Open Access. Powered by Scholars. Published by Universities.®
Operations Research, Systems Engineering and Industrial Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 1 of 1
Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering
Linear Physical Programming For Solving The Multi-Criteria Disassembly-To-Order Problem Under Stochastic Yields, Limited Supply, And Quantity Discount, Amre Massoud, Surendra Gupta
Linear Physical Programming For Solving The Multi-Criteria Disassembly-To-Order Problem Under Stochastic Yields, Limited Supply, And Quantity Discount, Amre Massoud, Surendra Gupta
Surendra M. Gupta
This paper focuses on the disassembly-to-order (DTO) problem. End-of-life (EOL) products are purchased from a number of suppliers in order to be disassembled into individual components to satisfy the demand for specified numbers of components. However, there are a lot of uncertainties that complicates the process. Previous work in the literature solved the DTO problem under multiple uncertainties and a single objective. Other models solved the multicriteria DTO problem with a single uncertainty. This paper develops a multi-criteria DTO model that takes into consideration multiple system uncertainties and solves it using Linear Physical Programming (LPP). The main objective was to …