Articles 1 - 2 of 2

Full-Text Articles in Engineering

Design And Implementation Of An Automated Oil Distribution System For A Homogenizer Machine In Gea Mechanical Equipment – Niro Soavi, Luca Gandolfi May 2019

Design And Implementation Of An Automated Oil Distribution System For A Homogenizer Machine In Gea Mechanical Equipment – Niro Soavi, Luca Gandolfi

Theses

This thesis shows the steps that have been followed and done in order to improve a critical operation of a technological process of the GEA Mechanical Equipment. The critical operation was the filling with different types of oils the homogenizing machine because it was characterized by a lot of inefficiencies and, in particular, by huge risks for job security. These critical issues gave the opportunity and the chance to realize a project in order to give a process optimization and security improvement.

After having faced all the aspects and steps needed for this project, it has been realized a system …


Resource Assignment In Short Life Technology Intensive (Slti) New Product Development (Npd), Randy A. Reagan Jan 2010

Resource Assignment In Short Life Technology Intensive (Slti) New Product Development (Npd), Randy A. Reagan

Dissertations

Enterprises managing multiple concurrent New Product Development (NPD) projects face significant challenges assigning staff to projects in order to achieve launch schedules that maximize financial returns. The challenge is increased with the class of Short Life Technology Intensive (SLTI) products characterized by technical complexity, short development cycles and short revenue life cycles. Technical complexity drives the need to assign staffing resources of various technical disciplines and skill levels. SLTI products are rapidly developed and launched into stationary market windows where the revenue life cycle is short and decreasing with any time-to-market delay. The SLTI-NPD project management decision is to assign …