Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Air Force Institute of Technology

Scheduling

Operations and Supply Chain Management

Publication Year

Articles 1 - 4 of 4

Full-Text Articles in Engineering

Vehicle Minimization For The Multimodal Pickup And Delivery Problem With Time Windows, Benjamin A . Clapp Mar 2013

Vehicle Minimization For The Multimodal Pickup And Delivery Problem With Time Windows, Benjamin A . Clapp

Theses and Dissertations

The algorithm proposed here is used for heuristic solutions for the Multimodal Multiple Vehicle Routing Problem with Unloading Capacity, Pickup and Dropoff, and Time Windows, solved so as to minimize the number of vehicles used, subject to varying objective function values for each vehicle. The MVRP is simplified and split into a routing problem and a scheduling problem. The routing problem is addressed by Dijkstra's Algorithm. This generates a new network for the second stage of the algorithm. It is assumed that the shortest path is the correct path to use, and shipments each travel unimodally. The scheduling problem is …


Optimization Model For Base-Level Delivery Routes And Crew Scheduling, Young-Ho Cha Mar 2005

Optimization Model For Base-Level Delivery Routes And Crew Scheduling, Young-Ho Cha

Theses and Dissertations

In the U.S. Air Force, a Logistic Readiness Squadron (LRS) provides material management, distribution, and oversight of contingency operations. Dispatchers in the LRS must quickly prepare schedules that meet the needs of their customers while dealing with real-world constraints, such as time windows, delivery priorities, and intermittent recurring missions. Currently, LRS vehicle operation elements are faced with a shortage of manpower and lack an efficient scheduling algorithm and tool. The purpose of this research is to enhance the dispatchers' capability to handle flexible situations and produce "good" schedules within current manpower restrictions. In this research, a new scheduling model and …


The Scheduling Process In A Depot From The Brazilian Air Force, Fabricio J. Saito Jun 1998

The Scheduling Process In A Depot From The Brazilian Air Force, Fabricio J. Saito

Theses and Dissertations

The Brazilian Air Force (BAF) in its logistic structure contains 5 Air Logistic Centers (depots). This thesis concentrates its analysis on one of the most important BAF depots located at Sao Paulo (PAMASP). This thesis explores the scheduling process currently used in PAMASP. This thesis adopted a managerial approach in a sense that it looked to take a big picture of the current process. The researcher performed field interviews with the goal of describing the process. During the visit to PAMASP, the researcher also gathered problems related to the process. The recommendations stated on this study were based on the …


Crisis Airlift Management: Effective Scheduling, David C. Penny Sep 1996

Crisis Airlift Management: Effective Scheduling, David C. Penny

Theses and Dissertations

This is a report on the basis, data, findings, and models developed for US Transportation Command and Headquarters Air Mobility Command. Focusing on the dynamic scheduling problem that arises during management of airlift assets into space-constrained airfields during a crisis, this research explains the conditions surrounding this event, discusses several areas of potential cross-functional applications, presents analysis of current performance, and provides several modeling possibilities for schedule efficiency. Past research in the Flow Management Problem (an airline flow control issue) is extensive, but specific applications in crisis airlift are long in coming, primarily due to the complexity of the environment. …