Open Access. Powered by Scholars. Published by Universities.®

Social and Behavioral Sciences Commons

Open Access. Powered by Scholars. Published by Universities.®

Series

2008

James Madison University

HD R&D

Articles 1 - 4 of 4

Full-Text Articles in Social and Behavioral Sciences

Hd R&D Field Evaluation: Rapid Area Preparation Tool (Raptor), U.S. Humanitarian Demining Research And Development Dec 2008

Hd R&D Field Evaluation: Rapid Area Preparation Tool (Raptor), U.S. Humanitarian Demining Research And Development

Global CWD Repository

In October 2007 and May 2008, the U.S. Humanitarian Demining Research and Development Program (HD), located at Ft. Belvoir, VA., undertook the testing of the Rapid Area Preparation Tool (RAPTOR). RAPTOR is the latest of a series of area preparation systems on tractor platforms that HD has developed in the last decade. Systems, including the Severe Duty Tractor and Tools (SDTT) and Mantis, have undergone operational evaluations in Thailand, Nicaragua, and Afghanistan. The RAPTOR was developed by the HD program to handle all area-preparation tasks from vegetation cutting and removal (up to Category 3), to antipersonnel mine rolling, plowing, and …


Performance Evaluation Test Of The Nemesis M3, Institute For Defense Analysis, U.S. Humanitarian Demining Research And Development, Office Of The Assistant Secretary Of Defense Special Operations And Low-Intensity Conflict Sep 2008

Performance Evaluation Test Of The Nemesis M3, Institute For Defense Analysis, U.S. Humanitarian Demining Research And Development, Office Of The Assistant Secretary Of Defense Special Operations And Low-Intensity Conflict

Global CWD Repository

In its continuing program to provide a complete size-range of area-preparation systems to the world’s humanitarian demining community, the United States Humanitarian Demining Research and Development Program, located at Ft. Belvoir, Virginia, developed a lightweight area-preparation system around the ASV Inc. SR-80 rubber-tracked crawler with a family of attachments. The system, assembled by Applied Research Associates, Inc., and named the Nemesis, is intended to cut and mulch up to Category 3 (difficult, up to 10 cm diameter trees) vegetation and to remove cutting debris. Attachments used during this evaluation test were the Bradco, Inc., Mini-Mag Mulcher Model XL 165-6; the …


Performance Evaluation Test Of The Orbit Screen Model 68a And The Komplet Model 48-25 Rock Crusher, Ida, U.S. Humanitarian Demining Research And Development, Office Of The Assistant Secretary Of Defense Special Operations And Low-Intensity Conflict Aug 2008

Performance Evaluation Test Of The Orbit Screen Model 68a And The Komplet Model 48-25 Rock Crusher, Ida, U.S. Humanitarian Demining Research And Development, Office Of The Assistant Secretary Of Defense Special Operations And Low-Intensity Conflict

Global CWD Repository

At the request of the Demining Center of Ecuador, the U.S. Humanitarian Demining Research and Development Program at Ft. Belvoir, VA., undertook a performance evaluation of the Orbit Screen Model 68A and the Model 48-25 Rock Crusher, two pieces of equipment that could be used to remove antipersonnel land mines from riverbank minefields along the border of Ecuador and Peru. Although these devices could conceivably be used in tandem as a system, this evaluation focused on the performance potential of each unit to operate as a stand-alone system. A test was also conducted to see how long it would take …


Performance Evaluation Test Of The Peco Tracked Brush Blazer, Ida, U.S. Humanitarian Demining Research And Development, Office Of The Assistant Secretary Of Defense Special Operations And Low-Intensity Conflict Jan 2008

Performance Evaluation Test Of The Peco Tracked Brush Blazer, Ida, U.S. Humanitarian Demining Research And Development, Office Of The Assistant Secretary Of Defense Special Operations And Low-Intensity Conflict

Global CWD Repository

Area preparation for demining remains one of the dangerous yet necessary tasks for organizations undertaking humanitarian demining missions. To date, the U.S. Humanitarian Demining Research and Development Program has provided a number of area preparation systems. The emphasis, however, has been on light (1–2 ton) to heavy (5–15 ton) platforms with a wide range of working attachments. There was a need for a robust, lightweight cutter to complement the heavier assets available from the U.S. Humanitarian Demining Program. One such system that appeared to be a good addition to the area preparation tools available under the U.S. program was the …