Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Manufacturing

New Jersey Institute of Technology

Theses/Dissertations

1994

Scheduling (Management)--Automation

Articles 1 - 1 of 1

Full-Text Articles in Engineering

An Integrated Mrp And Finite Scheduling System To Derive Detailed Daily Schedules For A Manufacturing Shop, Sita D. Nathan Jan 1994

An Integrated Mrp And Finite Scheduling System To Derive Detailed Daily Schedules For A Manufacturing Shop, Sita D. Nathan

Theses

Many companies rely on Material Requirements Planning (MRP) to support their Production Scheduling and Control (PS&C) functions. Since MRP does not provide a detailed shop floor schedule, these users have to implement either a third party procedure or an internally developed procedure for shop floor controls. In this thesis we consider a class of user shops which are characterized by the following features:

  • Homogenous machines, that is all machines can produce all products.

  • Each product requires a setup, but several products may have a common setup.

  • MRP requirements are specified on a weekly basis while actual requirements are specified on …