Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Physical Sciences and Mathematics

Simulation Of Daily And Monthly Stream Discharge From Small Watersheds Using The Swat Model, Crystal A. Spruill, Stephen R. Workman, Joseph L. Taraba Nov 2000

Simulation Of Daily And Monthly Stream Discharge From Small Watersheds Using The Swat Model, Crystal A. Spruill, Stephen R. Workman, Joseph L. Taraba

Biosystems and Agricultural Engineering Faculty Publications

The Soil and Water Assessment Tool (SWAT) was evaluated and parameter sensitivities were determined while modeling daily streamflows in a small central Kentucky watershed over a two-year period. Streamflow data from 1996 were used to calibrate the model and streamflow data from 1995 were used for evaluation. The model adequately predicted the trends in daily streamflow during this period although Nash-Sutcliffe R2 values were –0.04 and 0.19 for 1995 and 1996, respectively. The model poorly predicted the timing of some peak flow values and recession rates during the last half of 1995. Excluding daily peak flow values from August …


Effects Of Longwall Mining On Hydrology, Leslie County, Kentucky Part 2: During-Mining Conditions, Shelley Minns Hutcheson, James A. Kipp, James S. Dinger, Lyle V.A. Sendlein, Daniel I. Carey, Gregory L. Secrist Jan 2000

Effects Of Longwall Mining On Hydrology, Leslie County, Kentucky Part 2: During-Mining Conditions, Shelley Minns Hutcheson, James A. Kipp, James S. Dinger, Lyle V.A. Sendlein, Daniel I. Carey, Gregory L. Secrist

Report of Investigations--KGS

The effects of longwall coal mining on hydrology in the Eastern Kentucky Coal Field are being investigated. The study area is in the Edd Fork watershed in southern Leslie County, over Shamrock Coal Company's Beech Fork Mine. Longwall panels approximately 700 ft wide are separated by three-entry gateways that are approximately 200 ft wide. The mine is operated in the Fire Clay (Hazard No. 4) coal; overburden thickness ranges from 300 to 800 ft. Mining began in panel 1 in September 1991 and concluded with panel 8 in September 1994. Long-term monitoring consisting of a network of piezometers and time-domain …