Open Access. Powered by Scholars. Published by Universities.®

Social and Behavioral Sciences Commons

Open Access. Powered by Scholars. Published by Universities.®

Engineering

Claremont Colleges

1996

Articles 1 - 1 of 1

Full-Text Articles in Social and Behavioral Sciences

Cost Scale-Up Factors For Airport Construction, Donald S. Remer, Christopher Wong '96 Jan 1996

Cost Scale-Up Factors For Airport Construction, Donald S. Remer, Christopher Wong '96

All HMC Faculty Publications and Research

Engineers must often make a quick "ballpark" cost estimate of a new plant, facility, or piece of equipment before the detailed design phase. One easy way to obtain such an estimate is to base the cost on a known cost for a similar plant, facility, or piece of equipment by using the ratio of the capacities or sizes of the known and proposed item raised to an exponent R. This predesign cost-estimating approach is especially useful for doing sensitivity analyses and feasibility studies for which a high degree of accuracy is not required. This cost-capacity or power-factor model was …