Articles 2731 - 2760 of 3988

Full-Text Articles in Entire DC Network

Bs News Dec 2008

Bs News

Building Services Engineering

No abstract provided.


Hydrogen Production By Anaerobic Fermentation Using Agricultural And Food Processing Wastes Utilizing A Two-Stage Digestion System, Reese S. Thompson Dec 2008

Hydrogen Production By Anaerobic Fermentation Using Agricultural And Food Processing Wastes Utilizing A Two-Stage Digestion System, Reese S. Thompson

All Graduate Theses and Dissertations, Spring 1920 to Summer 2023

Hydrogen production by means of anaerobic fermentation was researched utilizing three different substrates. Synthetic wastewater, dairy manure, and cheese whey were combined together at different concentrations under batch anaerobic conditions to determine the optimal hydrogen producing potential and waste treatment of each. Cheese whey at a concentration of 55% was combined with dairy manure at a concentration of 45% to produce 1.53 liters of hydrogen per liter of substrate. These results are significant because the control, synthetic wastewater, which was a glucose-based substrate, produced less hydrogen, 1.34 liters per liter of substrate, than the mixture of cheese whey and dairy …


High-Performance Concrete Bridge Decks: A Fast-Track Implementation Study, Volume 1: Structural Behavior, Robert J. Frosch, Timothy S. Aldridge Dec 2008

High-Performance Concrete Bridge Decks: A Fast-Track Implementation Study, Volume 1: Structural Behavior, Robert J. Frosch, Timothy S. Aldridge

JTRP Technical Reports

Transverse cracking of concrete bridge decks is problematic in numerous states. Cracking has been identified in the negative and positive moment regions of bridges and can appear shortly after opening the structure to live loads. To improve the service life of the bridge deck as well as decrease maintenance costs, changes to current construction practices in Indiana are being considered. A typical bridge deck was instrumented which incorporated the following: increased reinforcement amounts, decreasing reinforcement spacing, and high-performance, low-shrinkage concrete. The low shrinkage concrete was achieved using a ternary concrete mix. The objective of this research was to determine the …


Fatigue Risks In The Connections Of Sign Support Structures: Phase 1, Christopher Foley, Baolin Wan, Mathew Weglarz, Matthew Hellenthal, Jordan Komp, Andrew Smith, Joseph Schmidt Dec 2008

Fatigue Risks In The Connections Of Sign Support Structures: Phase 1, Christopher Foley, Baolin Wan, Mathew Weglarz, Matthew Hellenthal, Jordan Komp, Andrew Smith, Joseph Schmidt

Transportation Reports with the Wisconsin Department of Transportation

Wisconsin sought to assess the risk of fatigue-induced fracture in its existing sign support structures designed before the latest AASHTO specifications that included fatigue design. A framework for assessing fatigue-induced fracture risk is developed and detailed synthesis of fatigue testing of connections is conducted. Statistical analysis of tests conducted since 1970 is made and models for characterizing uncertainty in the fatigue life of these connections are proposed. Recommendations regarding further fatigue testing (specimen configuration, number and stress range) are given. Statistical models for wind speed and direction are developed using historical records obtained through the National Climatic Data Center for …


Effect Of Initial Scarification And Overlay Treatment Timing On Chloride Concentrations In Concrete Bridge Decks, Curtis Daniel Nolan Nov 2008

Effect Of Initial Scarification And Overlay Treatment Timing On Chloride Concentrations In Concrete Bridge Decks, Curtis Daniel Nolan

Theses and Dissertations

Considering the pervasive presence of chlorides in concrete bridge decks, bridge engineers have a critical responsibility to perform proper and effective preventive maintenance and rehabilitation operations. Bridge engineers often perform scarification and overlay (SO) procedures on concrete bridge decks to minimize the corrosion of reinforcing steel due to chloride ingress. Given the need to develop guidelines for the initial timing of SO treatments, the specific objectives of this research were to collect information from several department of transportation (DOT) personnel about their SO procedures and, subsequently, to determine the recommended timing of initial SO procedures on concrete bridge decks for …


