Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons™

Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering and Management

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 241 - 270 of 944

Full-Text Articles in Architecture

Minority And Female Participation In Construction Industry Apprenticeship Programs, Richard Bruce, Aaron Sauer, Patrick Sells, Curtis Bradford Sep 2021

Minority And Female Participation In Construction Industry Apprenticeship Programs, Richard Bruce, Aaron Sauer, Patrick Sells, Curtis Bradford

The Professional Constructor

According to the U.S. Bureau of Labor Statistic’s Current Population Survey, nearly 90 percent of the 10.7 million people employed in the construction industry are white males (2021). This statistic will remain unchanged unless more minorities and females are recruited into the industry. For craft workers, a primary recruitment mechanism is the registered apprenticeship program. This study analyzes the U.S. Department of Labor’s Registered Apprenticeship Database (RAPIDs) from 2000 to 2019 to identify trends for new apprentices. The study found that there was no change in the proportion of new female apprentices in the previous 20 years and no change …


Building Services Engineering September/October 2021 Sep 2021

Building Services Engineering September/October 2021

Building Services Engineering

No abstract provided.


Digital Construction And Bim Research In Ireland 2016-2020, Barry Mcauley, Roger P. West, Alan V. Hore Aug 2021

Digital Construction And Bim Research In Ireland 2016-2020, Barry Mcauley, Roger P. West, Alan V. Hore

Conference papers

As the construction industry opens up post pandemic, new and significant challenges will demand considerable expertise, not least in financial viability, solving the housing crisis and facing the very significant climate change pressures to make the industry less wasteful and less carbon intensive. This presents an excellent opportunity to further inculcate aspects of lean construction, particularly BIM into many aspects of construction not traditionally associated with digital construction, provided the necessary expertise is available and known to exist. Following a well-received recent conference paper summarising BIM-related research published by academics in Ireland’s higher education institutions in 2020, this paper will …


Reasons And Remedies To The Dying Plant Walls, Hayley Q. Mcgough Aug 2021

Reasons And Remedies To The Dying Plant Walls, Hayley Q. Mcgough

Construction Management

Sustainability in construction has been increasingly popular and detrimental with the state of the planet and climate change. One of the more popular solutions is the addition of plant façades to a building, which are plants that are put on the vertical of a building. The benefits that come with plant facades include and are not limited to: Reduction of the urban heat island effect, improved air quality, local job creation, improved energy efficiency, building structure protection, noise reduction, increased biodiversity, urban agriculture. These benefits are not reaching their full potential because these plant façades keep dying creating a bigger …


Single-Family Residential Flood Loss Reduction Through Freeboard, Ehab Said Gnan Jul 2021

Single-Family Residential Flood Loss Reduction Through Freeboard, Ehab Said Gnan

LSU Doctoral Dissertations

The lack of flood loss estimation methods conducted on a micro-scale level that consider the full loss‐exceedance probabilities curve poses a significant problem in flood risk assessment. Also, the lack of robust benefit-cost analysis (BCA) that quantifies benefits at the micro-scale level leads to sub-optimal results, and therefore sub-optimal decisions when determining the optimal freeboard. Further, flood loss assessments focus on owner-occupied housing and neglect rental housing. These loss assessment deficiencies underscore the need for a robust assessment that quantifies the life-cycle benefits for all stakeholders and provides actionable information to enable informed decisions.

This research presents a comprehensive methodology …


Propositions For A Resilient, Post-Covid-19 Future For The Aec Industry, Hala Nassereddine, Kyung Wook Seo, Zofia K. Rybkowski, Christian Schranz, Harald Urban Jul 2021

Propositions For A Resilient, Post-Covid-19 Future For The Aec Industry, Hala Nassereddine, Kyung Wook Seo, Zofia K. Rybkowski, Christian Schranz, Harald Urban

Civil Engineering Faculty Publications

The coronavirus outbreak has challenged and continues to challenge every aspect of the supply chain within the AEC industry, forcing stakeholders to cope with increasing uncertainties and continuous change. The notion of resilience is especially salient now. While the need for the AEC industry to focus on resilience has been highlighted in recent articles, there is a need for a comprehensive discussion on what resilience means for the AEC industry and how companies can create built-in resilience. This paper takes the form of a high-level overview of where the industry is headed and aims to establish eleven propositions for a …


Building Services Engineering July/August 2021 Jul 2021

Building Services Engineering July/August 2021

Building Services Engineering

No abstract provided.


