Open Access. Powered by Scholars. Published by Universities.®

Social and Behavioral Sciences Commons

Open Access. Powered by Scholars. Published by Universities.®

Global CWD Repository

2010

Publication Year
File Type

Articles 1 - 30 of 66

Full-Text Articles in Social and Behavioral Sciences

12th Meeting Of The States Parties To The Anti-Personnel Mine Ban Convention (2012), Apmbc Dec 2012

12th Meeting Of The States Parties To The Anti-Personnel Mine Ban Convention (2012), Apmbc

Global CWD Repository

The 12MSP was a formal meeting of the 160 States which had, as of the time of the meeting, accepted the 1997 Convention on the Prohibition of the Use, Stockpiling, Production and Transfer of Anti-Personnel Mines and on their Destruction. It was held in accordance with Article 11 of the Convention and pursuant to the decisions of the 2009 Second Review Conference and the 2011 Eleventh Meeting of the States Parties (11MSP).

The 12MSP was important because it took place at the mid-way point between the 2009 Cartagena Summit on a Mine-Free World and the Convention’s Third Review Conference in …


The National Strategy For Mine Action In Sri Lanka 2010, The Ministry Of Economic Development- Sri Lanka Sep 2012

The National Strategy For Mine Action In Sri Lanka 2010, The Ministry Of Economic Development- Sri Lanka

Global CWD Repository

The National Strategy for Mine Action in Sri Lanka 2010


Assessment Of Development Results: Evaluation Of Undp Contribution - Lao Pdr, Undp Jul 2011

Assessment Of Development Results: Evaluation Of Undp Contribution - Lao Pdr, Undp

Global CWD Repository

This report presents an independent country level evaluation conducted by the UNDP Evaluation Office in 2010. The evaluation examines the strategic relevance and positioning of UNDP support and contributions to the development of Lao PDR under the present UNDP country programme 2007-2011. The report assesses the results of UNDP interventions under various thematic areas and makes forward-looking recommendations for the next country programme starting in 2012.


To Walk The Earth In Safety 10th Edition (Fy2010), Us Dos Pm/Wra Jul 2011

To Walk The Earth In Safety 10th Edition (Fy2010), Us Dos Pm/Wra

Global CWD Repository

Welcome to the 10th edition of To Walk The Earth In Safety. Our annual report details the United States’ Conventional Weapons Destruction (CWD) Program, a collaborative effort by the Department of State, Department of Defense, United States Agency for International Development, and the Centers for Disease Control and Prevention of the Department of Health and Human Services. These agencies strive to help countries recover from conflict and create safe, secure environments to rebuild infrastructure, return displaced citizens to their homes and livelihoods, and establish situations conducive to stability, nonviolence, and democracy.

From its initial focus on landmines dating back to …


Geneva International Centre For Humanitarian Demining 2010 Annual Report, Gichd Mar 2011

Geneva International Centre For Humanitarian Demining 2010 Annual Report, Gichd

Global CWD Repository

2010 was an important year for everyone striving for a world free of landmines, cluster munitions and other explosive remnants of war. It was particularly important for the Antipersonnel Mine Ban Convention (APMBC) and for its implementation. The evaluation of the APMBC Implementation Support Unit (ISU) confirmed the appreciation of the States Parties and other stakeholders for the effective work of the ISU and for the role played by the GICHD in hosting it.

Moreover, the entry into force of the Convention on Cluster Munitions (CCM) on 1 August 2010 represented a positive legal and political step in supporting the …


Ddasaccident590, Hd-Aid Jan 2011

Ddasaccident590, Hd-Aid

Global CWD Repository

On the 8th of December 2010 a demining accident occurred at site NR-880 near the town of El Maria within the Kassala locality in which a deminer sustained traumatic injuries whilst conducting prodder drills and thus initiating a No4 AP mine. Immediate medical care was rendered to the injured deminer who was maintained in a stable condition.


