Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 3 of 3
Full-Text Articles in Engineering
Providing Rational For Further Funding Additive Manufacturing Efforts In The Air Force, Trever J. Braunberger
Providing Rational For Further Funding Additive Manufacturing Efforts In The Air Force, Trever J. Braunberger
Theses and Dissertations
Extremely long lead times for legacy aircraft replacement parts often exceed 120 days and cost 3 to 4 times the original price drives a search for alternative manufacturing methods such as additive manufacturing. Currently, the method to procuring a legacy replacement for aircraft such as the C-130 is daunting and at times, impossible. Through a comprehensive knowledge collection of organizational data the Air Force body of knowledge increases and provides actionable data to decision makers which has the potential of dramatically decreasing part wait times and procurement. The proposed, intuitive decision analysis framework mapped out in this research provides relevant …
Air Mobility Command's En Route Support Infrastructure: A Construct Of Aircraft Type And Geographic Location Utilized To Assess En Route Aircraft Logistics Support, Robert D. Polomsky
Air Mobility Command's En Route Support Infrastructure: A Construct Of Aircraft Type And Geographic Location Utilized To Assess En Route Aircraft Logistics Support, Robert D. Polomsky
Theses and Dissertations
The ability of the United States Armed Forces to maintain a global presence and rapidly project military power anywhere in the world are key factors in preserving our freedom. To accomplish the demanding task of global reach support, Air Mobility Command employs an en route support infrastructure. These en route locations provide varying levels of command, control, and communications (C3), logistics support, and aerial port functions. The goal of the en route is to minimize delays for AMC mission aircraft. However, these en route locations comprise a small percentage of the locations that AMC aircraft visit. Given the critical demand …
Logistics Control Facility: A Normative Model For Total Asset Visibility In The Air Force Logistics System, Eric C. Lorraine, Michael E. Michno
Logistics Control Facility: A Normative Model For Total Asset Visibility In The Air Force Logistics System, Eric C. Lorraine, Michael E. Michno
Theses and Dissertations
Computer simulation was used to evaluate the impact of a Logistics Control Facility LCF with a Total Asset Visibility TAV system on the AF logistics systems ability to support a weapon system. For this study, the B-1B was chosen as the weapon system of interest. Two performance measures, expected fully mission capable rates and expected pipeline quantities, were used to evaluate the simulation results. Two-sample tests were used to compare the current logistics configuration of the B-1B with the same configuration, but with an LCF controlling the movement of assets. The expected FMC rate performance measure showed significant results while …