Hydrogen Absorption In Weldments Of Overlaid Claded Pressure Vessel, Ronnie Higuchi Rusli Nov 2008

Hydrogen Absorption In Weldments Of Overlaid Claded Pressure Vessel, Ronnie Higuchi Rusli

Makara Journal of Technology

Cracks was found in type 347 stainless steel internal attachment welds of a reactor for a high temperature, and high pressure hydrogen service. One of the possible causes of cracking is low cycle fatigue cracking induced by repetition of thermal stress to embrittled weld metal. Type 347 weld metal loses its ductility by presence of sigma phase and hydrogen.


Bs News Nov 2008

Bs News

Building Services Engineering

No abstract provided.


Computed Flexural Buckling Stress For Cold-Formed Stainless Steel Columns, Shin-Hua Lin, Chi-Ling Pan, Chih-Peng Yu Oct 2008

Computed Flexural Buckling Stress For Cold-Formed Stainless Steel Columns, Shin-Hua Lin, Chi-Ling Pan, Chih-Peng Yu

CCFSS Proceedings of International Specialty Conference on Cold-Formed Steel Structures (1971 - 2018)

No abstract provided.


An Update On Aisi Standards For Cold-Formed Steel Framing, Jay W. Larson Oct 2008

An Update On Aisi Standards For Cold-Formed Steel Framing, Jay W. Larson

CCFSS Proceedings of International Specialty Conference on Cold-Formed Steel Structures (1971 - 2018)

No abstract provided.


Effect Of Nitrification On Lead Corrosion In Chloraminated Distribution Systems, Michael Shade Sep 2008

Effect Of Nitrification On Lead Corrosion In Chloraminated Distribution Systems, Michael Shade

All Theses

Water treatment facilities have been shifting from using chlorination to chloramination as a primary disinfectant since 2004, when the EPA enacted the Disinfectants/Disinfection By-Products (D/DBP) Rule mandating the decrease of DBPs. After the switch to chloramination, an unexpected lead concentration increase was detected in the Washington, D. C., and Greenville, NC water systems. These increases may be associated with the switch from chlorination to chloramination. Decomposition of chloramines results in higher ammonia loading to drinking water distribution systems, which may increase nitrification. Nitrifying bacteria may facilitate lead corrosion via two mechanisms: use of nitrite or nitrate as an alternative electron …


Effect Of Steel Fiber On The Mechanical Properties Of Cement-Based Composites Containing Silica Fume, Wei-Ting Lin, Ran Huang, Chin-Lai Lee, Hui-Mi Hsu Sep 2008

Effect Of Steel Fiber On The Mechanical Properties Of Cement-Based Composites Containing Silica Fume, Wei-Ting Lin, Ran Huang, Chin-Lai Lee, Hui-Mi Hsu

Journal of Marine Science and Technology–Taiwan

An experimental program was carried out to evaluate the mechanical properties of cement-based composites. Test variables included water to cementitious ratio, dosage of silica fume and volume fraction of steel fiber. Compressive strength test, direct tensile strength test, splitting tensile strength test, abrasion resistance test and drop weight test were performed and the results were analyzed statistically. According to the results of this study, the designed direct tensile testing method was a suitable method to estimate the tensile strength of fiber cement-based composites. Addition of fibers provided better performance for the cement-based composites, while silica fume in the composites would …


Determining The Repair Ranking Of Existing Rc Bridges Using Multi-Pole Fuzzy Pattern Recognition Evaluation Method, Ming-Te Liang, Ting- Bang Chu, Wen-Hu Tsao, Chi-Jang Yeh Sep 2008

Determining The Repair Ranking Of Existing Rc Bridges Using Multi-Pole Fuzzy Pattern Recognition Evaluation Method, Ming-Te Liang, Ting- Bang Chu, Wen-Hu Tsao, Chi-Jang Yeh

