Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Engineering

A97 Electrostatic Precipitator (Esp) Waste Elimination, Brian Acosta, Alyssa Young, Austin Straw Apr 2020

A97 Electrostatic Precipitator (Esp) Waste Elimination, Brian Acosta, Alyssa Young, Austin Straw

Scholar Week 2016 - present

This project focuses on the development of a waste elimination system. the Kankakee BASF site produces a waste known as acid ester waste through their air pollution system in area 97; this waste is highly corrosive and is causing damage to their process sewer. A waste elimination system had to be developed in order to remove the acid ester was from the process sewer without compromising the operation of the BASF Kankakee site.



Sae Baja Suspension Optimization, Jarrod Lesage, Jonah Trank, Tyler Fisher Apr 2020

Sae Baja Suspension Optimization, Jarrod Lesage, Jonah Trank, Tyler Fisher

Scholar Week 2016 - present

For our senior design project, we were all assigned to the Baja Suspension Team. This year our goal, as given to us by our sponsor Dr. Bob Allen, is to optimize the current suspension that is already on our vehicle. This includes the tire psi, shock psi, brake testing, camber, and toe. It is also our job as a team to oversee the Baja Team as a whole and besides the drivetrain, to make sure the whole car is ready for competition in May. This includes following the 2020 Baja SAE rulebook.


Olivet Nazarene University Ward Field Parking Garage, Eric Everley, Micah Rodriguez, Joel Hasselbring, Robert W. Rienow Apr 2020

Olivet Nazarene University Ward Field Parking Garage, Eric Everley, Micah Rodriguez, Joel Hasselbring, Robert W. Rienow

Scholar Week 2016 - present

Over past years, Olivet Nazarene University has grown a tremendous amount. Including the construction of new buildings and the increasing population of faculty and students, this growth has created a need for more parking space. In this past semester our team has been working to design a solution to this issue. We have decided to design a three-story parking garage spanning the entire parking lot east of Centennial Chapel. This parking garage will include approximately 800 additional parking spaces and will include a commuter lounge and locker rooms for the Olivet Nazarene football team. The additional parking spaces will provide …