Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

PDF

Nebraska Department of Transportation: Research Reports

2019

Finite element analysis

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Long-Term Performance Evaluation Of Nudeck In Kearney East Bypass, George Morcous, Marc Maguire Dec 2019

Long-Term Performance Evaluation Of Nudeck In Kearney East Bypass, George Morcous, Marc Maguire

Nebraska Department of Transportation: Research Reports

The Kearney East Bypass bridge is the first project that implements the newly developed precast concrete deck system (known as 2nd generation NUDECK). The new system consists of full-depth full-width precast prestressed concrete deck panels that are 12 ft (3.66 m) long each. The panels have covered shear pockets at 4 ft (1.22 m) spacing on each girder line to host clustered shear connectors that are adjustable in height. Narrow unreinforced transverse joints are used to eliminate the need for deck overlay. Also, deck panels are post-tensioned in the longitudinal direction using a new post-tensioning system that eliminates the need …


Performance Evaluation Of Inverted Tee (It) Bridge System, Garrett P. Martindale, Daniel Watson, Antony Mohsen Kamal Masoud Kodsy, Mostafa Abo El-Khier, Richard L. Wood, George Morcous Aug 2019

Performance Evaluation Of Inverted Tee (It) Bridge System, Garrett P. Martindale, Daniel Watson, Antony Mohsen Kamal Masoud Kodsy, Mostafa Abo El-Khier, Richard L. Wood, George Morcous

Nebraska Department of Transportation: Research Reports

The Inverted Tee (IT) girder bridge system was originally developed in 1996 by the University of Nebraska–Lincoln (UNL) researchers and Nebraska Department of Transportation (NDOT) engineers. This bridge system currently accounts for over 110 bridges in Nebraska used for both state highways and local county roads. Extensive longitudinal and transverse deck cracking have been observed and noted in numerous bridge inspection reports. Since the IT girder bridge system is relatively new, limited data and knowledge exist on its structural performance and behavior. This study evaluates the IT girder bridge system by conducting twenty field observations as well as recording accelerometer, …