Assessment Of Carbon Dioxide Emission And Its Impact On High-Rise Mixed-Use Buildings In Egypt, Ahmed Salah Hamza Jun 2021

Assessment Of Carbon Dioxide Emission And Its Impact On High-Rise Mixed-Use Buildings In Egypt, Ahmed Salah Hamza

Theses and Dissertations

With Egypt's vision of 2030 focusing on sustainable development with a true emphasis on Carbon Dioxide (CO2) emission reduction in the newly built cities and high-rise buildings, efforts are exerted on various levels towards accomplishing the vision’s goals. This is achieved through multiple tools and models associated with aiding the reduction of carbon emissions, yet not a clear one was introduced for the mixed-use buildings in Egypt.

Through this work, a significant gap was identified with respect to high-rise buildings carbon emission assessment in Egypt. This was a main driving force for this work in an attempt to …


Journeyman International: Haiti Hac Innovation Center In Croix Des Bouquets, Brent K. Underwood Jun 2021

Journeyman International: Haiti Hac Innovation Center In Croix Des Bouquets, Brent K. Underwood

Construction Management

The purpose of this project was to create and provide the necessary pre-construction documents for a multi-purpose building in Croix des Bouquets, Haiti. This project aims to give occupants a new space to work freely in as it will be equipped with the essential needs. The rooms to be included within this building are offices, meeting rooms, general spaces, a workshop and computer lab – all of which will give the occupants the ability to work in an innovative environment. The project is overseen by three organizations. These groups are Journeyman International (JI), the Haitian American Caucus (HAC), and Third …


The Leed Decision-Making Processes For Northern California Commercial Construction, Shannon Marie Coyle Jun 2021

The Leed Decision-Making Processes For Northern California Commercial Construction, Shannon Marie Coyle

Construction Management

The purpose of this project was to establish a common decision-making process behind selections on the Leadership in Energy and Environmental Design (LEED) scorecard. This report describes the similar and dissimilar motives and processes that lead construction project teams to choose the LEED credits to be implemented. By interviewing experienced project executives, architects, project managers, and LEED accredited professionals at industry-leading companies in the Bay Area, a summarization of the motives behind credit selection have been reported and commonalities and differences in the process have been noted. Through these interviews, time, cost, efficiency, and sensibility have all been considered prioritizing …


Outsourcing Vdc Workflows, Kyle K. Bresnahan Jun 2021

Outsourcing Vdc Workflows, Kyle K. Bresnahan

Construction Management

In an increasingly demanding world for infrastructure, technological methods have been found to assist construction project's. As innovative construction methods are constantly increasing, so is the demand for technological needs within the architecture, engineering, and construction (AEC) industry. To ensure technological adoption, many countries have started to mandate higher levels of building information modeling (BIM) documentation beyond the 2D construction documents traditionally required throughout construction review and permitting. Some companies have capitalized on this change to the extent of making BIM their primary business. These companies focus solely on virtual design and construction (VDC) and determine whether clients lacking this …


A Case Study On The Ucsf Transplant Center Renovation: Mitigating Covid-19 Risks And Tracking Cost Impact, Alec Steven Woodyatt Jun 2021

A Case Study On The Ucsf Transplant Center Renovation: Mitigating Covid-19 Risks And Tracking Cost Impact, Alec Steven Woodyatt

Construction Management

At the beginning of 2020, the world was turned upside down at the hands of the global coronavirus pandemic. Today, economies and business are counting the costs and wondering what recovery will look like – how to navigate and adapt to a new style of life after returning from government-mandated lockdowns. The question on everyone’s minds is, “how do we continue to work while keeping people safe?” This question is extremely relevant in the construction industry where, for most people, working from home is not an option. This case study will delve into how Dome Construction, along with their client, …


Computational Design Of Nonlinear Stress-Strain Of Isotropic Materials, Askhad M.Polatov, Akhmat M. Ikramov, Daniyarbek Razmukhamedov May 2021

Computational Design Of Nonlinear Stress-Strain Of Isotropic Materials, Askhad M.Polatov, Akhmat M. Ikramov, Daniyarbek Razmukhamedov

Chemical Technology, Control and Management

The article deals with the problems of numerical modeling of nonlinear physical processes of the stress-strain state of structural elements. An elastoplastic medium of a homogeneous solid material is investigated. The results of computational experiments on the study of the process of physically nonlinear deformation of isotropic elements of three-dimensional structures with a system of one- and double-periodic spherical cavities under uniaxial compression are presented. The influence and mutual influence of stress concentrators in the form of spherical cavities, vertically located two cavities and a horizontally located system of two cavities on the deformation of the structure are investigated. Numerical …


On The Computational Efficiency Of Les And Hybrid Rans-Les Models In Building Aerodynamics, Aly Mousaad Aly, Faiaz Khaled May 2021

On The Computational Efficiency Of Les And Hybrid Rans-Les Models In Building Aerodynamics, Aly Mousaad Aly, Faiaz Khaled

Faculty Publications

Large-eddy simulation (LES) has proven to offer superior accuracy in regards to predicting surface pressures compared to the Reynolds-averaged Navier Stokes (RANS) models. However, the primary impediment is the high computational cost associated with LES. The authors attempt to investigate the computational cost and accuracy by employing different sub-grid scale (SGS) models in LES and hybrid RANS-LES models. One of the prerequisites of accurate pressure estimations is to ensure a horizontally homogeneous empty computational domain. This study aims to compare the computational competence qualitatively and quantitatively using an empty domain in regards to the ability to maintain horizontal homogeneity. The …


On The Computational Efficiency Of Les And Hybrid Rans-Les Models In Building Aerodynamics, Faiaz Khaled, Aly Mousaad Aly May 2021

On The Computational Efficiency Of Les And Hybrid Rans-Les Models In Building Aerodynamics, Faiaz Khaled, Aly Mousaad Aly

Faculty Publications

No abstract provided.


Cm Member Of Slocoe Peace Conference Center Feasibility Study, Jackson Reynolds May 2021

Cm Member Of Slocoe Peace Conference Center Feasibility Study, Jackson Reynolds

Construction Management

This paper describes the parking design and estimate portion of a whole feasibility study conducted by an interdisciplinary team. The interdisciplinary team consisted of three senior undergraduate industrial engineering students, and one senior undergraduate construction management student. This feasibility study was conducted for the San Luis Obispo County Office of Education (SLOCOE) to determine if it is feasible to construct a new, 400-person conference center on a site in San Luis Obispo, CA. The complete study includes analyses of the following topics: economic, utilities, traffic/road, approval from Chumash Tribe, social/historical, climate, geological, vegetation and wildlife, noise and pollution, parking, mandatory …


Journeyman International: Canopy Life School, Housing & Training Complex In Kenya, Spencer P. Mishky May 2021

Journeyman International: Canopy Life School, Housing & Training Complex In Kenya, Spencer P. Mishky

Construction Management

The purpose of this project was to provide a master plan for a primary school complex in a rural village in Migori County, Kenya. This facility aims to eliminate any issues for students growing up in the area. The master plan includes a primary school, housing accommodations, a training center, and a dining hall to cultivate success through all stages of these children’s lives. The project is headed by a non-profit organization, Journeyman International in conjunction with Canopy Life International and Take Heart Africa. The project was interdisciplinary involving a construction manager, an architect, and two architectural engineers all working …


Building Services Engineering May/June 2021 May 2021

Building Services Engineering May/June 2021

Building Services Engineering

No abstract provided.


Facilitating The Industrial Sector's Adoption Of Collaborative Project Delivery Methods, Xavier Wood-Aliberch Apr 2021

Facilitating The Industrial Sector's Adoption Of Collaborative Project Delivery Methods, Xavier Wood-Aliberch

Durham School of Architectural Engineering and Construction: Dissertations, Theses, and Student Research

In an effort to improve outcomes in the civil and healthcare sectors, clients have adopted collaborative project delivery methods for the delivery of their capital projects. The success stories in these sectors have gathered the attention of clients in the industrial sector, where cost and schedule overruns have become the norm. The central objective of this thesis is to help clients make the transition to this new type of project delivery.

This thesis was written in a three-paper format, where each paper addresses a challenge with the adoption of collaborative delivery methods. The first paper investigates what type of industrial …


The Professional Constructor, Full Issue, Volume 46, Number 01 Apr 2021

The Professional Constructor, Full Issue, Volume 46, Number 01

The Professional Constructor

No abstract provided.


A Hermeneutic Phenomenological Study Into The Impact Of Bim On The Social Dynamics Of The Aec Professional In The Workplace., Malachy Mathews Dr. Mar 2021

A Hermeneutic Phenomenological Study Into The Impact Of Bim On The Social Dynamics Of The Aec Professional In The Workplace., Malachy Mathews Dr.

Doctoral

A review of the literature published surrounding new digital design and construction technologies and associated processes described within the Architecture, Engineering, and Construction (AEC) community as Building Information Modelling (BIM) or Virtual Design and Construction (VDC) reveals a gap in the theoretical understanding of the impact these technologies are having on professionals who work in this industry. The central aim of this research is to discover if there has been a shift in social dynamics as a result of the adoption of BIM in the workplace and, if there has been, to discuss the meaning of this for the industry …


How New, Innovative Technology Can Be Implemented To Combat The Construction Industry Labor Shortage, Noah David Jackson Mar 2021

How New, Innovative Technology Can Be Implemented To Combat The Construction Industry Labor Shortage, Noah David Jackson

The Professional Constructor

This essay addresses the construction industry’s need to compensate for the current and projected labor shortage through innovative technologies. In the first portion of this essay, three technologies that are most feasible for implementation – the Internet of Things (IoT), Drones, and Prefabrication – are detailed. The challenges faced are then discussed before the second major portion in which steps for implementation are outlined. These steps include forming partnerships, learning the process, communicating, training, implementing, and adapting and improving. The essay concludes with a discussion of how the AGC organization, and members within, can aid the industry in meeting this …


The Adaptative Construction Industry, Rhett Cox Mar 2021

The Adaptative Construction Industry, Rhett Cox

The Professional Constructor

The construction industry is an industry that always unites to find ways to solve problems. It is very complex and requires considerable organization, hard work, specific skills, and a whole lot of determination. In this paper, I will discuss three ways that the industry is making strides to make construction better and more efficient: (a) increased use of modular construction and prefabrication, (b) use of drones, and (c) Building Information Modeling (BIM) use. With the construction process becoming more and more complex, improving efficiency and safety has gained more attraction, especially when coping with fundamental issues such as labor shortage, …


How New, Innovative Technology And Project Execution Tools And Techniques Can Be Used To Improve The Construction Process (Including Safety And Efficiency), James L. Craig Mar 2021

How New, Innovative Technology And Project Execution Tools And Techniques Can Be Used To Improve The Construction Process (Including Safety And Efficiency), James L. Craig

The Professional Constructor

Humanity has often sought to utilize tools and technology to make working faster, more efficient, more comfortable, and more accurate. While humans may have started with stone tools, we have since developed complex and sophisticated mechanical and digital technologies. The construction industry has been utilizing construction technology and equipment for these same reasons for generations. While other industries have embraced the use of smart, autonomous technology and robotics, the construction industry has steadily fallen behind in this effort. In this paper, I will discuss current work using these tools and possible applications for future development.


The Impact Of Climate Change On Building Energy Demands And Mitigation Measures In Florida, Aiyin (Erin) Jiang Mar 2021

The Impact Of Climate Change On Building Energy Demands And Mitigation Measures In Florida, Aiyin (Erin) Jiang

The Professional Constructor

Tropical and subtropical parts of the world are projected to be the most vulnerable to the impact of climate change on building energy consumption demand. Few studies, however, focus on all four greenhouse emission scenarios defined by International Panel of Climate Change, which would be useful in assessing the energy demand challenges areas such as Florida. This study applies the most recognized climate change model downscaling approach, the morphing method, to investigate the impact of climate change on the commonly used commercial buildings in Florida’s climate zones under all four emission scenarios. It also analyzes the efficacy of various mitigation …


Frequency And Magnitude Of Cost Growth In Public Works Contracts, George Fulton, Panagiotis Mitropoulos Mar 2021

Frequency And Magnitude Of Cost Growth In Public Works Contracts, George Fulton, Panagiotis Mitropoulos

The Professional Constructor

Cost overruns are a persistent issue in the construction industry. This paper investigates factors that may drive cost growth on public works contracts. The study collected data on 1,043 public works projects completed over a three year period. The analysis examined the impact of four factors on cost overruns: (1) Project type, (2) Contract size, (3) Contract duration, and (4) Construction placement (value per day). The data were analyzed using a combination of basic descriptive statistics along with statistical hypothesis testing of means for various factors affecting cost growth. Cost growth was found to vary significantly by project type, contract …


Case Study Of Real-World Emissions Rates Verus Epaemission Standards For Motor Graders, Boshra Karimi, Phil Lewis Mar 2021

Case Study Of Real-World Emissions Rates Verus Epaemission Standards For Motor Graders, Boshra Karimi, Phil Lewis

The Professional Constructor

Using the Volkswagen emissions scandal as motivation, the purpose of this case study was to investigate whether or not heavy-duty diesel construction equipment exceeds EPA emissions standards for nonroad diesel engines. The equipment analyzed included four separate motor graders with EPA emissions standards Tier 0, Tier 1, Tier 2, and Tier 3 engines. The analysis was based on a dataset of real-world emissions rates collected from in-use equipment on actual jobsites. The results showed that mass per time emissions rates for hydrocarbons, carbon monoxide, nitrogen oxides, and particulate matter decreased as the EPA emissions standards became more stringent. Furthermore, there …


Understanding Sub-Contractor Selection Factors In Thebuilding Construction Industry For The Southeastern United States, Dhaval Gajjar, Cayla Anderson Mar 2021

Understanding Sub-Contractor Selection Factors In Thebuilding Construction Industry For The Southeastern United States, Dhaval Gajjar, Cayla Anderson

The Professional Constructor

The primary entities within building construction industry consists of the owner, the architect / engineer, and the general contractor, that ensure the success of any construction project. On a traditional project, the owner selects and contracts with the general contractor to construct a building designed by the architect. A considerable amount of research has been conducted to understand the owner’s selection factors to hire a qualified general contractor. However, the general contractor selected for the project seldom self-performs the entire construction of a building. The general contractor might self-perform some aspects of the actual building construction, but they will typically …


Indispensable Homes In Third World Countries: Constructing A Home In Tijuana, Mexico, Myles Hubers Mar 2021

Indispensable Homes In Third World Countries: Constructing A Home In Tijuana, Mexico, Myles Hubers

Construction Management

This project was created to explore a way in which poverty around the world could ultimately be reduced. The way in which this project intends to demonstrate a method used to reduce poverty is by building a home for a specific family in Tijuana, Mexico. In doing so, this home will act as a model home for a manual, comprised of steps that should be taken to construct similar homes throughout any third world country. The goal of this project is to highlight the importance of poverty in the world while also creating a buildable solution in order to reduce …


Residential Bathroom And Tile Shower Addition During Covid-19 Quarantine, Joseph Szillinsky Mar 2021

Residential Bathroom And Tile Shower Addition During Covid-19 Quarantine, Joseph Szillinsky

Construction Management

This paper outlines the design and construction of a new code compliant bathroom including: a low profile shower pan, ceramic-tile shower enclosure, and new plumbing piping and fixtures. One of the main objectives was to complete the new shower which would be easily accessible and maintenance free in order to support a local elderly couple. The selection of this project took place during the COVID-19 pandemic approximately nine months after California issued the first mandatory statewide Stay-at-Home Order. During the early design and development stages an opportunity to collaborate with a local trades-person was identified as well as the need …