Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Civil Engineering

University of Nebraska - Lincoln

Series

2013

MUTCD

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Calibration Of Work Zone Impact Analysis Software For Missouri, Praveen Edara Ph.D., P.E., Ptoe, Carlos Sun Ph.D., P.E., Jd, Zhongyuan Zhu Jan 2013

Calibration Of Work Zone Impact Analysis Software For Missouri, Praveen Edara Ph.D., P.E., Ptoe, Carlos Sun Ph.D., P.E., Jd, Zhongyuan Zhu

Mid-America Transportation Center: Final Reports and Technical Briefs

This project calibrated two software programs used for estimating the traffic impacts of work zones. The WZ Spreadsheet and VISSIM programs were recommended in a previous study by the authors. The two programs were calibrated using field data from two work zones in Missouri. Both work zones involved a single lane closure on a three-lane section of roadway. The I-44 work zone was a long-term work zone, while the I-70 work zone was temporary, lasting only a few hours. The capacity values required for calibration were nearly identical for the two programs: 1,575 veh/hr/ln for the WZ Spreadsheet and 1,514 …


Investigation Of Alternative Work Zone Merging Sign Configurations, Praveen Edara Ph.D., P.E., Ptoe, Zhongyuan Zhu, Carlos Sun Ph.D., P.E., Jd Jan 2013

Investigation Of Alternative Work Zone Merging Sign Configurations, Praveen Edara Ph.D., P.E., Ptoe, Zhongyuan Zhu, Carlos Sun Ph.D., P.E., Jd

Mid-America Transportation Center: Final Reports and Technical Briefs

This study investigated the effect of an alternative merge sign configuration within a freeway work zone. In this alternative configuration, the graphical lane closed sign from the MUTCD was compared with a MERGE/arrow sign on one side and a RIGHT LANE CLOSED sign on the other side. The study measured driver behavior characteristics including speeds and open lane occupancies. The measurements were taken at two identical work zones on I-70 in Missouri, one with the new test sign and the other with the standard MUTCD sign. The study found that the open lane occupancy upstream of the merge sign was …