Stabilization And Improvement Of Organic Soils, Joonho Hwang, Aaron Humphrey, Antonio Bobet, Maria Caterina Santagata Sep 2005

Stabilization And Improvement Of Organic Soils, Joonho Hwang, Aaron Humphrey, Antonio Bobet, Maria Caterina Santagata

JTRP Technical Reports

Peats and organic soils in general pose significant problems to geotechnical engineers due to their low strength, high compressibility and elevated creep. The research performed addressed one soil improving technique, deep soil mixing, that has been widely used for treating soft clays, but that especially in the US has found limited use in presence of organic soils. The work performed made use primarily of one soil sampled on Lindberg Road (LR) in West Lafayette, IN characterized by LOI= 45-52%, LL= 327%, PL= 162%, LLoven dried/LLnon-dried = 0.31, Gs = 2.05-2.12, fiber content ~2.29%, clay fraction = 40.6%. In addition, a …


Modern Technologies For Design Data Collection, James Samuel Bethel, Steven D. Johnson, Monica Prezzi, Boudewijn H. W. Van Gelder, Bob G. Mccullouch, Ali Fuat Cetin, Seungwoo Han, Mosab Hawarey, Changno Lee, Aparajithan Sampath, Jie Shan Aug 2005

Modern Technologies For Design Data Collection, James Samuel Bethel, Steven D. Johnson, Monica Prezzi, Boudewijn H. W. Van Gelder, Bob G. Mccullouch, Ali Fuat Cetin, Seungwoo Han, Mosab Hawarey, Changno Lee, Aparajithan Sampath, Jie Shan

JTRP Technical Reports

Design data collection involving the use of Lidar instrument, in conjunction with GPS proves to be very effective. Data required to model two bridges over the I-70 was collected on a single day, involving five and six sessions with Lidar equipment. Even though the data was collected on two bridges, it did not cause any disruption of the traffic, either on the Interstate or on the bridges. A major cause of concern during survey activities, particularly along interstates is safety, both for the motorists as well as the people involved in data collection. Lidar data collection was found to be …


Remediation And Stabilization Of Soils Contaminated By Lead Resulting From The Removal Of Paint From Bridges, M. K. Banks, A. Paul Schwab Jan 2005

Remediation And Stabilization Of Soils Contaminated By Lead Resulting From The Removal Of Paint From Bridges, M. K. Banks, A. Paul Schwab

JTRP Technical Reports

Lead-based paints are commonly used for painting steel bridge structures. Soils in the immediate vicinity of older bridges have been contaminated with Pb as a result of normal weathering and peeling of the paint coupled with removal prior to repainting. The objectives of this project were to assess the extent of lead contamination near highway bridges and to evaluate phytoremediation and immobilization as means of remediation. We examined soils in the vicinity of approximately 20 bridges in Indiana that had been repainted recently and were know to have been painted originally with Pb-based paint. We found only three bridges in …


Family Of Compaction Curves For Chemically Modified Soils, Radha Krishna Daita, Vincent P. Drnevich, Daehyeon Kim Jan 2005

Family Of Compaction Curves For Chemically Modified Soils, Radha Krishna Daita, Vincent P. Drnevich, Daehyeon Kim

JTRP Technical Reports

Lime and Lime Kiln Dust (LKD) are widely used for modifying/stabilizing pavement subgrades. The addition of lime or LKD involves chemical processes that are dependent on many parameters. For natural subgrades, quality control is based on moisture and unit weight requirements using manual interpolations of one-point test data on a family of curves. For modified soils, moisture and unit weight measurements are insufficient for quality control and other tests must be considered. Various possible quality control methods for LKD-modified subgrades were evaluated. This research produced an Excel-based program to automate the generation of a family of curves and one-point data …


Shear Reinforcement Requirements For High-Strength Concrete Bridge Girders, J. A. Ramirez, Gerardo Aguilar Jan 2005

Shear Reinforcement Requirements For High-Strength Concrete Bridge Girders, J. A. Ramirez, Gerardo Aguilar

JTRP Technical Reports

A research program was conducted on the shear strength of high-strength concrete members. The objective was to evaluate the shear behavior and strength of concrete bridge members with compressive strengths in the range of 10 000 to 15 000 psi. The goal was to determine if the current minimum amount of shear reinforcement together with maximum spacing limits in the 2004 AASHTO LRFD Specifications, and the upper limit on the nominal shear strength were applicable to concrete compressive strengths up to 15 000 psi.

