Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Sciences

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 4981 - 5010 of 25037

Full-Text Articles in Entire DC Network

Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc. Nov 2022

Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Solid Media Management Program Plan (Dated August 1, 2022), Nikia Greene Nov 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Solid Media Management Program Plan (Dated August 1, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The Impact Of Policy Design On Willingness To Pay For Ecosystem Services From Prairie Strips, Karina Schoengold, Badri Khanal, Taro Mieno, Lisa Schulte Moore Nov 2022

The Impact Of Policy Design On Willingness To Pay For Ecosystem Services From Prairie Strips, Karina Schoengold, Badri Khanal, Taro Mieno, Lisa Schulte Moore

Cornhusker Economics

Ecosystem services from farmland conservation are public good benefits. The value of these benefits is primarily measured using methods that determine the willingness to pay (WTP) for those benefits. Prairie strips, a farmland conservation practice, provide ecosystem services such as improved water quality, soil health, and biodiversity (Schulte et al., 2017). The state of Iowa is a major corn producer and contributes significant amounts of nitrogen and phosphorous to the Gulf of Mexico (Alexander et al., 2008). The development of conventional agricultural systems has also resulted in a significant loss of biodiversity, including a dominant land cover of tallgrass prairie. …


Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump., Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene Nov 2022

2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Increased Aerosols Can Reverse Twomey Effect In Water Clouds Through Radiative Pathway, Pradeep Khatri, Tadahiro Hayasaka, Brent N. Holben, Ramesh P. Singh, Husi Letu, Sachchida N. Tripathi Nov 2022

Increased Aerosols Can Reverse Twomey Effect In Water Clouds Through Radiative Pathway, Pradeep Khatri, Tadahiro Hayasaka, Brent N. Holben, Ramesh P. Singh, Husi Letu, Sachchida N. Tripathi

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Aerosols play important roles in modulations of cloud properties and hydrological cycle by decreasing the size of cloud droplets with the increase of aerosols under the condition of fixed liquid water path, which is known as the first aerosol indirect effect or Twomey-effect or microphysical effect. Using high-quality aerosol data from surface observations and statistically decoupling the influence of meteorological factors, we show that highly loaded aerosols can counter this microphysical effect through the radiative effect to result both the decrease and increase of cloud droplet size depending on liquid water path in water clouds. The radiative effect due to …


2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Nikia Greene Nov 2022

2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Request For Information (Rfi) - 01 To The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene Nov 2022

Approval Letter For The Request For Information (Rfi) - 01 To The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Occurrence Characteristics And Ecological Risk Assessment Of Heavy Metals In Fly Ash Of Ningdong Energy Chemical Industry Base, Zhang Zhiguo, Tan Yuning, Hu Youbiao, Zheng Yonghong, Chen Denghong, Cai Weiqing, Li Yating, Lu Jiangwei Nov 2022

Occurrence Characteristics And Ecological Risk Assessment Of Heavy Metals In Fly Ash Of Ningdong Energy Chemical Industry Base, Zhang Zhiguo, Tan Yuning, Hu Youbiao, Zheng Yonghong, Chen Denghong, Cai Weiqing, Li Yating, Lu Jiangwei

Coal Geology & Exploration

In order to expand the resource utilization of fly ash, research was conducted based on the fly ash of Yuanyang Lake Power Plant in the Ningdong Energy Chemical Industry Base. Specifically, the physical and chemical properties of fly ash were characterized and analyzed by means of scanning electron microscope, energy spectrum analysis and X-ray diffraction. Besides, the total amount, effective state and content in different forms of Pb, Cr, Ni, Cu, Cd and As in fly ash were determined through acid digestion, DTPA extraction and 5-step Tessier sequential extraction. In addition, the ecological risk of heavy metals in fly ash …


Nexus Between Animal Welfare, Environment, And Sustainable Development: Resource Document, Wellbeing International Nov 2022

Nexus Between Animal Welfare, Environment, And Sustainable Development: Resource Document, Wellbeing International

Nexus – UNEP – Animal Welfare, Environment, Sustainable Development

This Resource Document has been developed to explore the Nexus (links) between Animal Welfare, the Environment, and Sustainable Development. The document includes relevant citations and reports addressing the topics encompassed by the Nexus. It will be maintained as a “living document” (subject to revision) in the WellBeing International Studies Repository. The original document and subsequent revisions will be kept in the Repository to provide a record of the changes.