Unmas 2010 Annual Report, Unmas Jan 2011

Unmas 2010 Annual Report, Unmas

Global CWD Repository

Our work in helping to protect and empower local communities contributes to wider humanitarian, peace and development dividends, and delivers concrete and measurable results. Our success stories are the product of the generous support provided by UN Member States’ funds allocated by the UN General Assembly for the mine action components in seven peacekeeping operations, and by donors’ considerable extra-budgetary funding support. Despite challenges, 16 donor governments, the European Union (EU), the Common Humanitarian Trust Fund for Sudan (CHF) and students from Pace University in New York contributed to the Voluntary Trust Fund for Assistance in Mine Action (VTF). The …


Geneva International Centre For Humanitarian Demining 2010 Annual Report, Gichd Jan 2011

Geneva International Centre For Humanitarian Demining 2010 Annual Report, Gichd

Global CWD Repository

Annual report on the work of the GICHD for 2010.


Ddasaccident710, Hd-Aid Dec 2010

Ddasaccident710, Hd-Aid

Global CWD Repository

According to investigation report and the observation of accident point, the accident occurred in un-cleared area within the minefield. The deminer was returning back from the rest area to resume the work in his clearance lane, he entered into the minefield, stepped on PMN2 anti-personnel mine and accident happened. The worksite was well prepared and the area was clearly marked in accordance to the [Demining group] SOPs. The deminer did not consider and use the clear access lane to proceed to his working area while he was well aware about the cleared/un-cleared parts of the minefield. He was not stopped …


Ddasaccident719, Hd-Aid Dec 2010

Ddasaccident719, Hd-Aid

Global CWD Repository

On 22 December 2010 team arrived to the area on 06:30 and started operation on 07:00 working for 45 minutes and then 15 minutes break, the second round started on 08:00 for the same working and breaking period. The third round started on 09:00, [the Victim] worked in his clearance lane using metal detector and then stopped on 09:25 wanted to mark his clearance lane. He picked up marking material/equipment attempted to mark his clearance lane. On the way back he slipped out from his cleared lane to un-clear area, his right foot came on a mine and the accident …


Ddasaccident724, Hd-Aid Dec 2010

Ddasaccident724, Hd-Aid

Global CWD Repository

On 21 Dec 2011, the deminer [the Victim] started his work as usual in the assigned task for him to continue the clearance of the Mine Line (SML) which was laid as a cluster with one AT mine (M19) guarded by 3 APs M35 and after recovering and defusing one AT (19) and 2 APs (M35 / no defusing), the deminer started his work for the second period at 8:45 and he reported one signal to the team leader. The team leader left him to proceed with the proper procedures to recover and defuse the mine and at 8:55 hrs …


Ddasaccident740, Hd-Aid Dec 2010

Ddasaccident740, Hd-Aid

Global CWD Repository

On the 13th Dec 2010 at 10:37, the deminer [Victim No.1] was operating in his clearance lane excavating a detected signal, his prodder touched on a subsurface tripwire of POMZ mine which caused it to explode. According to the investigation report the signal was not pinpointed correctly and the de-miner has used pick in contrary to set procedure, during the excavation, he pulled the subsurface tripwire connected with POMZ mine. The accident resulted in superficial injuries to deminer’s hands, left thigh and left side of abdomen.


Ddasaccident801, Hd-Aid Dec 2010

Ddasaccident801, Hd-Aid

Global CWD Repository

The deminer was busy with clearance in M/F No3, Lane No1 and had an indication from his F3 mine detector. He then carried out the prodder drill investigating the signal and the mine detonated. It is unclear at present why the No4 A/P mine detonated. It appears that the mine was slightly outside the 10cm overlap of the basestick but this could not be confirmed due to the movement of the marking rocks and base stick when the blast occurred.


Ddasaccident726, Hd-Aid Nov 2010

Ddasaccident726, Hd-Aid

Global CWD Repository

The demolition team of [Demining group] arranged the smoke grenades in demolition pit in their CDS on 07:00 and then started Ordnance Disposal Operation, disposing of smoke grenades using electric demolition procedures. On 07:33 they conducted first fire by the exploder machine from their firing point. They waited for almost 18 minutes and then Technical Advisor started conducting Electric Misfire Procedures, he to correct misfire. On 08:10 the accident occurred and TA was killed immediately after accident.made manual approach


The First Meeting Of States Parties To The Convention On Cluster Munitions (2010), Ccm Nov 2010

The First Meeting Of States Parties To The Convention On Cluster Munitions (2010), Ccm

Global CWD Repository

The First Meeting of States Parties (1MSP) took place in Vientiane, Lao PDR, from 9 to 12 November 2010 and gathered some 1,200 delegates from 40 State Parties, 47 signatory States, 34 observer States and 20 international organizations (see list below).