Journal of Marine Science and Technology–Taiwan

This paper proposes a technique for determining the repair ranking of existing reinforced concrete (RC) bridges using the multi-pole fuzzy pattern recognition evaluation method. The differences between bridges and grades are expressed by weighted generalized weight distance. To find the optimal relative membership degree of an evaluated bridge attributed to any grade, the operative principle is that the sum of the square of weighted generalized weight distance is minimum. Based on this principle, the problem of extreme value is established by the objective function in connection with constraint condition. Using the Lagrangean method, the multi-pole fuzzy pattern recognition evaluation method …


A Comparative Analysis Of Greenroof Designs Including Depth Of Media, Drainage Layer Materials, And Pollution Control Mediaa, Martin Wanielista, Michael Hardin Sep 2008

A Comparative Analysis Of Greenroof Designs Including Depth Of Media, Drainage Layer Materials, And Pollution Control Mediaa, Martin Wanielista, Michael Hardin

BMP Trains Research and Publications

No abstract provided.


Cryptosporidium Outbreak (Water Treatment Failure): North Battleford, Saskatchewan, Spring 2001, Patrick B. Jameson, Yung-Tse Hung, Chin Y. Kuo, Paul A. Bosela Sep 2008

Cryptosporidium Outbreak (Water Treatment Failure): North Battleford, Saskatchewan, Spring 2001, Patrick B. Jameson, Yung-Tse Hung, Chin Y. Kuo, Paul A. Bosela

Civil and Environmental Engineering Faculty Publications

An outbreak of cryptosporidiosis occurred in the town of North Battleford, Saskatchewan, Canada in the spring of 2001. The outbreak left thousands of people sick including about 50 people hospitalized. The source of the outbreak was from the city's surface water treatment plant. The Sedimentation Contact Unit did not satisfactorily remove suspended solids from the source water, resulting in filter breakthrough. Contaminated water was released into the distribution system causing the outbreak. Communication breakdown and confusion exacerbated the situation, extending the duration of the outbreak. The outbreak prompted the province to change the way it regulated municipal utilities of water …


Stabilization Of A 30 M High Riverbank In Canada With Nails, Plates And Roots, Michael Fabius, Myint Win Bo, Bernardo Villegas Aug 2008

Stabilization Of A 30 M High Riverbank In Canada With Nails, Plates And Roots, Michael Fabius, Myint Win Bo, Bernardo Villegas

International Conference on Case Histories in Geotechnical Engineering

The natural river processes along a 30 m high riverbank of one of the largest tributaries to Lake Superior cause periodic landslides. After arresting toe erosion, local authorities needed to protect the infrastructure at the crest from further damage as the slope continued to flatten towards its long-term angle of repose. A long-term hazard management strategy was applied using the cautionary zone approach (CZA). Design criteria included a target safety factor, no construction impacts, no maintenance and a 75-year design life. The solution drew from 3 technologies: soil nails, laterally loaded piles and biotechnical stabilization. Steel nails, 35 mm diameter, …


Investigation And Repair Of A Leaking Earthfill Dam, Erik J. Nelson Aug 2008

Investigation And Repair Of A Leaking Earthfill Dam, Erik J. Nelson

International Conference on Case Histories in Geotechnical Engineering

This paper presents a description of the investigation performed on two leaking earthfill dams and the remedial measures undertaken to repair the dams. The dams are located at a large nursery operation that collects and stores excess irrigation water and storm water in five large on-site reservoirs. The both dams were built in 2001 and 2002 to increase the nursery’s storage capacity by 40 percent. In June 2004 water was found leaking into the outlet pipe in one of the dams through the joints and around the outside of the outlet pipe at the toe of the dam. Geosyntec was …


Deterioration Of Bored Cast In Situ Piles Due To Aggressive Water, V. T. Ganpule, S. Y. Mhaiskar Aug 2008