Distribution Characteristics Of Trace Elements In Different Density Fractions Of High-Germanium Coal From Wulantuga, Inner Mongolia, China, Duan Piaopiao, Wang Wenfeng, Ma Mengya Nov 2022

Distribution Characteristics Of Trace Elements In Different Density Fractions Of High-Germanium Coal From Wulantuga, Inner Mongolia, China, Duan Piaopiao, Wang Wenfeng, Ma Mengya

Coal Geology & Exploration

The exploitation and utilization of critical metals in coal measures is of great significance to alleviate the shortage of strategic mineral resources in China. In addition to the critical metal germanium (Ge), the low-rank coal from Wulantuga Coal Mine of Shengli Coalfield in Inner Mongolia, China is enriched with the toxic elements Be, F, As, Hg, Sb and W. Considering the extraction and utilization of key metals and environmental protection, the coal in the study area must be washed. As shown in the previous study, flotation is relatively good for the removal of As, Sb and W inWulantuga coal, but …


Quantitative Experimental Study On Time-Varying Characteristics Of Bleeding Of Cement-Based Grouting Materials, Zhang Runqi, Xu Bin, Yin Shangxian, Li Shuxia, Chang Yongwang, Lian Huiqing, Cao Min Nov 2022

Quantitative Experimental Study On Time-Varying Characteristics Of Bleeding Of Cement-Based Grouting Materials, Zhang Runqi, Xu Bin, Yin Shangxian, Li Shuxia, Chang Yongwang, Lian Huiqing, Cao Min

Coal Geology & Exploration

Cement-based cementitious materials are the most common grouting materials for grouting engineering. This type of material has obvious water separation effect, and obtaining the quantitative formula of water separation thickness will be helpful to improve the calculation accuracy of slurry diffusion radius. By observing the water separation process of three admixtures, namely pyrophyllite powder (0%-35%), polyvinyl alcohol (0%-8%) and fly ash (0%-90%) in cement-based slurry, the water separating rate, stone formation rate, final water separation time and water separation thickness of the three admixtures were obtained. It is found that the water separation thickness of the slurry varies regularly with …


Bmfou Pilot Project Rfc - Request For Change, Pioneer Technical Services, Inc. Nov 2022

Bmfou Pilot Project Rfc - Request For Change, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Data-Driven State Estimation For Improved Wide Area Situational Awareness In Smart Grids, Md Jakir Hossain Nov 2022

Data-Driven State Estimation For Improved Wide Area Situational Awareness In Smart Grids, Md Jakir Hossain

USF Tampa Graduate Theses and Dissertations

Wide area situational awareness (WASA) in smart grids includes automatic monitoring, perception and detection of anomalies in these systems. The goal of WASA is to make smart grids aware of their physical and operational state for more effective operational decisions and control. As such, tracking the system's state or state estimation is one of the key objectives of WASA. The extensive integration of cyber elements into smart grids, such as large deployment of various monitoring and measurement devices, provides new opportunities to improve WASA. However, the tight coupling of power grids with cyber components introduces vulnerabilities to cyber and physical …


Drought‑Stricken U.S. States Have More Comprehensive Water‑Related Hazard Planning, Theresa Jedd, Kelly Smith Nov 2022

Drought‑Stricken U.S. States Have More Comprehensive Water‑Related Hazard Planning, Theresa Jedd, Kelly Smith