The meeting was opened by Ambassador Gerard Corr of Ireland, Chairperson of the preparatory meeting for the 1MSP. During the first plenary meeting, the meeting confirmed by acclamation Mr. Thongloun Sisoulith, Deputy Prime Minister and Minister for Foreign Affairs of the Lao People’s Democratic Republic, as President of the 1MSP to the CCM.


Ddasaccident714, Hd-Aid Oct 2010

Ddasaccident714, Hd-Aid

Global CWD Repository

I remember on the 25th of Oct. 2010 on the first part of work I cleared 3 AP mines from the first cluster as all the AT mines are cleared from the belt, then I headed to the next cluster following the team leader orders and started removing a 12 o’clock mine, when I was near its suggested location after making visual check and cleared the grass around it using the light rake I were no injuries thanks god, then the team leader came with deminer {name removed] and checked me and evacuated me walking to the ambulance which was …


Ddasaccident713, Hd-Aid Oct 2010

Ddasaccident713, Hd-Aid

Global CWD Repository

TYRE, Lebanon — A sapper was killed and at least four others were wounded on Monday when a cluster bomb exploded as their team cleared a mine-infested field in southern Lebanon, a security source said.


Ddasaccident591, Hd-Aid Oct 2010

Ddasaccident591, Hd-Aid

Global CWD Repository

On the 15th of October 2010 a demining accident occurred on site DA-SS-2091 in the Kapoeta locality of Eastern Equatoria where the international TFM sustained fatal injuries due to an uncontrolled detonation which occurred whilst his excavating/preparing a No4 AP mine for demolitions in situ. After initial medical care, the seriously injured TFM later succumbed to his wounds while on the Kapoeta airstrip under the attention of medical personnel awaiting air evacuation to more suitable medical facilities.


Ddasaccident808, Hd-Aid Oct 2010

Ddasaccident808, Hd-Aid

Global CWD Repository

At 08:16 the Head of the Operational Management of [Demining group] Mr.[Name removed] reported to the radio-operator [Name removed] about mine explosion in the mine field No. 2 - Arjamazor village Kevron. A deminer of the group #4 [the Victim] was injured from PMN-2 and ML-7. Their characteristics are indicated in below table.


Ddasaccident753, Hd-Aid Oct 2010

Ddasaccident753, Hd-Aid

Global CWD Repository

On the 7th Oct 2010 at 08:40, the deminer [the Victim] initiated a PMN anti-personnel mine with a pick outside of his clearance lane which caused the accident. The section leader was around 60 meters away busy in taking coordinates of a found mine with GPS and the team leader was busy in admin area updating the attendance sheet. The deminer was busy in the minefield without being observed by the command group for almost 15 minutes during the operation while the accident happened.


Ddasaccident606, Hd-Aid Oct 2010

Ddasaccident606, Hd-Aid

Global CWD Repository

On Saturday 02 October 2010 at approximately 10:00am a [Civil Contractor] grader struck an AT mine approximately one meter from the road center-line whilst carrying-out maintenance on the Juba to Nimule Road. The grader operator suffered serious injuries as a result of the blast. He was evacuated to a hospital in Juba, stabilized and then as he was from Uganda he was evacuated the following day to Kampala for further treatment. The grader operator later died from his injuries 20 October in Kampala.


Ddasaccident703, Hd-Aid Sep 2010

Ddasaccident703, Hd-Aid

Global CWD Repository

The deminer was working in the centre lane in the main minefield 346 and he recovered 6 M14 APs. At 12:15 hrs he started to approach AP M14 and he located one cluster then he moved to the next one, and while he was conducting visual check stage, he did not follow the proper procedure to remove the grass ,instead of using grass cutter to remove the grass he used his bared hand to pull the grass which accidentally caused the blast.


