Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Physical Sciences and Mathematics

Methods For Biological, Chemical, And Physical Analyses In Reservoirs, Penelope E. Kellar, Sherell A. Paulson, Larry J. Paulson Dec 1980

Methods For Biological, Chemical, And Physical Analyses In Reservoirs, Penelope E. Kellar, Sherell A. Paulson, Larry J. Paulson

Publications (WR)

This manual contains detailed descriptions of biological, chemical and physical sampling and analytical procedures used at the Lake Mead Limnological Research Center. The manual was prepared in response to requests made by numerous individuals involved in the Las Vegas Valley Water Quality Program. This manual represents what we consider to be a reasonably complete compilation of methods useful in studying both general and specific limnological questions. While each section is sufficiently detailed to be of use to investigators with little experience in limnological methodology, the methods can be used on a wide variety of lakes and reservoirs, with relatively little …


The Limnological Status Of Lake Mead And Lake Mohave Under Present And Future Powerplant Operations Of Hoover Dam, Larry J. Paulson, John R. Baker, James E. Deacon, U.S. Water And Power Resources Service Jan 1980

The Limnological Status Of Lake Mead And Lake Mohave Under Present And Future Powerplant Operations Of Hoover Dam, Larry J. Paulson, John R. Baker, James E. Deacon, U.S. Water And Power Resources Service

Publications (WR)

The ever-increasing demand for energy in the southwest has led to a search for additional sources of power generation. Coal-fired powerplants currently provide most of the baseline energy in the southwest, but this must be supplemented with hydroelectric power during periods of peak demand. In order to provide additional peaking power, the U.S. Bureau of Reclamation is considering a number of projects to modify existing hydroelectric facilities, or add new facilities in the Lake Mead Recreation Area.

The Hoover Powerplant Modification Feasibility Investigation was authorized by Congress on December 16, 1975 to determine the feasibility of: (i) adding one or …