National Drought Mitigation Center: Faculty Publications

Despite the devastating impacts of droughts, the United States lacks a national drought plan. This leaves states to address droughts in water, hazard, and stand-alone plans which are designed to reduce drought vulnerability and to prepare government, industry, and society to cope with the impacts. Yet, there is limited empirical research that evaluates the comprehensiveness of these plans, specifically in terms of whether they include preparedness and mitigation measures or triggers for action and response. To fill this gap, this study’s first aim was to establish an evaluation framework based on principles from the drought mitigation literature. The study then …


Sea Level Rise Vulnerability Assessment For State Wildlife Areas Surrounding Humboldt Bay, Northern California, Robert M. Sullivan, Aldaron Laird, Brian Powell, Jeffrey K. Anderson Nov 2022

Sea Level Rise Vulnerability Assessment For State Wildlife Areas Surrounding Humboldt Bay, Northern California, Robert M. Sullivan, Aldaron Laird, Brian Powell, Jeffrey K. Anderson

Local Reports and Publications

Humboldt Bay has the highest rate of sea level rise (SLR) in California (47.2 cm/century). Due to compaction and tectonic subsidence, former tidelands and pastures behind dikes surrounding Humboldt Bay are lower in elevation than bay waters at high tide. Adaptation to future climate change and SLR requires that resource managers understand vulnerability and risk to each wildlife area at a local level, because adaptation to SLR is a risk-based management strategy against an uncertain future requiring site-specific solutions. We conducted a vulnerability assessment of the shoreline of three State wildlife areas surrounding Humboldt Bay: Elk River (ERWA), Fay Slough …


Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene Nov 2022

Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene Nov 2022

Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Climate Change Curricula In Alberta, Canada: An Intersectional Framing Analysis, Greg Lowan-Trudeau Nov 2022

Climate Change Curricula In Alberta, Canada: An Intersectional Framing Analysis, Greg Lowan-Trudeau

Northwest Journal of Teacher Education

This article is comprised of a climate change-focused framing analysis of proposed revisions to Alberta, Canada’s K-6 curriculum as an ideologically motivated manifestation of curricular epistemicide. Eisner’s three curricula—the explicit, implicit, and null—and scholarship related to intersectional climate and environmental justice, education, and communication provide the theoretical framework. This inquiry concludes with a critical discussion of and possible alternatives to the revised curriculum with further consideration of the implications for those involved with similar endeavours in other jurisdictions across Canada and around the world.


Implementing Just Climate Adaptation Policy: An Analysis Of Recognition, Framing, And Advocacy Coalitions In Boston, U.S.A., Jeffrey T. Malloy, Catherine Ashcraft, Paul Kirshen, Thomas G. Safford, Semra Aytur, Shannon H. Rogers Nov 2022

Implementing Just Climate Adaptation Policy: An Analysis Of Recognition, Framing, And Advocacy Coalitions In Boston, U.S.A., Jeffrey T. Malloy, Catherine Ashcraft, Paul Kirshen, Thomas G. Safford, Semra Aytur, Shannon H. Rogers

Faculty Publications

Cities face intersectional challenges implementing climate adaptation policy. This research contributes to scholarship dedicated to understanding how policy implementation affects socially vulnerable groups, with the overarching goal of promoting justice and equity in climate policy implementation. We apply a novel framework that integrates social justice theory and the advocacy coalition framework to incrementally assess just climate adaptation in Boston, Massachusetts in the United States. Boston made an ambitious commitment to address equity as part of its climate planning and implementation efforts. In this paper, we evaluate the first implementation stage over the period 2016–2019 during which Boston developed coastal resilience …


Coordinate The Five-Pool Functions Of Ecosystem And Build Strong National Ecological Infrastructures—Ecological Construction Ideology, Tasks And Goals In The New Developing Era Of China, Guirui Yu, Meng Yang, Tianxiang Hao Nov 2022

Coordinate The Five-Pool Functions Of Ecosystem And Build Strong National Ecological Infrastructures—Ecological Construction Ideology, Tasks And Goals In The New Developing Era Of China, Guirui Yu, Meng Yang, Tianxiang Hao

Bulletin of Chinese Academy of Sciences (Chinese Version)

No abstract provided.