Open Access. Powered by Scholars. Published by Universities.®
- Publication Type
Articles 1 - 3 of 3
Full-Text Articles in Engineering
Housing Pre-Fabrication And Resource Optimization, Emma Dubensky
Housing Pre-Fabrication And Resource Optimization, Emma Dubensky
Honors Theses
Enclosure during construction is often time-consuming, expensive, and at the mercy of the weather. By introducing methods for manufacturing prefabricated enclosure components such as wall panels and roof sections, the impact of the three major variables is reduced. Designs for trusses, roof sections, wall sections, and foundations were developed and selected using civil engineering principles; and manufacturing and logistical processes were optimized using engineering and project management skill sets. These multi-disciplinary efforts were combined to create an accessible and versatile set of designs and instructions that can improve the effectiveness of both a skilled and non-skilled volunteer workforce. By creating …
Housing Prefabrication And Resource Optimization, Megan Scherpereel
Housing Prefabrication And Resource Optimization, Megan Scherpereel
Honors Theses
Enclosure during construction is often time-consuming, expensive, and at the mercy of the weather. By introducing methods for manufacturing prefabricated enclosure components such as wall panels and roof sections, the impact of the three major variables is reduced. Designs for trusses, roof sections, wall sections, and foundations were developed and selected using civil engineering principles; and manufacturing and logistical processes were optimized using engineering and project management skill sets. These multi-disciplinary efforts were combined to create an accessible and versatile set of designs and instructions that can improve the effectiveness of both a skilled and non-skilled volunteer workforce. By creating …
Loup Public Power District Fishing Pier & Parking Lot, Tyler Ruwe
Loup Public Power District Fishing Pier & Parking Lot, Tyler Ruwe
Honors Theses
This project was performed in fulfillment of the Civil Engineering Senior Design class (CIVE 489H). The goal of this project was to design an ADA compliant fishing pier and parking lot for the Loup Public Power District in Columbus, Nebraska. The fishing pier and parking lot will be located near the northeast corner of Lake North. A four-member team was formed to delegate the workload to accomplish this design project. I, Tyler Ruwe, served as the team’s project manager and structural engineering lead. Other disciplines of this design project included work involved in geotechnical, water resources, environmental, and transportation engineering. …