID) is a growing technology which is increasingly utilized throughout industry. This senior project identifies an RFID alternative to the checkout system in the tool crib of the Cal Poly Aero Hanger. A new database is designed and built to interface with an RFIDeas AIR enroll reader. The system realizes vast time savings in check in times and increases student accountability for the tools which are checked out by tagging tools.


Visual Representations Of Queried Database Results Using Google's Mapping Technologies, Steven Michael Kilbert Jan 2010

Visual Representations Of Queried Database Results Using Google's Mapping Technologies, Steven Michael Kilbert

Industrial and Manufacturing Engineering

Database queries have been used in business applications throughout the world to filter out specific information which is often used as a basis for making a decision. Despite the broad use of queries, there are only a limited number of ways to represent results, the most common being a dynaset, or results table. This paper describes the investigation of methods to create more visual representations of results using maps to show queried geospatial data. From these methods, applications were successfully developed to create customized maps in Google Earth and Google Maps based on queried geographical data from Microsoft Access databases. …