Ddasaccident640, Hd-Aid Sep 2010

Ddasaccident640, Hd-Aid

Global CWD Repository

According to the witness statements and the physical observation of the accident point, the accident happened while the de-miner was walking from the rest area to his clearance lane. He stepped on missed PMN anti-personnel mine in cleared area. Therefore, this mine was missed during the clearance operation. The exploded mine resulted in below knee amputation of deminer’s right leg, multiple injuries on his left leg, left foot heel, right hand palm and some minor injuries on his right arm. The de-miner was sent to Khost hospital after receiving first aids in the site. While accident happened the de-miner did …


Ddasaccident655, Hd-Aid Sep 2010

Ddasaccident655, Hd-Aid

Global CWD Repository

Deminer was approaching 9 O’clock M35 AP mine on one of the main mine belt clusters, after she removed the AT mine she located the M35 mine and started to excavate beside the mine, accidently she hit the mine by the heavy rake and caused the blast


Ddasaccident759, Hd-Aid Sep 2010

Ddasaccident759, Hd-Aid

Global CWD Repository

On 06 Sep 2010, when Mr. [the Victim] was working in his clearance lane and excavated a detected signal, during the excavation drill his excavation tool touched the mine and caused it to go off. According to investigation report the cause of the accident was the wrong excavation technique, as he started excavation drill close to the pinpointing target. He had gone down and did not expand the trench to allow entry from the side, which caused to stroke his excavation tool on the top of the mine. Due to the injuries sustained on his eyes, it seems that the …


Ddasaccident693, Hd-Aid Aug 2010

Ddasaccident693, Hd-Aid

Global CWD Repository

While the deminer was clearing an area assigned to him by the team leader and after he recovered an AT Saci mine he entered the contaminated hazardous area trying to locate the AP M14 12 o’clock mine with out following the SOP and the proper procedure , then he stepped on a non cleared area and activated the M14 which caused a badly injured to his left foot.


Ddasaccident729, Hd-Aid Aug 2010

Ddasaccident729, Hd-Aid

Global CWD Repository

On 17 August 2010 while [the Victim] was working in his clearance lane, his excavation tool touched a mine and caused it to go off. According to the investigation report and the injuries sustained by victim deminer, it seems that the de-miner has excavated a detected signal carelessly and in contrary to their SOP. It means signal was not pinpointed correctly and the de-miner had used the excavation tool directly on the top of mine, so the accident happened. Unfortunately the de-miner did not put his PPE on, therefore, he got severe injuries on his eyes, whole face, neck, chest, …


Ddasaccident730, Hd-Aid Aug 2010

Ddasaccident730, Hd-Aid

Global CWD Repository

On 17 August 2010 Mr. [the Victim] the deminer was working in his clearance lane excavating a detected signal, his excavation tool touched a mine and caused it to explode. According to the investigation report the signal was not pinpointed correctly and the de-miner has used his bayonet directly on the top of anti-personnel mine, so the accident happened. Unfortunately the victim deminer was not fully dressed with PPE, so he got severe injuries on his eyes, whole face and finger of his left hand.


Ddasaccident658, Hd-Aid Aug 2010

Ddasaccident658, Hd-Aid

Global CWD Repository

On 15 August 2010 while [the Victim] deminer was busy in his clearance lane excavating a detected signal, his excavation tool touched a mine and caused it to explode. According to the investigation report the signal was not pinpointed correctly and the deminer has used his excavation tool directly on the top of anti-personnel mine and the accident happened. Fortunately the victim deminer was fully dressed with PPE, so he got a superficial injury between the thumb & index finger of his right hand.


Ddasaccident659, Hd-Aid Aug 2010

Ddasaccident659, Hd-Aid

Global CWD Repository

The incident happened while the deminer trying to investigate a signal using the heavy RAKE. The deminer was close to the mine and the distance was less than the RAKE handle 2.2 m that the area very sloppy (water course) and the deminer was looking for the missing mines.