A total of twenty I-shaped specimens were tested monotonically to failure. Sixteen specimens were reinforced concrete …


An Assessment Of Highway Financing Needs In Indiana, Kumares C. Sinha, Samuel Labi, Stacey D. Hodge, Gabriel U. Tine, Hardik Rajendra Shah Jan 2005

An Assessment Of Highway Financing Needs In Indiana, Kumares C. Sinha, Samuel Labi, Stacey D. Hodge, Gabriel U. Tine, Hardik Rajendra Shah

JTRP Technical Reports

In recent years highway revenues in Indiana have been eroding due to inflation, increased costs, and the increased use of fuel-efficient vehicles. It is necessary, therefore, to reliably assess the current and future needs for highway funding in order to facilitate informed fiscal planning. This study provides a methodology for tracking current and future demand for highway financing, along with a systematic modeling approach for revenue projections such that financing plans can be developed for state and local highway networks. Highway infrastructure needs for pavements, bridges, safety, and capacity improvements for the 15-year period between 2006 and 2020 are assessed …


Comparison Of Various Indot Testing Methods And Procedures To Quantify Variability In Measured Bituminous And Concrete Properties, Terhi K. Pellinen, W. Jason Weiss, Thomas Kuczek, Geoffrey Dauksas Jan 2005

Comparison Of Various Indot Testing Methods And Procedures To Quantify Variability In Measured Bituminous And Concrete Properties, Terhi K. Pellinen, W. Jason Weiss, Thomas Kuczek, Geoffrey Dauksas

JTRP Technical Reports

This study was designed to analyze the variability associated with several test procedures used by the Indiana Department of Transportation (INDOT) in their Hot Mix Asphalt (HMA), portland cement concrete pavement (PCCP), and superstructure concrete protocols. The aim of this work was to document the variability associated with each of these test procedures toward application of this information of the development of acceptance criteria, pay factors, and pay incentives and disincentives. The studied parameters for HMA production included the air void content and VMA of the gyratory compacted mixture, in-place density, binder (asphalt) content, aggregate bulk specific gravity and water …


Life Cycle Cost Analysis For Indot Pavement Design Procedures, Geoffery Lamptey, Muhammad Z. Ahmad, Samuel Labi, Kumares C. Sinha Jan 2005

Life Cycle Cost Analysis For Indot Pavement Design Procedures, Geoffery Lamptey, Muhammad Z. Ahmad, Samuel Labi, Kumares C. Sinha

JTRP Technical Reports

Given the aging of highway pavements, high traffic levels, and uncertainty of sustained preservation funding, there is a need for balanced decision-making tools such as LCCA to ensure long-term and cost-effective pavement investments. With driving forces such as ISTEA 1991, the NHS Act of 1995, and TEA-21, LCCA enables evaluation of overall long-term economic efficiency between competing alternative investments and consequently has important applications in pavement design and management. It has been shown in past research that more effective long-term pavement investment could be made at lower cost using LCCA. Current LCCA-based pavement design and preservation practice in Indiana could …


Emergency Earthquake Routes; Part I, Criteria For Selection Of Primary Routes; And Part Ii: Route Seismic Vulnerability Aspects, Julio Ramirez, Srinivas Peeta, Mete Sozen, Luis Garcia, Kannan Viswanath Jan 2005

Emergency Earthquake Routes; Part I, Criteria For Selection Of Primary Routes; And Part Ii: Route Seismic Vulnerability Aspects, Julio Ramirez, Srinivas Peeta, Mete Sozen, Luis Garcia, Kannan Viswanath

JTRP Technical Reports

The occurrence of a strong earthquake in Indiana or neighboring states, as has occurred in the past, has serious implications for the State Transportation System with respect to adequate response. The definition of Earthquake Emergency Routes for the State of Indiana became a priority for the Indiana Department of Transportation. These Emergency Routes take into account various aspects related to transportation including coverage of population and area and travel time along these routes, and issues related to structural and geotechnical seismic vulnerability of the roads and bridges along these routes. Part I of the overall study report formulates a multi-commodity …


