Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Utah State University

Water Resource Management

PDF

Dams

Articles 1 - 1 of 1

Full-Text Articles in Physical Sciences and Mathematics

Mix Design Investigation - Roller Compacted Concrete Construction, Upper Stillwater Dam, Utah, United States Department Of The Interior, Bureau Of Reclamation Jun 1984

Mix Design Investigation - Roller Compacted Concrete Construction, Upper Stillwater Dam, Utah, United States Department Of The Interior, Bureau Of Reclamation

Dams

Upper Stillwater Dam will be the first concrete dam constructed by the Bureau of Reclamation utilizing the RCC (roller compacted concrete) construction technique. RCC is concrete with zero slump consistency, which is deposited in horizontal lifts and consolidated in place by a smooth drum vibrating roller. This method of construction was first proposed in the early 1970's [1, 2, 3]* and was demonstrated successfully in emergency spillway repairs at Tarbela Dam, Pakistan [3], in the construction of Shimajigawa Dam, Japan, and Willow Creek Dam, Oregon.