Deterioration Of Bored Cast In Situ Piles Due To Aggressive Water, V. T. Ganpule, S. Y. Mhaiskar

International Conference on Case Histories in Geotechnical Engineering

Most of the data available from the cement industry and the literature exhibits performance of concrete cubes cured in normal water. Even the literature related to the durability of concrete deals mostly with concrete cured in normal water (closer to potable water in characteristics). However, the bored-cast-in-situ piles are cured in the ground water. The development of strength of concrete of bored cast-in-situ piles depends upon the quality of ground water. The effect of sulphates and chloride is well established and most of the codes stipulate permissible limits of pH, sulphates and chlorides contents in the ground water. In the …


A Historical Perspective On Geotechnical Case Histories Courses, J. David Rogers Aug 2008

A Historical Perspective On Geotechnical Case Histories Courses, J. David Rogers

International Conference on Case Histories in Geotechnical Engineering

Ralph Peck introduced the concept of using a geotechnical case histories course to teach students problem solving and technical communications skills, beginning around 1956. This course was developed as a professional practice course at the graduate level, intended for civil engineers of diverse backgrounds as well as geoscientists. Students were required to prepare one-page summaries of each case history profiled in the course, a requirement that left an enormous impression on the students. A different approach was employed by the University of California, Berkeley, beginning around 1970. Berkeley offered two graduate courses in the mold of ABET “capstone courses,” graduate …


Stabilization Of Gantry Column Foundation By Soil Nailing, Meenal Gosavi, Satyendra Mittal, Swami Saran Aug 2008

Stabilization Of Gantry Column Foundation By Soil Nailing, Meenal Gosavi, Satyendra Mittal, Swami Saran

International Conference on Case Histories in Geotechnical Engineering

Soil nailing can be used for retaining both temporary and permanent excavations. One of the successful applications of this technique includes the Singapore expressway project (Raju, 1996). As a part of this research work, one project of soil nailing has been completed in M/s Hero Cycles Industries, Ludhiana, India, where nailing has been used for stabilization of steel columns footings, meant for electrically operated gantry crane. Construction details and numerical analysis of nailed cut is described in this paper. KEYWORDS: Driven nails, foundation stabilization, nailed cut, pull-out tests, shotcreting.


Structural Response Of Frp Reinforced Concrete Softeyes For Tunnel Excavation, Fabio Matta, Antonio Nanni Aug 2008

Structural Response Of Frp Reinforced Concrete Softeyes For Tunnel Excavation, Fabio Matta, Antonio Nanni

International Conference on Case Histories in Geotechnical Engineering

The development of pultruded glass fiber reinforced polymer (GFRP) bars for internal reinforcement of concrete, together with dedicated limit-state design guidelines, has led to a recent breakthrough in the field of tunnel excavation. The use of GFRP bars in softeyes, which are openings of retaining walls to be penetrated by tunnel boring machines (TBMs) during excavation, is becoming mainstream. The low shear strength and brittleness compared to steel bars facilitate and expedite excavation, resulting in time and cost saving, as well as improved safety. Large-size (#10) GFRP bars are typically used as flexural reinforcement for the massive softeyes, often in …


The Selection Of An Earth Retention System At The Boston's Central Artery/Tunnel Project, Shahriyar Mojahed, Mark French Aug 2008

The Selection Of An Earth Retention System At The Boston's Central Artery/Tunnel Project, Shahriyar Mojahed, Mark French

International Conference on Case Histories in Geotechnical Engineering

The Central Artery/Tunnel (CA/T) Project also known as "Big Dig" has been the largest public work ever attempted in the American history. The selection of an appropriate earth retaining system for elimination of ground movement and preservation of adjacent structures was a key constructability challenge for construction practitioners at the CA/T. This paper explains the critical factors which had an effect on the selection of the Soldier Pile-Tremie Concrete (SPTC) slurry walls at the project. The advantageous of this system has been illustrated for other projects that face similar challenging conditions.