Non-Destructive Estimation Of Pavement Thickness, Structural Number And Subgrade Resilience Along Indot Highways, Samy Noureldin, Karen Zhu, Dwayne Authur Harris, Shuo Li Jan 2005

Non-Destructive Estimation Of Pavement Thickness, Structural Number And Subgrade Resilience Along Indot Highways, Samy Noureldin, Karen Zhu, Dwayne Authur Harris, Shuo Li

JTRP Technical Reports

Nondestructive testing has become an integral part for evaluation and rehabilitation strategies of pavements in recent years. Pavement evaluation employing the Falling Weight Deflectometer (FWD) and the Ground Penetrating Radar (GPR) can provide valuable information about pavement performance characteristics and be a very useful tool for project prioritization purposes and estimation of construction budget at the network level. FWD deflection testing is an accurate tool for determining pavement structural capacity and estimating the required thickness of overlays and hence is an accurate tool for planning for or estimating required current and future construction budgets. GPR is the only tool that …


Procedures For The Estimation Of Pavement And Bridge Preservation Costs For Fiscal Planning And Programming, Kumares C. Sinha, Samuel Labi, Marcela Rodriguez, Gabriel U. Tine, Rucci Dutta Jan 2005

Procedures For The Estimation Of Pavement And Bridge Preservation Costs For Fiscal Planning And Programming, Kumares C. Sinha, Samuel Labi, Marcela Rodriguez, Gabriel U. Tine, Rucci Dutta

JTRP Technical Reports

Facility preservation generally refers to the set of activities that are carried out to keep a facility in usable condition until the next reconstruction activity. For fiscal planning and programming, it is necessary to know the expected costs of preservation projects and how long they would last. Such information, coupled with minimum standards and facility inventory data enable estimation of overall monetary needs for bridge and pavement preservation, and would assist INDOT in undertaking appropriate programming and attendant financial planning over the long term. However, detailed engineering analyses are not possible every year because of the time and effort involved, …


Its Strategies For Minimization Of Fine Particulates, Ahmed S. Soliman, Robert Bertram Jacko, Barry K. Partridge Jan 2005

Its Strategies For Minimization Of Fine Particulates, Ahmed S. Soliman, Robert Bertram Jacko, Barry K. Partridge

JTRP Technical Reports

The purpose of the study was to quantify the impact of traffic conditions such as free flow and congestion on local air quality. The Borman Expressway in Northwest Indiana is considered a test-bed for this research due to the high volume of class-9-truck traffic traveling on it, as well as the existing and continuing installation of the Intelligent Transportation System (ITS) to improve the traffic management along the highway stretch. An empirical Traffic-Air-Quality model (TAQ model) was developed to estimate the PM2.5 emission factors (g/mi) based solely on the measured traffic parameters such as average speed, average acceleration and truck …


Damage Analysis Of Jointed Plain Concrete Pavements In Indiana, Part I: Finite Element Modeling And Damage Analysis, Part Ii: Indislab, A Software Tool For Jointed Plain Concrete Pavement Design, Elisa D. Sotelino, Alireza Asgari, Andrew C. Saksa, Guillermo Cedeno Jan 2005

Damage Analysis Of Jointed Plain Concrete Pavements In Indiana, Part I: Finite Element Modeling And Damage Analysis, Part Ii: Indislab, A Software Tool For Jointed Plain Concrete Pavement Design, Elisa D. Sotelino, Alireza Asgari, Andrew C. Saksa, Guillermo Cedeno

JTRP Technical Reports

Current design procedures for concrete pavements do not account for several factors that can influence their service life. In this work, these factors are investigated and the findings are integrated into a procedure for better predicting longterm performance of concrete pavements. To achieve this, sophisticated finite element techniques are employed and parametric studies are performed. The findings are then integrated into a nonlinear procedure for damage accumulation. In the development of the comprehensive 3D Finite Element (FE) model several issues are studied including the geometry of the model, mesh refinement, element selection, interaction between pavement components, and loading simulation. The …