Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

2019

PDF

Series

University of Nebraska - Lincoln

Highway

Articles 1 - 5 of 5

Full-Text Articles in Engineering

Long-Term Performance Evaluation Of Nudeck In Kearney East Bypass, George Morcous, Marc Maguire Dec 2019

Long-Term Performance Evaluation Of Nudeck In Kearney East Bypass, George Morcous, Marc Maguire

Nebraska Department of Transportation: Research Reports

The Kearney East Bypass bridge is the first project that implements the newly developed precast concrete deck system (known as 2nd generation NUDECK). The new system consists of full-depth full-width precast prestressed concrete deck panels that are 12 ft (3.66 m) long each. The panels have covered shear pockets at 4 ft (1.22 m) spacing on each girder line to host clustered shear connectors that are adjustable in height. Narrow unreinforced transverse joints are used to eliminate the need for deck overlay. Also, deck panels are post-tensioned in the longitudinal direction using a new post-tensioning system that eliminates the need …


Performance Evaluation Of Inverted Tee (It) Bridge System, Garrett P. Martindale, Daniel Watson, Antony Mohsen Kamal Masoud Kodsy, Mostafa Abo El-Khier, Richard L. Wood, George Morcous Aug 2019

Performance Evaluation Of Inverted Tee (It) Bridge System, Garrett P. Martindale, Daniel Watson, Antony Mohsen Kamal Masoud Kodsy, Mostafa Abo El-Khier, Richard L. Wood, George Morcous

Nebraska Department of Transportation: Research Reports

The Inverted Tee (IT) girder bridge system was originally developed in 1996 by the University of Nebraska–Lincoln (UNL) researchers and Nebraska Department of Transportation (NDOT) engineers. This bridge system currently accounts for over 110 bridges in Nebraska used for both state highways and local county roads. Extensive longitudinal and transverse deck cracking have been observed and noted in numerous bridge inspection reports. Since the IT girder bridge system is relatively new, limited data and knowledge exist on its structural performance and behavior. This study evaluates the IT girder bridge system by conducting twenty field observations as well as recording accelerometer, …


Restricted Crossings On Rural Highways, John Sangster, Tim Adams Jun 2019

Restricted Crossings On Rural Highways, John Sangster, Tim Adams

Nebraska Department of Transportation: Research Reports

This study examines the potential for replacing the standard intersection design at two-way stop control (TWSC) and all- way stop control (AWSC) intersections along rural highways with a roundabout or a restricted crossing u-turn (RCUT) facility. The geometry of the RCUT design prohibits left and through movements from the side road, and provides a u-turn location downstream from the main crossing. This type of facility has been implemented for rural highways extensively in both Maryland and North Carolina, as well as in limited cases in many other states such as Minnesota and Missouri, with the potential to serve as a …


34-Inch Tall Three Beam Transition To Concrete Buttress, Scott Rosenbaugh, Wyatt Fallet, Ronald K. Faller, Robert W. Bielenberg, Jennifer Schmidt Mar 2019

34-Inch Tall Three Beam Transition To Concrete Buttress, Scott Rosenbaugh, Wyatt Fallet, Ronald K. Faller, Robert W. Bielenberg, Jennifer Schmidt

Nebraska Department of Transportation: Research Reports

Roadway resurfacing and overlay projects effectively reduce the height of roadside barriers placed adjacent to the roadway, which can negatively affect their crashworthiness. More recently, bridge rails and concrete barriers have been installed with slightly increased heights to account for future overlays. However, adjacent guardrails and approach transitions have not yet been modified to account for overlays. The objective of this project was to develop an increased-height, approach guardrail transition (AGT) to be crashworthy both before and after roadway overlays of up to 3 in. (76 mm).

A 34-in. (864-mm) tall, thrie beam transition was designed such that the system …


Validation Of The Mechanical Rocker Test Method For Ice Melting Capacity (Mrt-Imc), Lieska Halsey, David Hansen Jan 2019

Validation Of The Mechanical Rocker Test Method For Ice Melting Capacity (Mrt-Imc), Lieska Halsey, David Hansen

Nebraska Department of Transportation: Research Reports

The anti-icing and deicing industry has interest in the development of an objective, repeatable test procedure for the evaluation and comparison of anti-icing and deicing products. Pursuant to this goal, the Nebraska Department of Transportation (NDOT) funded research at the University of Nebraska-Lincoln (UNL) to investigate methods for evaluating deicing products, beginning in 2011[1]. Researchers at UNL developed the procedure for the Mechanical Rocker Test for Ice Melting Capacity (MRT or MRT-IMC) in 2014[2].

From 2017-2019, NDOT evaluated the MRT-IMC procedure for validity and suitability as a standard test procedure for assessing deicer performance. NDOT also explored opportunities to improve …