Open Access. Powered by Scholars. Published by Universities.®
- Keyword
Articles 1 - 2 of 2
Full-Text Articles in Other Business
Partial Budgeting Analysis Of Conventional Pump Over Versus Pulsair Cap Management System For A Large–Scale California Winery, Zachary Thomas Hicks
Partial Budgeting Analysis Of Conventional Pump Over Versus Pulsair Cap Management System For A Large–Scale California Winery, Zachary Thomas Hicks
Agribusiness
The purpose of this project was to evaluate the financial feasibility of implementing an automated gas injection system from Pulsair as an alternative to the traditional pump over cap mixing technique that is used during the alcoholic fermentation stage of winemaking.
There were various costs involved in this project that were determined and explained through the use of the partial budgeting method. The costs that were thoroughly analyzed included equipment, labor, utility, and initial investment costs for the Pulsair system as well as the related pump over operation costs. After the two methods associated numbers were evaluated, they were then …
Gerber Project For Lockheed Martin, Andrew Callahan, Sean Lawyer
Gerber Project For Lockheed Martin, Andrew Callahan, Sean Lawyer
Industrial Technology and Packaging
Lockheed Martin, the world’s premier aerial combat vehicle manufacturer was pressed to find an eco-friendly way to package their impregnated epoxy. In the current system, the epoxy would be cut on the Gerber table to a pre-determined length and then sandwiched inside of two corrugated fiberboard sheets for storage inside of a freezer. The current process was not only labor intensive, but the corrugated fiberboard had to be disregarded after one use. In conjunction with the Cal Poly San Luis Obispo Packaging program and Melmat Incorporated, we were able to find a corrugated plastic substrate to replace the currently non-reusable …