Geological Alterations And Chemical Treatment Of A Polluted Limestone Foundation, B. M. Al-Khailany, R. R. Al-Omari, W. F. Sagman Aug 2008

Geological Alterations And Chemical Treatment Of A Polluted Limestone Foundation, B. M. Al-Khailany, R. R. Al-Omari, W. F. Sagman

International Conference on Case Histories in Geotechnical Engineering

A large factory for the production of concentrated sulphuric acid is constructed in 1977 and located in the west of Iraq near Al-Kaim city. The footings carrying the installations rest on calcareous rocks which extend deep into the ground. For many years, about 1.5 tons per day of acid seeped and percolated into the ground apart from frequent accidents when larger amounts took their path down into the ground. A record of the footings movement revealed that the footings experienced significant heave and settlement indicating a cyclic movement which depends on the frequency of seepage. The results of the past …


Improvement Characteristics Of Ground Using C.G.S Through Field Case Study, Byung-Sik Chun, Duk-Hum Park, Jong-Nam Do, Yong-Goo Jang Aug 2008

Improvement Characteristics Of Ground Using C.G.S Through Field Case Study, Byung-Sik Chun, Duk-Hum Park, Jong-Nam Do, Yong-Goo Jang

International Conference on Case Histories in Geotechnical Engineering

Compaction Grouting System is widely used in densifying loose soils or fill voids caused by sinkholes, poorly compacted fills, and soft ground improvement. Also, it is used in preventing liquefaction, re-leveling settled structures, and using compaction bulbs as structural elements of minipiles or underpinning. But the effects of ground improvement depending on the type of soil must be studied in order to adopt in various soils. In this study, characteristics analysis of the ground improvement and the effectiveness of reinforcement were grasped by this study which shows applied ground by Compaction Grouting System in domestic 6 sites. After Compaction Grouting, …


Educating Students Through Understanding The Pathology Of Geotechnical Projects, Mohamed Djebbi, Mounir Bouassida Aug 2008

Educating Students Through Understanding The Pathology Of Geotechnical Projects, Mohamed Djebbi, Mounir Bouassida

International Conference on Case Histories in Geotechnical Engineering

Three projects of end of studies which are related to soil mechanics pathology case histories were undertaken by students at civil engineering department of National Engineering School of Tunis. The two first projects dealt with Joumine and Sidi Saâd earth dams cases. For Joumine dam, concrete slabs of the spillway have been affected by serious disorders. The first disorder is related to the swelling nature of soil foundation of concrete slabs. The second disorder is attributed to high excess pore pressure responsible of slabs up risings. As solution the jet grouting technique was designed to eliminate high pore pressure in …


Emerging Innovative Solutions Enhancing Practical Geotechnical Engineering, Shubhada S. Jagtap, Annapurni Iyer, Minimol Korulla Aug 2008

Emerging Innovative Solutions Enhancing Practical Geotechnical Engineering, Shubhada S. Jagtap, Annapurni Iyer, Minimol Korulla

International Conference on Case Histories in Geotechnical Engineering

This paper presents two case histories, wherein double twisted hexagonal wire mesh crates and netting were used as a solution for geotechnical problems that aroused while execution. One of which is worldwide known and one of the most prestigious projects of India - Konkan Railway, and second is internationally noted tourist spot- Amby Valley Sahara lake city. In Konkan Railway project, double twisted wire mesh was used as a basic material for variety of problems like rock fall prevention, Gravity walls at the base of rock slopes, Baby Gabions as ballast retention for railway tracks, Platform Gabions etc. Adoption of …


Lessons Learned From Two Case Histories Of Retaining Structures, Pedro Simão Sêco E Pinto, João Barradas, Arlindo Sousa Aug 2008

Lessons Learned From Two Case Histories Of Retaining Structures, Pedro Simão Sêco E Pinto, João Barradas, Arlindo Sousa

