Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering

PDF

California Polytechnic State University, San Luis Obispo

Construction Management

2017

Poly Canyon

Articles 1 - 1 of 1

Full-Text Articles in Engineering

Preconstruction Services For The Modular House, Trevor Daniel Houghton Jun 2017

Preconstruction Services For The Modular House, Trevor Daniel Houghton

Construction Management

The "Modular House", originally named for its composition of 8x8x8 foot steel framed modules, has experienced a rich history of tenants, additions, and tourism. This structure was one of the first to be erected in California Polytechnic’s Poly Canyon. After many great years as a residence and iconic structure the house was ultimately abandoned in 2010. Since then, the building and the canyon have seen increased vandalism and weathering backed by minimal maintenance, resulting in unsafe conditions for the general public. Our mission was to allow this structure to be enjoyed by the public while highlighting its initial architectural features. …