Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Geology

Environmental Indicators and Impact Assessment

1990

Articles 1 - 1 of 1

Full-Text Articles in Physical Sciences and Mathematics

A Resource Inventory And Impact Analysis Of Great Bog And The Horse Point Delta/Esker System, Problems In Environmental Science Course (Biology 493), Colby College, Biologists Organized For Ecosystem Assessment, Colby College Jan 1990

A Resource Inventory And Impact Analysis Of Great Bog And The Horse Point Delta/Esker System, Problems In Environmental Science Course (Biology 493), Colby College, Biologists Organized For Ecosystem Assessment, Colby College

Colby College Watershed Study: Other Area Studies

In May of 1990, Tilcon-Maine, Inc. submitted an application to mine gravel on the east side of Horse Point Road on Horse Point in the Town of Belgrade. The project site covers 46 acres and the proposed excavation covers 16 acres. An estimated 740,000 cubic yards of material will be removed over a period of six or seven years (Pfister, pers. comm.). According to Tilcon (Timson et al., 1990) the maximum depth of the pit will be 78 feet and the bottom of the pit will be a minimum of 6 feet above the water table. At the present time …