Open Access. Powered by Scholars. Published by Universities.®
![Digital Commons Network](http://assets.bepress.com/20200205/img/dcn/DCsunburst.png)
Physical Sciences and Mathematics Commons™
Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 2 of 2
Full-Text Articles in Physical Sciences and Mathematics
Evaluation Of Alternative Project Delivery Methods In Water And Wastewater Projects, Ruiko Maharjan
Evaluation Of Alternative Project Delivery Methods In Water And Wastewater Projects, Ruiko Maharjan
UNLV Theses, Dissertations, Professional Papers, and Capstones
The United States (U.S.) is facing significant challenges in addressing aging water infrastructure. Most of the drinking water infrastructure is reaching the end of their useful lives. The American Water Works Association (AWWA) estimated that it will cost about $1 trillion to repair or replace drinking water pipes. Over the next 20 years, it will cost about $298 billion to fix or expand pipes of the nation's wastewater and storm-water systems (AWWA, 2012). Owners, engineers, and contractors are using Alternative Project Delivery (APD) methods - e.g., Design-Build Construction Management-at-Risk Construction Management/General Contractor- to build water and wastewater projects in order …
Owners’ Satisfaction Level With The Use Of Alternative Project Delivery Methods In Water And Wastewater Infrastructures, Pramen Shrestha, Jacimaria R. Batista
Owners’ Satisfaction Level With The Use Of Alternative Project Delivery Methods In Water And Wastewater Infrastructures, Pramen Shrestha, Jacimaria R. Batista
College of Engineering: Graduate Celebration Programs
In 2013, the American Society of Civil Engineers (ASCE) Report Card for America’s Infra-structure stated that the US needs up to $1.3 trillion in capital investments to replace the aging water pipes and repair the wastewater infrastructures. It is further believed by the industry that the streamlined approach of alternative project delivery methods, such as Design-Build (DB), and Construction Manager At-Risk (CMAR) helps ensure the economical and timely design and construction of the water and wastewater infrastructures.