Open Access. Powered by Scholars. Published by Universities.®

Business Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 18 of 18

Full-Text Articles in Business

Slides: Adapting To Climate Change: Lessons Learnt From The Australian Water Experience, Will Fargher Feb 2011

Slides: Adapting To Climate Change: Lessons Learnt From The Australian Water Experience, Will Fargher

Conversation with Water Management Reps from Colorado and Australia: "Adapting to Climate Change: Lessons Learned from Australia" (February 14)

Presenter: Will Fargher, National Water Commission, Australian Government

18 slides [4 have titles only and are missing images]


Slides: Environmental Water In Australia, Chris Arnott Feb 2011

Slides: Environmental Water In Australia, Chris Arnott

Conversation with Water Management Reps from Colorado and Australia: "Adapting to Climate Change: Lessons Learned from Australia" (February 14)

Presenter: Chris Arnott, Managing Director, Alluvium Consulting

30 slides


Agenda: Western Water: Expanding Uses/Finite Supplies, University Of Colorado Boulder. Natural Resources Law Center Jun 1986

Agenda: Western Water: Expanding Uses/Finite Supplies, University Of Colorado Boulder. Natural Resources Law Center

Western Water: Expanding Uses/Finite Supplies (Summer Conference, June 2-4)

Conference organizers and/or faculty included University of Colorado School of Law professors James N. Corbridge, Jr., Lawrence J. MacDonnell and David H. Getches.

This conference featured luncheon talks by Colorado Governor Richard D. Lamm and Undersecretary of the Department of the Interior Ann McLaughlin. The conference attracted 115 registrants from 19 states plus the District of Columbia.


Innovative Transfer And Exchange Plans, Glenn E. Porzak Oct 1985

Innovative Transfer And Exchange Plans, Glenn E. Porzak

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

36 pages (includes maps).

Contains footnotes (page 32).


Interstate Transfers Of Water: Many A Slip ‘Twixt The Cup And The Lip, Howard Holme Oct 1985

Interstate Transfers Of Water: Many A Slip ‘Twixt The Cup And The Lip, Howard Holme

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

44 pages (includes maps and tables).

Contains 6 pages of footnotes.


Engineering And Hydrologic Issues In Changing Water Uses, Leonard Rice Oct 1985

Engineering And Hydrologic Issues In Changing Water Uses, Leonard Rice

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

26 pages (includes maps, charts and illustrations).

Contains references (page 18).


Voluntary Approaches To Basinwide Water Management, Neil S. Grigg Oct 1985

Voluntary Approaches To Basinwide Water Management, Neil S. Grigg

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

13 pages (includes illustration).

Contains references (page 11).


Factors Affecting Colorado’S Water Future: Summary Of Results Of Survey Conducted April 1985, Lawrence J. Macdonnell Oct 1985

Factors Affecting Colorado’S Water Future: Summary Of Results Of Survey Conducted April 1985, Lawrence J. Macdonnell

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

7 pages.


Nontributary Ground Water: A Continuing Dilemma, William A. Paddock Oct 1985

Nontributary Ground Water: A Continuing Dilemma, William A. Paddock

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

47 pages.

Contains 2 pages of footnotes.


Wasted Water: The Problems And Promise Of Improving Efficiency Under Western Water Law, Steven J. Shupe Oct 1985

Wasted Water: The Problems And Promise Of Improving Efficiency Under Western Water Law, Steven J. Shupe

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

61 pages.

Includes footnotes (pages 49-56).


Administering Colorado’S Water: A Critique Of The Present Approach, Clyde O. Martz, Bennett W. Raley Oct 1985

Administering Colorado’S Water: A Critique Of The Present Approach, Clyde O. Martz, Bennett W. Raley

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

41 pages.

Contains footnotes.


Agenda: Colorado Water Issues And Options: The 90'S And Beyond: Toward Maximum Beneficial Use Of Colorado's Water Resources, University Of Colorado Boulder. Natural Resources Law Center, Colorado Water Resources Research Institute. Cooperative Extension Service Oct 1985

Agenda: Colorado Water Issues And Options: The 90'S And Beyond: Toward Maximum Beneficial Use Of Colorado's Water Resources, University Of Colorado Boulder. Natural Resources Law Center, Colorado Water Resources Research Institute. Cooperative Extension Service

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

Presented by Natural Resources Law Center, University of Colorado School of Law and Cooperative Extension Service, Colorado Water Resources Research Institute, Colorado State University.

Conference organizers and/or speakers included University of Colorado School of Law professors Lawrence J. MacDonnell, David H. Getches and Stephen F. Williams.

The conference theme is "Toward Maximum Beneficial Use of Colorado's Water Resources." The purpose of the conference is to provide a forum for public discussion of Colorado's system of water law and administration and to make recommendations for future action.


Meeting Colorado’S Water Requirements: An Overview Of The Issues, David H. Getches Oct 1985

Meeting Colorado’S Water Requirements: An Overview Of The Issues, David H. Getches

Colorado Water Issues and Options: The 90's and Beyond: Toward Maximum Beneficial Use of Colorado's Water Resources (October 8)

43 pages (includes tables and map).

Includes 3 pages of footnotes.


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …