Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network™

Open Access. Powered by Scholars. Published by Universities.®

Discipline
Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 38971 - 39000 of 1103344

Full-Text Articles in Entire DC Network

“Shihin Fr” Oil Lamps: Technology From Scratch, Yehoshua Dray, Ilana Gonen Aug 2025

“Shihin Fr” Oil Lamps: Technology From Scratch, Yehoshua Dray, Ilana Gonen

'Atiqot

Recent excavations at Shiḥin, near ancient Ẓippori (Sepphoris) in Lower Galilee (Isarel), have revealed evidence of a Roman-period ceramic oil-lamp production workshop. The findings include a pottery kiln, lamp molds and industrial waste, prompting a reevaluation of oil-lamp production technologies and introducing new research questions. These questions were explored through experimental archaeology aimed at reconstructing manufacturing methods. This article focuses on the production technology of the Shiḥin FR oil lamps, distinguished by their unique designs and limited production period (70–135 CE). These chalk-mold-designed lamps were examined through high-resolution 3D scanning, reverse engineering and experimental archaeological practices, including mold carving, lamp …


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2018, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2018, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2018. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2018_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2014, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2014, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2014. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2014_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2014, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2014, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2014 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2021, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2021, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2021 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2022, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2022, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2022 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2022, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2022, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2022. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2022_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2017, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2017, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2017. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2017_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2018, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2018, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2018. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2018_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2022, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2022, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2022. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2022_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2015, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2015, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2015 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2021. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2021_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2013, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2013, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2013 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2017, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2017, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2017 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2020, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Queued Utility-Scale Pv Sites Simulated As Single-Axis Tracking Systems In The U.S. Eastern Interconnection For Weather Year 2020, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Using 2020 weather data, we ran PySAM power production simulations for utility-scale PV sites in the U.S. Eastern Interconnection queue. Site IDs, capacities, and locations (counties) were extracted from Lawrence Berkeley National Laboratory's Queued Up: 2024 Edition dataset. No panel mount information was provided, so all sites were assumed to be the centers of the installation counties. See queued_site_metadata.csv file for individual site metadata


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2015, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2015, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2015. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2015_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2016, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2016, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2016. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2016_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2017, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2017, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2017. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2017_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2019, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2019, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2019. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2019_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2020. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2020_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2021, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2021. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2021_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2013, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2013, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2013. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2013_PV_existing_site_metadata.csv file for individual site metadata.


Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson Aug 2025

Hourly Simulated Power Production Data With No Snow Loss Model At Existing Utility-Scale Pv Sites (>5 Mw) In The U.S. Eastern Interconnection In 2020, Shelbie Wickett, Ana Dyreson

Simulated Solar Capacity Including Snow Cover in the Eastern U.S.

Project Summary: We ran PySAM power production simulations for utility-scale (>5 MW) PV sites located in the U.S. Eastern Interconnection in the year 2020. Site panel mounts (fixed-tilt or single-axis tracking), capacities, and locations (latitudes and longitudes) were extracted from Lawrence Berkeley National Laboratory's Utility-Scale Solar 2024 Edition dataset. See 2020_PV_existing_site_metadata.csv file for individual site metadata.


Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025), Emma Rott Aug 2025

Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Danicamtiv Reduces Myosin's Working Stroke But Activates The Thin Filament By Accelerating Actomyosin Attachment, Brent Scott, Lina Greenberg, Caterina Squarci, Kenneth S Campbell, Michael J Greenberg Aug 2025

Danicamtiv Reduces Myosin's Working Stroke But Activates The Thin Filament By Accelerating Actomyosin Attachment, Brent Scott, Lina Greenberg, Caterina Squarci, Kenneth S Campbell, Michael J Greenberg

2020-Current year OA Pubs

Heart failure is a leading cause of death worldwide, and even with current treatments, the 5-y transplant-free survival rate is only ~50 to 70%. As such, there is a need to develop new treatments for patients that improve survival and quality of life. Recently, there have been efforts to develop small molecules for heart failure that directly target components of the sarcomere, including cardiac myosin. Danicamtiv is one of these molecules; however, its direct effects on myosin's single molecule mechanics and kinetics are not well understood. Using optical trapping techniques, stopped flow transient kinetics, and in vitro reconstitution assays, we …


Mrna Vaccines Encoding Variant Forms Of Sm-Tsp-2 Confer Protective Immunity Against Schistosoma Mansoni, Athos Silva Oliveira, Sevan Alwan, Philip T Loverde, Ramiz Shaheed, Pranav Mandyam, Rakesh Adhikari, Peter Hotez, Maria Elena Bottazzi, Jeroen Pollet Aug 2025

Mrna Vaccines Encoding Variant Forms Of Sm-Tsp-2 Confer Protective Immunity Against Schistosoma Mansoni, Athos Silva Oliveira, Sevan Alwan, Philip T Loverde, Ramiz Shaheed, Pranav Mandyam, Rakesh Adhikari, Peter Hotez, Maria Elena Bottazzi, Jeroen Pollet

Faculty, Staff and Students Publications

Despite the global burden of helminth infections, no human vaccines have yet been licensed against these parasites. This study explored the development and evaluation of mRNA vaccine candidates targeting Schistosoma mansoni tetraspanin-2 (Sm-TSP-2), an antigen currently under evaluation as a protein vaccine. We designed constructs encoding either full-length Sm-TSP-2, or its large extracellular loop (EC2) domain in secretory, membrane-anchored, or cytosolic forms. In a murine challenge model, the secreted and membrane-anchored versions of Sm-TSP-2-EC2 induced the highest of antigen-specific antibody titers. These two construct designs, along with full-length Sm-TSP-2 mRNA, also significantly reduced adult worm …


August 26, 2025 Nagpra And Tribal Relations Committee Meeting Minutes, Bryan Morey Aug 2025

August 26, 2025 Nagpra And Tribal Relations Committee Meeting Minutes, Bryan Morey

University NAGPRA and Tribal Relations Committee

August 26, 2025 minutes for the WKU NAGPRA and Tribal Relations Committee meeting. Meeting conducted via Zoom.


2025 School Of Engineering Vision Award Winners Recognized, University Of Dayton Aug 2025

2025 School Of Engineering Vision Award Winners Recognized, University Of Dayton

Blog: The Dayton Engineer

The University of Dayton School of Engineering Vision Awards recognize the innovation, creativity, entrepreneurial thinking and outstanding performance of our faculty and staff for their work as it relates to our School's values of community, innovation, excellence, and engagement and service.


Understanding The Relationship Between The Crystal Structure Elastic-Plastic Properties Of Discrete-Molecule Organic-Inorganic Halide Perovskites, Jacob L. Hempel, Michael D. Wells, Sean Parkin, Yang Tse Cheng, Aron J. Huckaba Aug 2025

Understanding The Relationship Between The Crystal Structure Elastic-Plastic Properties Of Discrete-Molecule Organic-Inorganic Halide Perovskites, Jacob L. Hempel, Michael D. Wells, Sean Parkin, Yang Tse Cheng, Aron J. Huckaba

Chemistry Faculty Publications

Discrete-molecule hybrid perovskites with different organic and inorganic molecules can provide a wide array of tunable optoelectronic and piezoelectronic properties. In this study, we report the elastic modulus and hardness, obtained from instrumented indentation measurements, of three new and three known discrete-molecule single crystal halide metalates, with an aim towards understanding the relationship between their microstructure and mechanical properties. We find a correlation in the mechanical properties and the density of the crystal structure, as well as with the number of hydrogen bonding sites available on the organic cation. These two observations suggest that denser crystal structures with more hydrogen …


Physiological Modeling Of Multiphase Intra-Arterial Ct Angiography For Hepatic Embolization Therapy, John David Mayfield, Ghassan Elias El-Haddad, Jonathan Michael Ford Aug 2025

Physiological Modeling Of Multiphase Intra-Arterial Ct Angiography For Hepatic Embolization Therapy, John David Mayfield, Ghassan Elias El-Haddad, Jonathan Michael Ford

USF Patents

Systems and methods are provided herein for determining areas of low blood flow, low blood perfusion, suboptimal treatment perfusion, and/or likelihood of tumor recurrence. For example patient-specific methods are provided for identifying areas of low perfusion in an anatomy of interest (such as a vascular region). Angiography data corresponding to the anatomy of interest can be used to generate a modified three-dimensional (3D) model of the anatomy of interest, which represents a fluid flow system exhibiting variant flow patterns. The model can take into account patient-specific data to simulate physical characteristics of the fluid flow system. This provides for accurate …