Owners’ Satisfaction Level With The Use Of Alternative Project Delivery Methods In Water And Wastewater Infrastructures, Pramen Shrestha, Jacimaria R. Batista
Owners’ Satisfaction Level With The Use Of Alternative Project Delivery Methods In Water And Wastewater Infrastructures, Pramen Shrestha, Jacimaria R. Batista
College of Engineering: Graduate Celebration Programs
In 2013, the American Society of Civil Engineers (ASCE) Report Card for America’s Infra-structure stated that the US needs up to $1.3 trillion in capital investments to replace the aging water pipes and repair the wastewater infrastructures. It is further believed by the industry that the streamlined approach of alternative project delivery methods, such as Design-Build (DB), and Construction Manager At-Risk (CMAR) helps ensure the economical and timely design and construction of the water and wastewater infrastructures.