Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix A: Geology And Seismology (Supplement), Walter A. Anderson, New England Division, United States Army Engineer Division Jan 1980

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix A: Geology And Seismology (Supplement), Walter A. Anderson, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The plan was prepared for a close working relationship between the evaluation teams and the immediate availability of geochemical and geophysical data to the geologic mapping team. Those samples determined in the field to be anomalously high in heavy metals by cold extractable procedures were sent to North American Laboratories where metal content determinations were made through: atomic absorption and spectrophotometry after hot acid digestion techniques.


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

Construction of the proposed Dickey-Lincoln School Lakes Project in Aroostook County, Maine will result in the isolation of an area of land due to the impoundment behind Dickey Dam. This land area is located between the United States - Canadian border, the Little Black River, the impoundment (elevation = 913 feet), the Big Black River, and the Shields Branch of the Big Black River, and comprises 183,768 acres of land. A previous report (ERT, 1977) determined the forest types within two miles of the impoundment but did not extend to the Canadian border. This report addresses the forest types


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies (Supplement), Christoipher J. Schmitt, Dennis R. Sasseville, Normandeau Associates, Inc., New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies (Supplement), Christoipher J. Schmitt, Dennis R. Sasseville, Normandeau Associates, Inc., New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

Sediment mercury concentrations higher than levels normall y considered trace or background were encountered up to 80 cm belo w the sediment-water interface in samples obtained from four oligotrophi c lakes in northern Maine . These lakes are in three different watershed s and are as far as 65 km apart . The values reported are far lower than levels reported elsewhere from contaminated sites . The distributio n and magnitude of the sediment concentrations encountered suggest long-ter m diffuse mercury inputs to the lakes from the watersheds . In addition , concentrations up to twice as high in near-surface …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc. Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc.

Dickey-Lincoln School Lakes Project

The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west. Major tributaries of the St. John affected by …


Dickey-Lincoln School Lakes Project Environmental Impact Statement : Appendix G: Recreation Resources, Northern Maine Regional Planning Commission, Land Use Consultants, Inc., New England Division, U.S. Army Corps Of Engineers Jan 1977

Dickey-Lincoln School Lakes Project Environmental Impact Statement : Appendix G: Recreation Resources, Northern Maine Regional Planning Commission, Land Use Consultants, Inc., New England Division, U.S. Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west.


Terrestrial Ecology Of The Dickey-Lincoln School Lakes Project, Corps Of Engineers, New England Division, Environmental Research & Technology, Inc Jan 1976

Terrestrial Ecology Of The Dickey-Lincoln School Lakes Project, Corps Of Engineers, New England Division, Environmental Research & Technology, Inc

Dickey-Lincoln School Lakes Project

This introduction of the St. John River watershed is situated in a transitional zone between the Boreal Forest Formation and the Eastern Deciduous Forest Formation. Second-growth forests representative of these two ecosystems cover extensive areas of the project site. The boreal forest forms a broad transcontinental belt in northern North America and Eurasia, with southern montane extensions. This northern forest is characterized by evergreen, coniferous trees, predominately spruce-fir The eastern deciduous forest, composed of broad-leaved hardwoods, extends throughout the eastern United States except Florida (Dasmann, 1968; Oosting, 1956).


Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1975

Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Revised draft combines data previously published in two separate impact statements prepared by the corps relating to the dams, reservoirs and power plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid. The latter agency is responsible for the marketing and distribution of power generated at federally-financed installations.