International Conference on Case Histories in Geotechnical Engineering

In this paper two case histories are addressed. The first case history describes the underpinning and reinforcement of huge retaining walls due to the crossing of the old Rossio railway station building (1886) by an underground gallery (for the Lisbon Metro). A careful study was performed for this station in order to avoid unacceptable damages. These walls sustain an embankment on which the railway platforms were built. The second case history deals with the stabilization works of a landslide in Portugal. The lessons arising from technical and non technical factors related with slides are analysed, and the anchored retaining walls …


New York City High-Rises On Rock: Uncovering The Unknown Leads To Variable Foundation Solutions, Tony D. Canale, Joel Moskowitz, James L. Kaufman Aug 2008

New York City High-Rises On Rock: Uncovering The Unknown Leads To Variable Foundation Solutions, Tony D. Canale, Joel Moskowitz, James L. Kaufman

International Conference on Case Histories in Geotechnical Engineering

Construction of high-rise towers in New York City continues to provide exciting challenges for design and construction teams. Sites are becoming increasingly more difficult to build on as “desirable” locations have long since been developed and developers are constructing on sites that were previously over looked. This paper describes two projects that provided unique challenges to the engineers and contractors. The first site is the New York Times Headquarters Tower. This site appeared to be a fairly straightforward foundation design, but became complicated as the subsurface conditions were uncovered. The second case history is the new Bank of America Tower …


Underpinning For A Distressed Building In Northest Thailand, Suksun Horpibulsuk, Apichit Kumpala, Wanchai Katkan, Runglawan Rachan Aug 2008

Underpinning For A Distressed Building In Northest Thailand, Suksun Horpibulsuk, Apichit Kumpala, Wanchai Katkan, Runglawan Rachan

International Conference on Case Histories in Geotechnical Engineering

This paper presents a case history on the failure of Suranivet 9, a student dormitory in the campus of Suranaree University of Technology (SUT), Thailand. The dormitory encountered excessive differential settlement due to the variation in soil profile. Underpinning to extend the foundations down to stable stratum was employed to strengthen bearing capacity and minimize settlement. The underpinning design and procedure were summarized. In practice, the static formula was used for the preliminary micro-pile design (selection of pile section and length for different loads and soil profiles). The undrained shear strength (Su) of SUT silty clay was approximated using standard …


Tension And Compression Micropile Load Tests In Gravelly Sand, Armin W. Stuedlein, Matt D. Gibson, Garry E. Horvitz Aug 2008

Tension And Compression Micropile Load Tests In Gravelly Sand, Armin W. Stuedlein, Matt D. Gibson, Garry E. Horvitz

International Conference on Case Histories in Geotechnical Engineering

Micropiles were selected for several upgrades to a paper machine at the Nippon Paper Industries USA Company in Port Angeles, Washington. This paper presents several aspects of the micropile design and subsequent load test performance for two separate upgrades at the paper mill. The micropile load tests, performed in tension and compression, provide a reference for micropile performance in medium dense to dense, gravelly sand. Comparison of the load test performance suggests that the common assumption of neglecting the contribution of end-bearing resistance does not adequately model micropile behavior. Additionally, evidence is presented for load transfer through the micropile casing. …


Soil Improvement By Means Of Electro-Osmosis, Sven Hansbo Aug 2008

Soil Improvement By Means Of Electro-Osmosis, Sven Hansbo

International Conference on Case Histories in Geotechnical Engineering

In this paper, the theory about electro-osmotic treatment of soil is summarized. The correlation between conventional soil char-acteristics and the most important electro-osmotic parameters, soil resistivity and electro-osmotic permeability coefficient, is indicated. Two case records exemplify the correlation between theory and reality. One of the case records concerns improvement of the preconsolidation pressure of a clay layer situated underneath a lake, which had to be filled with sand to create a building site, 800 m2 in size, for a magazine to be built. The electrodes consisted of iron rails with a weight of 25 kg/m. No dewatering at the …