Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Physical Sciences and Mathematics

Nutrient Interactions Among Reservoirs On The Colorado River, Larry J. Paulson, John R. Baker Jun 1980

Nutrient Interactions Among Reservoirs On The Colorado River, Larry J. Paulson, John R. Baker

Publications (WR)

Interactions among physical, chemical and biological processes in reservoirs can significantly alter the characteristics of the discharge (Neel 1963, Wright 1967, Hannan 1979) that, in turn, can influence the ecology of the river downstream .(Ward and Stanford 1979). Investigations of the Colorado River, system reveal that reservoir-induced changes in the river can also affect downstream reservoirs. The formation of Lake Powell, in 1963 was accompanied by reductions in suspended sediment and nutrient loading and changes in the seasonal temperature and discharge cycles of the Colorado River. In this paper, we evaluate how these changes have influenced the nutrient and trophic …


The Limnological Status Of Lake Mead And Lake Mohave Under Present And Future Powerplant Operations Of Hoover Dam, Larry J. Paulson, John R. Baker, James E. Deacon, U.S. Water And Power Resources Service Jan 1980

The Limnological Status Of Lake Mead And Lake Mohave Under Present And Future Powerplant Operations Of Hoover Dam, Larry J. Paulson, John R. Baker, James E. Deacon, U.S. Water And Power Resources Service

Publications (WR)

The ever-increasing demand for energy in the southwest has led to a search for additional sources of power generation. Coal-fired powerplants currently provide most of the baseline energy in the southwest, but this must be supplemented with hydroelectric power during periods of peak demand. In order to provide additional peaking power, the U.S. Bureau of Reclamation is considering a number of projects to modify existing hydroelectric facilities, or add new facilities in the Lake Mead Recreation Area.

The Hoover Powerplant Modification Feasibility Investigation was authorized by Congress on December 16, 1975 to determine the feasibility of: (i) adding one or …