Open Access. Powered by Scholars. Published by Universities.®
Operations Research, Systems Engineering and Industrial Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Keyword
Articles 1 - 2 of 2
Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering
Improved Brain-Storm Optimizer For Disassembly Line Balancing Problems Considering Hazardous Components And Task Switching Time, Ziyan Zhao, Pengkai Xiao, Jiacun Wang, Shixin Liu, Xiwang Guo, Shujin Qin, Ying Tang
Improved Brain-Storm Optimizer For Disassembly Line Balancing Problems Considering Hazardous Components And Task Switching Time, Ziyan Zhao, Pengkai Xiao, Jiacun Wang, Shixin Liu, Xiwang Guo, Shujin Qin, Ying Tang
Henry M. Rowan College of Engineering Faculty Scholarship
Disassembling discarded electrical products plays a crucial role in product recycling, contributing to resource conservation and environmental protection. While disassembly lines are progressively transitioning to automation, manual or human–robot collaborative approaches still involve numerous workers dealing with hazardous disassembly tasks. In such scenarios, achieving a balance between low risk and high revenue becomes pivotal in decision making for disassembly line balancing, determining the optimal assignment of tasks to workstations. This paper tackles a new disassembly line balancing problem under the limitations of quantified penalties for hazardous component disassembly and the switching time between adjacent tasks. The objective function is to …
Modeling Of A Microstrip Line Referenced To A Meshed Return Plane, Zeyi Sun, Jian Liu, Xiaoyan Xiong, Yuan Liu, Victor Khilkevich, Donghyun Kim, Daryl G. Beetner
Modeling Of A Microstrip Line Referenced To A Meshed Return Plane, Zeyi Sun, Jian Liu, Xiaoyan Xiong, Yuan Liu, Victor Khilkevich, Donghyun Kim, Daryl G. Beetner
Engineering Management and Systems Engineering Faculty Research & Creative Works
Transmission Lines Referenced to Meshed Return Planes Are Widely Used Because of the Physical Flexibility Imparted by the Meshed Plane. Poor Accounting for the Meshed Ground, However, Can Lead to Severe Signal Integrity and Radio Frequency Interference Issues. Full-Wave Simulation Can Characterize the Electrical Performance at an Early Design Stage, But It is Both Time and Computational Resource Consuming. to Make the Simulation More Efficient, a Method is Proposed in This Study to Model Transmission Lines with a Meshed Reference Ground using 2D Analysis. the 2D Analysis is Performed at Several Locations Along the Length of the Trace above the …